CV, QA,QC Manager and Senior Engineer looking globally

Available
Serial No: 16611
Skills keywords: project management, QAQC, welding

Short Bio:

An Enthusiastic and dedicated professional Mechanical Engineer with 17 years of work experience in Oil & Gas EPC type projects. My experience spans various with Oil & Gas sectors, viz., Petro-chemical refineries, LNG terminals, Offshore Pipelines & Topside modifications, offshore & onshore process Revamping projects, and Onshore Pipeline & refinery projects. Also includes Fabrication and inspection of pressure vessel, fired heaters, atmospheric vessels.

Current location:  Maharashtra, India - View on map
Nationality: Indian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: Bhasha Indoensia, english, Hindi, Oriya
Location I am interested in working: Anywhere

Qualifications

Mechanical Engineering (Diploma),

ASNT Level – II in RT, PT, MT, UT

ISO 9001: 2000 Lead Auditor course

CSWIP 3.1 Welding Inspector. Certificate Number: – 34022

Diploma in International Welding Technologist

Career Summary

I. Period : – SEP 2008 to Till date (India operation)
Employer: – Leighton India Contractors Pvt. Ltd (Leighton Group International Ltd, Australia)
Position: – QA/QC Sr. Manager / Project Co-coordinator

Projects Executed

A. Duration :- From Jun-12 to Till date
Position : – QA/QC, Sr Manager / Project Co-coordinator

Client : – Oil and Natural Gas Corporation Limited, India

Project : – Pipe Line Replacement Project – III, Additional Pipeline Project, and Heera Re- Development Pipeline Project – II.

• Project Value: Approx. USD 450 Million

• Project Location: ONGC’s Heera, Bassein, Neelam, and Mumbai High Oil fields

• Duration: 02 Years

• Project Brief – Scope includes laying and completion of 31 pipeline segments (appx. 200 Kms) of rigid and flexible pipeline segments and 59 topside modifications on EPC basis which includes: Project Management, Surveys, Design and Detailed Engineering, Procurement of Materials, Fabrication, Anti-corrosion (Internal & External), Weight coating & thermal insulation wherever applicable, Transportation & Installation of submarine pipeline, risers, and I/J tubes, topside modifications on existing facilities & supply of valves & Hook up, Testing, Pre-commissioning.

B. Duration :- From Sep 2012 to May ’13
Position: – QA/QC, Sr.Manager

Client: – Oil and Natural Gas Corporation Limited, India,

Project: – 3 Clamp on Project for Heera Field

• Project Value: USD 14 Million USD

• Project Location: ONGC Oil field Mumbai High North

• Project Duration: 14 Months

• Project Brief :- EPCI , Pre-engineering , pre-construction/pre-installation and design engineering, procurement, fabrication, installation of clamp-on structures on HJ, HZ & HG Well Platforms consisting of extension of Main Deck, Cellar Deck and Spider Deck, sub cellar Deck, clamps and conductor guides at all horizontal levels of existing jacket structures, vertical, sacrificial anodes for cathodic protection, conductor protector, Production related topside modifications in all three platforms.

C. Duration :- From Feb 2011 to September ’12
Position: – QA/QC, Manager

Client: Oil and Natural Gas Corporation Limited, India,

Project: WIN Revamp Project

• Project Value: USD 140 Million

• Project Location: ONGC Oil field Mumbai High North

• Project Duration: 14 Months

• Project Brief – EPCI of Revamping of entire existing facilities of the WIN platform. The scope included replacement of all process and utility equipment’s such as Lift Pumps, Injection Pumps, Booster Pumps, and Fine Filtration package, Switchgears, Piping, Electrical & Instrumentation and Structural works.

D. Duration :- From Sept 2008 to May-11
Position: – QA/QC Manager.

Client: – Oil and Natural Gas Corporation Limited, India

Project: – Pipeline Replacement Project-2 (PRP 2)

 

• Project Value: USD 714 Million

• Duration: 03 Years

• Project Brief – The scope of work included laying and completion of 44 pipeline segments (rigid and flexible pipelines, approx 234 Kms), which includes Project Management, Surveys (Pre-engineering, pre-construction/pre-installation and post-installation), Design, Engineering, Procurement, Fabrication, Anticorrosion & Weight coating wherever applicable, Load out, Tie down / Sea fastening, Tow-out/Sail-out, Transportation, Installation, Hook-up, Precommissioning, Commissioning and Testing, of pipelines in offshore, Mumbai, India on Turnkey basis.

Period : – FEB 2004 to August 2008 (Indonesia operation-Various projects)

Employer : – PT.Punj Lloyd Indonesia (Punj Lloyd group)

Position : – Sr. Manager / QC Coordinator (QA/QC)

 

Projects Executed

 

A. Duration : – From Feb 2007 to August 2008

Position : – Sr. Manager (QA/QC)

Client : – TOTAL E & P Indonesia

Project : – TUNU 11S / EPSC 5 South Utility Platform (SUP)

• Project Value: USD 46 Million (phase –II).

• Project Location: South Sumatera, Indonesia

• Duration: 01 Year

Project Brief – Engineering, Procurement, fabrication, installation and commissioning of total package consisting of a Main deck structural platform of 1350 ton and erection of the utility components such as Fire Water pumps, Emergency Diesel Generators with associate transformers, a technical building for interface, HVAC system, Waste Water treatment system, potable water system, Firefighting equipment, etc. with all piping and associated Instrumentation & Telecommunication. Load out of platform and installation on existing Jackets.

B. Duration : – From Feb 2006 to August 2007
Position : – Sr. Manager QA/QC

Client : – PT. Perusahaan Gas Negara (Persero) Tbk

PMC : – Penspen Petro Techindo

Project : – South Sumatera – West Java Gas Pipe line (Phase – I & II)

• Project Value: USD 46 Million (phase –II).

• Project Location: South Sumatera, Indonesia

• Duration: 01 Year

Project Brief: – Engineering, procurement, installation & commissioning of 32” & 28”onshore Pipe Lines of 272 kms. Which include cathodic protection, installation of pig launcher and receiving stations, section valves and sub-stations. The Pipeline includes Horizontal direction drilling, thrust boring, open cut boring & railway crossings. Installation of OFC cables along the same pipeline trench. Fabrications, installations of station piping.

Similar to Phase – II project, Phase I carried out as a sub-contractor of JFE.

C. Duration : – From Feb 2005 to August 2006
Position : – Manager QA/QC

Client : – TOTAL E & P Indonesia

Project : – Tambora 2 / EPSC2 EPC Project, Samarinda.

• Project Value : USD 52 Million

• Project Location: Tunu Field development located on the Kalimantan (Indonesia).

• Duration: 01 Years

Project Brief – Engineering, Procurement, fabrication , installation & Commissioning of Two (2) new GTSs 3 and 4, One (1) extension named GTS 2X of existing GTS 2, Four (4) Remote Wellhead Platforms connected to GTS 3 and 4, Four (4) Flow lines associated to the Remote Wellhead Platforms, One 24” export line starting from GTS 4 and arriving at STP3, and connected to GTS’s 3, 2 and 2x via 20’’ Jumper lines, modifications of existing Platforms GTS 1 and GTS 2 in order to upgrade the vent, drain and telemetry systems, tie-in works at GTS 1,

D. Duration : – From Feb 2004 to August 2005
Position : – Dy.Manager (QA/QC Co-coordinator)

Client : – TOTAL E & P Indonesia

Project :- Peciko 4 / EPSC 3- Medium Gas Pressure Compression Station, Senipah.

• Project Value : USD 52 Million

• Project Location: Peciko –IV, Senipah, Kalimantan, Indonesia

• Duration: 01 Years

Project Brief – Engineering, Procurement, fabrication, installation and commissioning of total package consisting of a Main deck structural platform of 1350 ton and erection of the utility components such as Fire Water pumps, Emergency Diesel Generators with associate transformers, a technical building for interface, HVAC system, Waste Water treatment system, potable water system, Firefighting equipment, etc. with all piping and associated Instrumentation & Telecommunication.

Period : – July 2002 to Jan 2004
Employer : – SAMSUNG ENGINEERING CO. LTD, KOREA

Projects Executed

Employer : – M/S SAMSUNG ENGINEERING CO. LTD, KOREA
Position : – Asst. Manager QA/QC (Mech)

Client : – Indian Oil Corporation limited.

Project : – Linear Alkyl Benzene project, Baroda.

TPI Agency :- DNV, TUV

EPC Contract for Detailed Engineering, Procurement, Supply, and Preparation, Construction, Material and Equipment Transportation and Installation, Pre-commissioning, Assistance for Commissioning for the following plant:

 Three nos. of Fired Heaters, stack.

 Utility Piping.

 Two Lacs Inch-Dia Piping fabrication and Hydrotesting.

 Oily Water Treatment Unit & facilities

OCT, 1999 to JUNE, 2002
Employer : – M/S NEWTON ENGINEERING AND CONST.CO.LTD (For Various Projects)
Position : – Sr.Engineer (QA/QC)

Projects : – WHITE OIL TRANSFER FOR GUJRAT REFINERY, IOCL

ZERO FLARING SYSTEM, GUJRAT, ONGC

INDMAX, GAUHATI REFINERY, GUAHATI, IOCL

STORAGE FACILITY, MUMBAI, BPCL

Client : – Indian Oil Corporation Limited, Oil and Gas Natural Gas corporation, Bharat Petroleum Corporation Limited

TPI Agency : – L & T Chiyoda, Engineers India LTD, UHDE India Ltd.

Engineering, Procurement and Construction of Cone roof, floating roof, cone cum floating roof tank, fire water network, pipeline, process piping, vessels, heat exchanger, LPG bullets, erection of package item like cooling tower, weigh bridge, compressor and Flare stack. Turnkey projects like supply Erection, Commissioning, Shutdown, Piping, Tanks, erection of static and rotary Equipment.

MAY, 1996 to SEP 1999
Employer : – M/S SHRINIVAS PLATES LIMITED, MUMBAI
Position : – Engineer QA/QC

Project : – Storage facility, Gujarat,

Client : – Gujarat Chemical Petrochemical Terminal Ltd, Indian Petroleum Chemical Ltd

PMC : – Engineers India Ltd.

Project Briefs:

Construction of Cone roof, floating roof, cone cum floating roof tank, fire water network, pipeline and process piping

 

 






popup-img