Highly qualified Architect, 14 years experience in construction, manufacturing, project management for civil and facilities installation works across residential and industrial projects.
Skilled in working and coordinating projects with multinational teams and specializes in management starting from design until commissioning of projects. Good knowledge of cost, design, planning, creating technical briefs and pricing schedules.

Current location:  İstanbul, Turkey - View on map
Nationality: Turkish
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: english, russian, Turkish
Location I am interested in working: Anywhere

Education/Qualifications

Eastern Mediterranean University
(Famagusta, Cyprus) Faculty of Architecture
B.A.
Feb-2004

Key Skills

Design Management

Architecture

3D Modelling

BIM

Clash Detection

Visualization

Quantity take off

Cost Management

Cost Estimation

Cash Flow Projection

Value engineering

BOQ preparation

Earned Value Analysis

Change Orders

Quantity Estimations

Creating .accdb databases

Project Management

Project Controls

4D Construction Progress

5D Construction Progress

WBS Structuring

Project Planning

Preparation of Construction Time Schedule

Proposals

Tender preparation

Preparation and Monitoring of Payment Certificates

Languages

English (Fluent)

Russian( Working knowledge)

Turkish (Native)

Career Summary

Design Manager / Mace International (Russia) Gutenborg Residential Project (2 billion USD)
2013-2014

Joining Mace in 2013, I accomplished Design Manager role for Structural and Architectural Packages of a huge residential project having 1.4 million m2 GCA in St. Petersburg. As Mace team, We have been awarded as delivery partner of our Client “SPbR” starting from resettlement of project land till commissioning of 46 plots.

*Due to current financial crisis on the Russian market, Gutenborg project has been suspended by SPbR.

Main Responsibilities / Achievements

• Management and control of drawings, Revit (BIM) models and correspondence between the project team and external parties (5 International Architectural Design teams.)

• Prior to State Expertise conclusion, Concept stage Design is completed for 46 land plots.

• Following the preparation of Design Brief, Contract negotiations were held and 5 Architectural Design Companies are awarded within the budget.

• Preparation of monthly progress payments and necessary supplementary agreements.

• Co-ordination and control of the RFI process.

• Co-ordination of the Designers in the development of architectural and engineering work packages in accordance with the Client’s standards.

Cost Manager / Ventech Construction & Installation Co. (Iraq-Turkey) TTOPCO CPF Central Processing Facilities
(120 million USD)
2012-2013

I was offered by Ventech Construction & Installation Co. (Çukurova Group Turkey and Ventech Engineers Houston). The Project is the Installation, Construction, Commissioning and Testing for the Development of the Phase II of the Taq Taq Central Processing Facilities in Northern Iraq. I was working in Ankara Headquarters.

Main Responsibilities / Achievements

• Develop a systematic plan for the tender preparation and execution of the contracts that includes the elements of budgeting, scheduling, accounting, material management, and reporting for a particular project.

• Enable the incorporation of Earned Value Analysis, i.e. the measurement of achievements and accrued costs (performance) against baseline plans.

• Forecast the results of the corrective action via performance measurement report.

Technical Manager – Cost Manager / Palmira Group (Russia) Megalogix Logistic Complex, OOO “Logopark”–
2008-2009 (125M USD)
Headquarters – 2009-2012

Following the Technical Manager role on Megalogix Logistic Park Project in Novosibirsk, I was promoted to Lead Cost Manager in Moscow Headquarters.

Main Responsibilities / Achievements

• Prepared cost estimates & Quantity take offs for 67 different projects and helped securing 3

• Planning and Progress Reporting, Cost Control

• Monthly Progress Payments, Cash Flows, Development of the work execution schedules in compliance with the Contract Milestones; works progress tracking; making of regular weekly and monthly reports on the works progress.

• Material Quantities Take-off from Tender Design and preparation of BOQ

• Preparation of 4D visualization and Renderings of Construction Phases.

Technical Manager / Ant Yapi (Russia) Kaleidoscope Shopping Center, ZAO KomEstate (115 million USD)
2007-2008

Hired as Technical manager being responsible for all design documentation, cost control and work execution schedules for the 119K sq.m. Kaleidescope Shopping & Entertainment Centre Project in accordance with the client’s needs.

Main Responsibilities / Achievements

• Ensuring that the brief is scoped correctly to enable appropriate procurement of consultants and implementing Design Reviews and facilitating the Value Engineering.

• Development and tracking Work Execution Schedule & prep. of weekly, monthly reports

Architect – Schedule Manager / Urban Construction (Russia) EPC-4 Project “Olympia Residential Community” for Exxon Neftegas Limited Co. (ENL) (65 million USD)
2005-2007

Main Responsibilities / Achievements

• Development of designs and solutions on the basis of Tender Drawings for the Project needs, adaptation of drawings in accordance with the Russian Norms & regulations.

• Development of Work Execution Schedules in compliance with the Contract Milestones; tracking and making regular weekly and monthly reporting on the works progress status (including manpower histograms, actual vs. planned scope of production; S-curves on procurement, engineering and construction activities; Preparation of Three-Weeks Look Ahead and Three-Months Look Ahead Design and Work Schedules.

Manager (Family Bussiness) / Oda Construction (Turkey)
2000-2004

Main Responsibilities / Achievements

• Modular Formwork Design, Manufacturing and Applications. Design of Formwork systems with scaffolding and accessories in CAD environment. Quotation preparation, design development, application and supervision of formwork systems

 