Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

Process Engineer

I am currently available for work
Serial No: 13717

List top 5 skills: educator, engineering, management
Short Bio:

I have extensive extperience in introducing and implementing lean processes into a manufacturing/production environment, leading people, managing them in a change environment, studying designs and drawings in order to give suggestions, recommend changes, modify existing designs and generally helping to the best possible solution. Also a highly skilled communicator and someone who is determined and thrives to offer the best solutions available. I am also flexible, a good listener

Current location: 

Moravian-Silesian Region, Czech Republic - View on map

Nationality: 

czech

Spoken languages: 

english, polish

Locations I am interested in working:

Anywhere



PROFESSIONAL EXPERIENCE

HUISMAN KONSTRUKCE S.R.O. MARCH 2010 – PRESENT

 LEAN MANUFACTURING ENGINEERING LEADER

 I led a team of 4 engineers in introducing and implementing lean manufacturing into the Czech plant which consists of over 850 staff working in a 35,000m2 under roof area. I introduced new production processes and new work flows. Production increased by 30% with only minimal financial outlay. I arrange the training of operators and supervisors in these new techniques and flows. We managed to reduce the Pipe Lay System production time from 28 to 18 weeks among others. This implementation process is ongoing and we are introducing new working processes throughout all departments but this is being done in a carefully planned and phased manner. I have extensive experience in managing staff in change environments and through process and production changes..

 SITE COMMISSIONING MANAGER

The role entailed planning and supervising the commissioning of all final assemblies on site prior to shipping. The role included the full testing, trial running and commissioning of the machinery. Plus I had to ensure that all contract criteria was achieved prior to final handover. I also had to compile all relevant documentation for each project for the client. My time in the role included being based in Italy for 5 months while I was handling the sky shuttle project.

SUNGWOO HITECH, S.R.O. DECEMBER 2006 – JANUARY 2010

 SPECIALIST PROCESS ENGINEER

– I led a large engineering team

– Setting-up of production processes and work flows

– Design and implementation of new assembly lines

– I was based in S. Korea for4 months – YN (KIA VENGA) – project development, production lines concept set-up; co-operation with HYUNDAI MOTOR COMPANY, followed by start-up of mass production in Czech Republic

– Participation on new assembly lines development – analysis and solving of quality issues with other departments and customers (HMMC & KMS)

– Optimizing of serial production processes

– Maintenance of production lines

– SPC – for critical parts

– NCR- Non Conformity monitoring and reporting

– FMEA – for new assembly

PROFESSIONAL EXPERIENCE

– TPM – for assembly lines

– 5S – for operators and for process engineering

– TQM – cooperation on the concept implementation

– PPAP – cooperation with the Quality and Production departments (KMS & HMMC)

PP AGENCY JANUARY 2006 – NOVEMBER 2006

 OVERSEAS BUSINESS ADVISOR (PUBLIC RELATIONS)

Promoting our client’s interest’s in foreign trading markets.

NEW ZEALAND BASED ROLE – JANUARY 2004 – JULY 2005

 WORKING AS A GROUP LEADER

ACESAME.CZ COMPANY NOVEMBER 2002- NOV 2003

 ENGINEERING ANALYST.

I undertook the detailed analysis of new vehicles and their parts. When the results were obtained I presented and explained them to our clients so that they could evaluate the findings and then act accordingly.

 TWI – LEAN TRAINING WITHIN INDUSTRY – PRAGUE

 TPM – INVENTION CONSULTING CERTIFICATE

 LEADERSHIP – MEK – CERTIFICATED

 AUTOCAD MECHANICAL 2008 – ADEON CZ CERTIFICATE

 OTHER COURSES – EXCEL, WORD, POWERPOINT, OFFICE ETC.