Nigeria Based Mechanical Engineer

Unavailable
Serial No: 13585
Skills keywords: design engineer

Short Bio:

I am a hardworking and diligent individual looking for my next career move” “Experienced Autodesk Inventor

Current location:  Lagos, Nigeria - View on map
Nationality: Nigerian
Preferred Sector of Employment:  accounting and finance, Oil, Gas and Energy
Spoken languages: english
Location I am interested in working: Anywhere

Education And Qualifications
B Eng. In Mechanical Engineering
University of Port-harcourt, River State-In View

Higher National Diploma (HND) in Mechanical Engineering with option in Power/Plant Engineering Technology
Petroleum Training Institute, Warri, Delta State. Nigeria [Lower Credit] – August, 2003.

National Diploma (ND) in Mechanical Engineering
Petroleum Training Institute, Warri, Delta State. Nigeria [Upper Credit] – April, 2001

Experience
Autodesk Inventor 3D Designer  (Aug, 2013 – TO DATE)
National Oil Varco APL (NOV) / Crestech Engineering Ltd
Project Handled: EGINA OLT/BLT – Bouy Turret Loading
Project: EGINA OLT/BLT – Bouy Turret Loading
Client: Total E&P Nig., Ltd

Project Outline : EGINA is a deep offshore oil and gas project in Nigeria, Located 150km from the coast. Development in 1500 m water. Depth includes a moored FPSO, an offloading cambuoy, Production loops and injection lines. Gas is exported via Pipeline.
Responsibilities:
• Design and modeling of Cambouy structural parts
• Ability to independently make a technical setup of drawings (concept to detail and method statements)
• Elaborating sketches and ideas into drawings.
• Developing drawings into detail design
• Document handling in compliance with internal standards and systems
• Quality and timely delivery of drawings
• Collaboration with other project members
• Reporting results to Lead/Senior Designer and Project Engineer
• Ensure that drawings take full regards of all health and safety requirements.

PDMS Designer (June, 2012 – Aug, 2013)
Crestech Engineering Ltd-Technip Nigeria
Project: Ehra North Phase 2 (ENP2) project (FPSO Topside modifications)
Client: Esso Exploration and Production Nigeria Limited / Globestar
Responsibilities:
• Equipment Location Drawing,
• Extraction of Piping Isometric Drawing
• PDMS 3D Model Drawing
• Extraction of Equipments using PDMS Draf.
• Clash checking and resolution using QUANTACAD.
• Creation and Modification of Support on Pipes, Cable Tray and other

Piping Designer (Dec., 2011 – June., 2012)
Crestech Engineering Ltd-Technip Nigeria
Project: Ofon Phase II EPCC 2 Project
Client: Total E&P Nig., Ltd
Project Outline : Detail Design for Installation of two wellhead platforms (OFD3 &OFD5) and two access bridges (OFP1-OFP2 & OFQ-OFP2).
Responsibilities:
• Plot Plan Drawing,
• Preparation Piping General Arrangement (plan and elevation).
• PDS 3D Model Drawing
• Preparation of Tie-in list.
• Preparation Piping MTO and Specialty item list.

PDMS Designer (2009 – 2011)
Amazon Energy Engineering Ltd, Lagos
Project: Iyak “SE” Slot Add.Project (Post-IFC Modification)
Client: Mobil Producing Nigeria
Project Outline : The Scope of the Post-IFC effort involves modification of the existing Iyak SE Slot Addition IFC Package to align with the design and modification of EPC4B project on Iyak SE Wellhead Platform.
Responsibilities:
• 3D Model Review,
• Preparation of Emergency Escape Route Drawing
• Preparation of Safety Equipment Arrangement on the Cellar Deck.
• Preparation of Equipment Arrangent on Cellar Deck.
• Preparation of Gaslift Piping MTO.
• Generation of Piping Isometrics Drawings from the Model.
• Preparation of Valve Data Sheet and Tie-in list
• Review Piping documents and drawings.
• Monitor progress work in designated area
• Attending design review /Bi-weekly meetings

Piping / Pipeline Engineer
Project: Utorogu-Ughelli East Domgas Pipeline Project
Client: SPDC / Daewoo Nigeria
Project Outline : The Scope of Work comprises Engineering, Procurement, Construction And Commissioning of a new bulkline ( 12” x 12.5 km) and testline ( 8” x 12.5 km) for Ughelli East- Utorogu Pipeline System project (including all associated tie-in and manifold works). It also includes replacement of flow lines (6” x 5 km) and corrosion inhibition lines

Piping Engineer
Project: Utonana Facilities Upgrade Project
Client: Chevron Nigeria Ltd
Project Outline : The Scope Identified in the Utonana Facilities Upgrade Consists of the following: (1) Design of New Fire Water System and Support Platform. (2). Demolition Scope of the damaged Production (Bulk) Separator and Test Separator Vessels (MBD-200 and MBD-202). (3). The Installation of a Multi-Phase Flow Meter (MPFM) for well testing. (4). Bridge between Fire Water Platform and Utility Platform. (5). Boat Landing Platform.

Piping Engineer
Project: Iyak “SE” External Well Development Project
Client: Mobil Producing Nigeria
Project Outline : Detailed engineering of platform extension including structural extension, addition of production, test and gas manifolds, flow lines, gas lift and injection lines, flow lines and drain lines and tie-in to existing facilities.

Piping/Mechanical Engineer
Project: Brownfield Verification for Satellite Fields Development Phase 2 Project.
Client: Mobil Producing Nigeria
Project Outline: The primary purpose of the project is to conduct verifications that will allow the tie-in of risers and installation of receivers and launchers on Production and Riser platforms that will receive production from or deliver high pressure gas to future wellhead platforms.

 

 

 

 

 

 






popup-img