CV, QA/QC Welding Inspector Looking Worldwide

Available
Serial No: 34001
Skills keywords: piping, project management, structure, welding gauge, welding inspector

Short Bio:

Since 1999 have been involved in cement, manufacturing, line Inspection, qualification, fabrication and construction of piping and structures for refinery, petrochemical equipment, pressure vessels and plant. Have good experience in interpretation of standard (BSEN, AWS, ASME, API, ASTM), Quality Assurance/Quality Control inspection activities (PQR-WPS-WQT, method of NDT-NDE) monitoring of project specifications . Understanding of work sequence welding fabrication (before, during, after welding).

Current location:  Batam, Indonesia - View on map
Nationality: Indonesian
Preferred Sector of Employment:  Oil, Gas and Energy, General Management
Spoken languages: english, french, indonesia
Location I am interested in working: Anywhere

Qualifications

• Degree of Mechanical Engineering of Engineering Faculty, Andalas University, Padang West Sumatera.

Objective

My personality as a hard worker, a highly motivated, creative, full of idea and intention toward improvements. Capable to work independently and as a team either, easily to communicate among all levels of people,good team player, ability to work with minimum supervision, excellent organizational and fast learner type of person would bring benefit to your company.

Profile

Since 1999 have been involving in cement, manufacturing, line Inspection, qualification, fabrication and construction piping and structure for refinery, petrochemical equipment, pressure vessel and plant. Have good experience interpretation standard (BSEN, AWS, ASME, API, ASTM), Quality Assurance/Quality Control inspection activities (PQR-WPS-WQT, method of NDT-NDE) monitoring under specification project. Understand of work sequence welding fabrication (before, during, after welding), installation and pre-commissioning prior to start up at onshore project. Have strong skill level of supervision, inspection, technical drawing (Isometric, key plan and elevation) and familiar in using several kind of welding measurement tools (Welding gauge, Hi-lo gauge, Vernier calliper, Micrometer, Pressure gauge and Hardness gauge).

Certifications And Training

• Certified CSWIP 3.1 Welding Inspector Level 2 – TWI Training & Examination Services, TWI Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, United Kingdom – Cert No. 98324

• Certified by LP MIGAS as Welding Inspector (CWII)

• Certified ASNT NDT Radiographic Interpretation Level 2 – Cert No. 13266

• Certified ASNT NDT Ultrasonic Testing Level 2 – Cert No. 13928

• Certified ASNT NDT Liquid Penetrant Testing Level 2 – Cert No. 13785

• Certified ASNT NDT Magnetic Particle Testing Level 2 – Cert No. 13785

• Certified AK3 (Occupational Safety & Health Professional) – Cert. No. 7232/PK3/AJ/14/2011/PO

• Project Management – PMGS Group (Project Management Institute) Singapore

• Auditing Skill based on ISO 19011:2011

 

Professional Experience

PT. Jamrud Andalas, Jaya
May 2015 – October 2015

QC Inspector

Job Descriptions:

 Carry out dimentional inspection per work. Supervise the supervising installation works properly. Review of incoming raw material to verify tracebility and various inspection consumable.Pre-welding weld joint fit-up inspection and in-process welding inspection.Responsibility to plan and schedule the work within the given deadlines. To ensure the efficiency of the piping system that if it is working properly and follow up issue Non Conformance Reports (NCR) and punch list as necessary. Daily inspection check welding parameter, storage and handling, pre-heat implementation as per WPS used then perform visual inspection for complete welding, ensure the safety measures and procedures at the work place and needs to implement them as well. B31.1/B31.3/API1104.

Project Involved – Pipelines and Gas Filter Project (PT. Transportation Gas Indonesia)

 

PT. Schneider MFG, Batam
May 2014 – May 2015

Project Engineer

Job Description:

 Oversee and coordinate the execution of project activities from contract review phase to close by various PT. Schneider MFG Batam. Leader and participant in creating, launching or implementing new products and lead teams in developing and defining business requirements for launch new products. Preparation cost estimates, scopes of work, scheduling start production till shipping, construction management, method of statement and risk analysis.Prepares work to be estimated by gathering proposals, blueprints, specifications, and related documents. Ensuring a project is fit-for-purpose and adheres to the project budget and schedule.Responsible to perform cost analysis, contract review and select best supplier to meet the product requirement as audit conducted.

JKC Australia LNG Pty (CHIYODA Co)
September 2013 – March 2014

QC Inspector

Job Descriptions:

 Check cutting, marking and transferring heat number material.Ensuring fit up and joint preparation as per approved WPS such as internal or external misalignment, root gap, angle bevel.Make sure the cleanliness of join preparation (free from oil, wet, dust, and contaminant).Check and correct consumable used, correct WPS used, correct welder qualification for welding. Visual inspection for complete welding, the welding is free from crack, distortion and meet the client specification and acceptance criteria in AWS D1.1.Arrange the NDT requirement as per NDT drawing and make sure identification for any join number in erection is suitable with NDT drawing and documentation system. Check and up date for any document such as new drawing revision, site query, WPS register, welder qualification register. ASME IX/AWSD1.1/B31.1.

Project Involved – Roof LNG Tank and Piping Fabrication Project

PT. Dolly Putri Marsada
August 2012 – July 2013

QC Inspector

Job Description:

 Inspection of fit-up, welding & weld visual at site & yard. Conduct the welder test prior to start the fabrication activities. Material verification (heat number and identification comply to certificate) and check the material condition is free from damage, witnessdimensional, check fit up and joint preparation as per approved WPS such as misalignment, root gap and bevel angle. Check and monitoring welding activities as per ITP, client specification. Daily inspection activities, make sure pre-heat implementation as per WPS, check and correct consumable used, correct WPS used, correct welder qualification for welding. Perform visual inspection for complete weldingto meet the client specification and acceptance criteria. Review NDT result that performed by NDE Company.Test package andhydrotest until commissioning. ASME IX/ASME V.

Project Involved – APLNG – PT. Word Wide Equipment South East Asia

PT. ROTARY Engineering Indonesia
April 2011 – May 2012

QC Inspector

Job Description:

 Ensure welding maintenance activity before project started.Conduct the batch test for consumables. Qualification the machine welding process. Monitoring and ensure the using of approved Procedures. Preparing preliminary welding procedures for projects.Check the materials are per requirements. Ensure the preheat per requirements (WPS). Monitoring requirement test such as NDT is done. Review and approve Welding Procedure. Executing Procedure Qualification Test, Welder qualification test and Reports. Preparing of Weld joint traceability& Material traceability Records.Carry out the visual and dimensional inspection. Document and report preparation (both of welding and repair). Assist the client’s inspectors and welders for any requires related to quality matters.AWSD1.1/B31.1/B31.3/ASME IX.

Project Involved – Singapore Parallel Train Olefins Expansion (Shaw Webster & Stone)

PT. NEXUS Engineering,  Indonesia
February 2010 – March 2011

QC Structure Inspector

Job Description:

 Check fit up and joint preparation as per approved WPS such as internal or external misalignment, root gap, angle. Check the cleanliness of join preparation (free from oil, wet, dust, and contaminantion). Check the material traceability by heat number identification and material condition are free from damage and unacceptable condition as per client spec. Daily patrol inspection activities, make sure pre-heat implementation as per WPS, check and correct consumable used, correct WPS used, correct welder qualification for welding assignment. Visual inspection for complete welding, the welding is free from crack, distortion and meet the client specification and acceptance criteria. Coordinate with engineering or client for any quality issue. Check and up date for any document such as new drawing revision, site query, WPS register, welder qualification register. AWSD1.1/ASME IX/ASME V.

Project Involved – North Belut Central Processing PlatformProject (PT. McDermott Indonesia)

PT. ROTARY Engineering, Indonesia
February 2009 – January 2010

QC Piping Inspector

Job Description:

 Daily inspection activities isensure pre-heat implementation as per WPS, check and correct consumable used, correct WPS used, correct welder qualification for welding, perform visual inspection for complete welding, the welding is free from crack, distortion and meet the client specification and acceptance criteria, arrange the NDT requirement as per Weld Map, Review NDT result that performed by NDE Company, Coordinate with client for Final Inspection. Surveillance on daily activates at site to ensure the quality and safety. Plan and Scheduling the stage wise Inspection of modules and structures. Update daily progress to client and management. B31.1/B31.3/ASME IX.

Project Involved – Universal Terminal Crude and Petroleum Storage (Hin Leong Pte Ltd)

PT. PSEC MFG Batam
October 2002 – January 2009

QA/QC Supervisor

Job Description:

 Responsible to establish general process method and instruction QA/QC as per BOM/Specification and originates visual aids, alert notice and other process document. Responsible to conduct regular process audits to ensure all processes parameters are consistently within product specification. Do dimensional inspection after end preparation and requalification by QA/QC according with latest revision of drawing. Responsible and collect all checksheet and other control document to make sure all are filled up and kept properly as ISO standard.

PT. NSP Technology
March 2001 – May 2002

Production Supervisor

Job Description:

 Lead, control and manage man power to action quality and quantity target. Ensure delivery output based on accuracy and volume reliability. Control daily production output. Motivate and encourage leaders and operators under my supervisions.

PT. SEMEN PADANG
March 1999 – September 1999

Mechanical Engineer

Job Description:

 Drawing Cement Silo and compose both part list. Part order list to make Dust Filter. Check and inspection the fabrication activities. Update drawing document to complete commissioning.

Project Involved – Design a dust filter for cement silo

 

References

Available on request

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 






popup-img