CV, Tunisian Mechanical QA and QC Engineer looking globally

Available
Serial No: 16665
Skills keywords: hydrotesting, pipeline, power plan cpf, project engineering

Short Bio:

Mechanical engineer, with an extensive experience in the oil&gas Industries (QA/QC, Welding,Piping,NDT,Hydrotest, Project Engineering...)
 Certified Auditor, Quality Manager ISO 9001

 Training: ASME IX: Procedures & welders qualification

 Standards. ASME V: Non destructives examinations standard (NDT).
 ASME B31.3 & B31.1: Inspection & testing of process & power piping systems.

 Welding Inspection According to CSWIP 3.1

 Training about the NDT (VT, PT, RT)

Current location:  Nabeul, Tunisia - View on map
Nationality: tunisian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: Arabic, english, french, italian
Location I am interested in working: Anywhere

EDUCATION/TRAINING

2002-2003 Baccalaureate Experimental Science

H am m am et – Tunisia Mohamed Boudhina High School

2003-2008 Mechanical Engineering Diplomas

Tunis – Tunisia Engineering National School of Tunis (ENIT)

 Certified Auditor, Quality Manager ISO 9001

 Training: ASME IX: Procedures & welders qualification

 Standards. ASME V: Non destructives examinations standard (NDT).

 ASME B31.3 & B31.1: Inspection & testing of process & power piping systems.

 Welding Inspection According to CSWIP 3.1

 Training about the NDT (VT, PT, RT)

 First Aid Training

 Level II Welding Inspector

Languages: French: Fluent

English: Fluent

Italian: Beginner

Arabic: Mother tongue

Softwares: Word, Excel, Ms-office….

PROFESSIONAL EXPERIENCE

May.2014 – Today ACOSERV, PETROFAC, CONSTRUCTION & COMMISSIONING OF CRG#8 FLOW LINE TIE IN AND ASSOCIATED WELL HEAD DEVELOPMENT WORK

Kerknah, Tunisia Project Engineer / Site Supervisor

 Coordinating Between Engineering Disciplines

 Supervising Site Activities

 Preparing daily Report, Weekly Schedule and Weekly progress

 Managing Personnel and Equipment on site

 Interlocutor with the Client

Jan.2013 – April.2014 SNC LAVALIN, A Combined Cycle Power Plant

Sousse, Tunisia QA/QC Piping & Welding Inspector

 Prefabrication & erection of 70 000 welded inchs (CS-SS-Alloy steels P91

P11& P22 Grades, Iconel and Duplex).

 Erection of 700 tonnes / hr Steam Generator: 6000 erected inches P91-P11- P22 & CS + all steel structure + painting & insulation.

 Erection of Gas Turbine & Steam Turbines: 5000 welded inch CS-SS-P91- P22-P11 + 2000 tonnes mechanical equipments + painting & insulation.

 Water Process & Fuel Storage Tanks 30 000 m3 – Erection & Painting.

 Prefabrication & Erection of 3000 tonnes steel structure.

 Welding Book monitoring.

 Welding inspection of pressure vessels

 Test pack document approval & Hydrotest

 NDT request

 PWHT monitoring

Dec.2010 – Jun.2012 SICILSALDO/Saipem, Central Process Facility

H a ssi M a ssoud, Algeria QA/QC Engineer

 Prefabrication &Erection of 200 000 INCH Piping Process toASMEB31.3 (SS,CS,Low Temperature Steel and Alloy Steel)

 Steel Structure : Erection of 1200 Tonnes

 Check of Consumables Electrodes & Rods.

 Check of Material (Piping, fitting, flanges, valves…).

 Inspection & Monitoring of site welding activities (Check conformity with

WPS, Consumables, Material certificates, and Equipment’s calibration).

 Heat Treatment inspection (Preheat – PWHT).

 Visual & dimensional inspection of erected lines.

 Monitoring of others NDT activities (NDT request – RT/UT- PT/MT- Hardness-PMI).

 Welding repair monitoring.

 Welding Book monitoring.

 Test Package Check.

 Hydro test Witnessing.

 Piping supports inspection.

 Punch list preparation & monitoring.

 Painting & insulation inspection.

 Appliance of the quality assurance

 Contribution in the drafting of the internal quality procedures of the company.

 Making the non-conformity reports and taking the necessary actions

to prevent it in the future.

Aug.2009 – Aug.2010 AlSTOM, A Combined Cycle Power Plant

Ga bes, Tunisia QC Inspector

 Prefabrication & erection of 60 000 welded inchs (CS-SS-Alloy steels P91

P11& P22 Grades, Iconel and Duplex).

 Erection of Gas Turbine & Steam Turbines: 5000 welded inch CS-SS-P91-

P22-P11 and + 2000 tonnes mechanical equipments + painting & insulation.

 WPS, PQR, WPQ approvals.

 Welding & NDT supervision.

 NDT Request

Mar.2009 – Aug.2009 WINSTAR, Central Process Facility

El B orm a , Tunisia Piping Supervisor

 Check of the qualifications of the welders and their ID cards.

 Visual and Dimensional Inspection on fits-up and on finished Welds.

 Welding procedure & welders qualifications.

 Review of quality control documents.

 Piping: welding, NDT.

 Pressure test & final documentation approval.

Jul.2008 – Feb.2009 SOMECO/PIONER, Central Process Facility

J inen N orth, Tunisia Piping Supervisor

 ITP Review (conformity with site specification and ASME code).

 Material conformity (pipes, fittings, flanges, valves, bolting…).

 Consumable conformity (Electrodes, wires, shielding gas…).

 Welding equipment calibration check

 Pipe fitter qualification test

 Welder and PQR qualification test

 Survey inspection (leveling, verticality…)

 Welding Monitoring (welding Book, weld repair…)

 Test pack document & Hydro test approval.

 






popup-img