CV, Highly Experienced Electrical Data Centre Construction Supervisor

I am currently available for work
Serial No: 20647

Skills keywords: construction supervisor, electrical foreman, senior site supervisor, supervision
Short Bio:

Experienced and dedicated professional electrician with many years of working within the domestic, commercial and industrial sectors. Working as a commissioning and qualified test and inspection electrician has taught me the need to work to a set process and the highest standards ensuring compliance with the current regulations, this will ensure that the documentation is completed right first time.

Current location: England, United Kingdom - View on map
Nationality: English
Spoken languages: english
Location I am interested in working: Anywhere

Professional Qualifications

• City and Guilds 2391 – Test and Inspection

• City and Guilds 2381 – 17th Edition BS7671:2008 Wiring Regulations

• City and Guilds 2330 level 2 & 3 – Electrical Installation

• IPAF – 3a & 3b (Mobile Scissor Lift and Mobile Boom)

• Nebbs Management Certificate

• SMSTS (Site Managers Safety Training Scheme)

• Paxton Door Access Control Installers Course (Paxton Registered Installer)

Professional Training

• Fully conversant with Microsoft office 2013 including Visio and Project

• Working Knowledge of Auto-Cad

Profile

Experienced and dedicated professional electrician with many years of working within the domestic, commercial and industrial sectors. Working as a commissioning and qualified test and inspection electrical has taught me the need to work to a set process and the highest standards ensuring compliance with the current regulations, this will ensure that the documentation is completed right first time.

Working within the family business has meant I have taken on many different roles and tasks including man managing 50+ non – English employees, this has necessitated having a flexible approach to ‘getting the job done’ on time and to budget

Career Summary

Senior Site Supervisor – Electrical – Uphill Engineering Ltd,
(July 2014 – present)

Current Contract for Workspace Technology Ltd & Trilec Communications Services Ltd.

The duties included

• Supervision of 45 employees and sub-contractors for all M & E installations.

• Large Industrial Generator Projects

• Data centre power and data cable installation & pro-active and re-active maintenance

• Door Access Control Installation

• Commissioning and testing of installations

• Production of all documents including OEM’s, Health and Safety Documents and Risk Assessments

• Periodic Inspection and Testing of Fixed wire installations including DATA Centres

Electrical Supervisor – Uphill Engineering Ltd,
(June 2008 – July 2014)

Major Contract for Workspace Technology Ltd.

The duties included

• Supervision of 45 employees and sub-contractors

• Large Industrial Generator Projects

• Diesel rotating uninterruptable power supply (DRUPS) installation

• Cable Containment including ladder rack, cable tray, trunking and conduit installation

• Data centre power and data cable installation

• Commissioning and testing of installations

• Periodic Inspection and Testing of Fixed wire installations

• Complete home and office rewires

• Commercial Business renovation

• Fault finding and Rectification

• Preventative and reactive maintenance work

• Repair work

• Call out and Emergency Repairs

Electrical Contractor – Uphill Engineering Ltd,
(Nov 2006 – June 2008)

The duties included

• Complete home rewires

• Commercial Business renovation

• Fault finding

• Preventative and reactive maintenance work

• Repair work

Electrical Contractor – Self-employed within family business
(Jan 2002 – Nov 2006)

• Employed within family business, ensuring that all contracts were completed on time and to Budget

The jobs included

• Home and office renovation

• 6 month contract to London Underground (Metronet) – managing 50 non-English staff

• Reactive Maintenance work

• Restaurant renovation