Electrical Engineer with natural resource exposure

Available
Serial No: 4889
Skills keywords: instrumet tubeing instalation
Current location:  Tunapuna/Piarco Regional Corporation, Trinidad and Tobago - View on map
Preferred Sector of Employment:  accounting and finance

C and J Adams Specialist Services LTD. 1998 – 2000

Electrician: Domestic Electrical Installation


Kentz OJ Electrical and Instrumentation Contractors 2001 – 2002

Electrician: Atlantic LNG Gas Plant, Trains 2 and 3.

  • Installation of cable trays and cables
  • Installation and upgrade of control room and junction boxes
Ansa Technologies Electrical and Instrumentation Contractors. 2002 – 2004

Carib Glass Works Ltd (furnace Rebuild)

Electrician: Installation and termination of cables in junction boxes. Installation of thermocouples to furnace. Rewire motor connection on bottling line.

Trinidad and Tobago Methanol Company Plant 1 shutdown (TTCM 1)

Electrician: Replace and terminate thermocouples on Reactor.

Nitrogen 2000 Ammonia Plant


Instrument Technician / Instrument Fitter: Calibration of pneumatic valves, gauges, transmitters, level gauges and thermocouples. Connect tubing supply to all pneumatic valves, transmitters and test stations. Installation of all instruments.

MMR Constructors inc. 2004


BHP Billinton (Angostura field offshore control platform)

Journeyman Electrician: Calibration of pneumatic valves, gauges, transmitters, level gauges and thermocouples. Connect tubing supply to all pneumatic valves, transmitters and test stations. Installation of all instruments, fusible loops, inferred detectors and cameras.

Neighbors 657 Drilling rig (Angostura field Kari 1,2 and Canteen 1 offshore well stations)

Journeyman Electrician: Connection of tubing to well head master valve, wing valve and down hole valve to hydraulic control panels. Installation of all instruments, fusible loops, inferred detectors and cameras.

Mersk Drilling Venezuela S.A. 2005.

Journeyman Electrician: Repair motors change bearings, change switchgears. Calibrate and replace instrument, replace tubing and Loup check.


Isertech (Caribbean) LTD. 2005-2007

 (Methanex complex)

E & I Technician: Repair motors change bearings, change switchgears. Calibrate and replace instrument, replace tubing, analyzer checks, DCS checks and Loup checks. Calibrate valve positioners.

(Methanol 4)

E & I Technician: Remove, repair, replace and set RTD’s, trust probes, speed    pickups, temperature indicators and pressure switches on SYN gas, natural gas and co2 compressors.

(Atlantic LNG)


E & I Technician: Calibrate SPAs and install on trains 1,2and 3control room. Calibrate and install transmitters on trains 1,2and 3.

(Atlantic LNG)

Lead E & I Technician: Calibrate, install, terminate and loop check transmitters motors and valves on trains 1. For new propane scrubber pumps and flow meter skid. Install loop check and calibrate gas detectors, heat detectors and open path detectors on trains 2 compressor deck

(BPTT Cannonball offshore commissioning)

Lead E & I Technician: check all emergency shutdown systems, fire and gas detection systems. Calibrate and loop checks all instruments. Check hydraulic control panel. Check wellhead controls, wing valve and master valve operations.


(ISS Superior energy services Point Lisas)

Lead E & I Technician: Repair, calibrate and change gas, smoke and   heat detection devices in mobile work station to be sent offshore.   


Lennox petroleum services limited 2007 - 2008

(Transocean Sovereing Explorer semi sub rig)

Electrician: instillation, repair and preventative maintenance of motors,

switchgears, solenoids,  SCR’s, generators, top drive, MUX cable system,

galley equipment, air-conditioning system, chiller and  general lighting on rig.

CB&I Lummus 2009-

(Petrotrin FCCU phase II upgrade)

E& I General Foreman: Supervise contractor and direct hire employees, to ensure work is being preformed to customer standards and company best work practices. Create schedule for work to be done and record progress and steps taken. Organize manpower loading, cost code, material takeoff, equipment, tools and material purchase. Highlighted drawing that need to be redlined by engineering to match the best location and installation of conduit, instruments and electrical equipment. Arranged and chaired meeting with client to discuss location of equipment, schedule for equipment location, power up of equipment and demo and or modification of existing equipment. Assist with planning of shutdown and arranging systems turnovers.
D.Rampersad Company Ltd 2011-2012(ArcelorMittal steel plant PointLisas Trinidad)


Electrical Supervisor: Supervise a team of electricians as we move between different facilities within the estate repairing and upgrading equipment .Work in DR units, melt shop, Rolling mill and port. Provide manpower loading schedules, help improve maintenance techniques and provide construction advice for installation of new electrical equipment.