CV, Experienced Pakistan based Project Manager. Oil and Gas

Available
Serial No: 16856
Skills keywords: mechanical engineer, pipeline engineer, project engineer, project manager
Current location:  Sindh, Pakistan - View on map
Nationality: Pakistani
Spoken languages: english

Qualifications

4 Years Bachelor of Engineering (B.E) in Mechanical Discipline
Completed from N.E.D. University of Karachi, Pakistan in 1998.

Career Summary

Pipelines and wellhead Facilities Projects: 8 Years

Gas processing Plants, LPG Plants and Refineries Projects: 8 Years

 

Current Project: UCH-II Development Project: USD 200 million
(September 2011 to date)
Project Status: Engineering & Procurement 100% and Installation/Erection/Construction 40% Completed

Working as a Project Manager. Project involves the Detailed engineering and Procurement of 15 wellhead facilities, flow lines of total lengths 130 KM and 300 MMSCFD gas processing plant including H2S removal plant, dehydration plants and offsites & utilities. Responsibilities include coordination with client, Packagers and team of various in house discipline engineers. The following activities involve in the project.

• Preparation of various tender documents including Amine Sweetening Units, Dehydration units, Power Generation & WHRU, metering package, line pipes, instrument & nitrogen generation package, hot oil package, oily water separator package etc.

• Bid evaluation of the packages, equipments / materials which include technical and commercial evaluations.

• Preparation of contract documents between OGDCL and Suppliers

• Review of vendors design

• Participation in Design review meetings, HAZOP and FATs

• Ensured execution compliance with the Schedules and contractual obligations and constrains.

• Tracking Procurements of Packages/ equipments and materials

• Participation in Progress review meetings

• Detailed Engineering design of storage tanks, piping, pipelines, wellhead facilities, civil engineering, E&I detailed engineering works

• Construction Supervision during erection / installation of plant and pipelines

• Assistance in commissioning and start up

Overseas Participations

• Participated and present Country Paper of Pakistan in Workshop on Innovation & Sustainable Strategies for the Growth in Process Industry, Organized by Asian Productivity Organization (APO) in Singapore, October 21-24, 2008.

• Two visits of UK for HAZOP study and design Review of Power Gen Sets and WHRU with Siemens UK for UCH II Development Project.

• One month deputation to ATG Sharjah office for finalization of overseas design assignments.

• Six visits of Dubai for Design review meetings and HAZOP studies for Amine and Dehydration packages with the suppliers for UCH II Development Project.

• One visit of China for witness of Hydrotesting of Heat Exchangers for Condensate Refinery Project.

• Developed project schedule, performance Curves, and arranged human resources.

• Liaised with client, embedded his concerns and updated the schedule in line with the new developments and revised scope of works.

• Ensured execution compliance with the Schedules and contractual obligations and constrains.

• Review of P&ID’s and Participation in HAZOP meeting.

• Updation in plot plans, general arrangement drawings, equipment and piping layout plans, piping isometrics etc.

• Development of Pipeline alignment drawings, crossings & typical drawings.

• Prepare piping material specifications and piping material requisitions.

• Pipelines elastic bending, upheaval buckling calculations etc.

OMV Latif 1 & 2 Flow lines and Compression Project
(Dec. 2010 to May 2011)

Worked as a Project Manager. Project involves Detailed engineering of compressor installation and flow lines design. Detailed engineering design works was involved for pipeline and compressor station as per OMV’s standard. The following activities have been carried out during the project.

• Developed project schedule, performance Curves, and arranged human resources.

• Ensured execution compliance with the Schedules and contractual obligations and constrains.

• Review of P&ID’s and Participation in HAZOP meeting.

• Development of plot plans, general arrangement drawings, equipment and piping layout plans, piping isometrics etc.

• Development of Pipeline alignment drawings, crossings & typical drawings.

• Prepare piping material specifications and piping material requisitions.

• Pipelines elastic bending, upheaval buckling calculations etc.

Inspection and Design vetting of LPG Plants for Oil & Gas Regulatory Authority.
(October 2007 to November 2010)

Worked as a Project Manager. Project involves the design vetting of the LPG bottling plants and Inspection of LPG processing/bottling plants and LPG terminals as per relevant Codes/ standards and compilation of report. The following activities have been carried out during the project.

• Development of Checklist for LPG Processing plants as per API 2510 and for Storages Plant as per NFPA 58 with other international codes & standards.

• Physical Inspection of Plants.

• Review of documents and data collected during inspection

• Compilation of Inspection Report

• Re-inspection (if required)

Basic & Detailed Design of BPL’s Regeneration facilities Project.
(June 2007 to September 2007)

Worked as a Project Manager. Responsibilities included the coordination with client and team of various discipline engineers to carry out the Basic & Detail engineering of the project. Project involves the provision of regeneration facilities for NHT & Platformer units of Byco Pakistan Limited. The following activities have been carried out during the project.

• Review of P&ID’s.

• Site visits for collection of data

• Development of As-built Drawings

• Updation in plot plans, general arrangement drawings, equipment and piping layout plans, piping isometrics etc.

Basic & Detailed Design of BPL’s Flare Revamp Project
(January 2007 to May 2007)

Worked as a Project Manager. Responsibilities included the coordination with client and team of various discipline engineers to carry out the Basic & Detail engineering of the project. Project involves the provision of new PSVs and revamp of Flare system of Byco Pakistan Limited. The following activities have been carried out during the project.

• Review of P&ID’s.

• Site visits for collection of data

• Development of As-built Drawings

• Updation in general arrangement drawings, equipment and piping layout plans, piping isometrics etc.

Basic and Detailed Design of OGDCL’s Bahu Development Project.
(June 2006 to December 2006)

Worked as a Project Manager. Responsibilities included the coordination with client and team of various discipline engineers to carry out the Basic & Detail engineering of the project. Project involved 04 wellhead facilities, flow lines and receiving facility at processing plant. The following activities have been carried out during the project.

• Review of P&ID’s and Participation in HAZOP meeting.

• Development of plot plans, general arrangement drawings, equipment and piping layout plans, piping isometrics etc.

• Development of Pipeline alignment drawings, crossings & typical drawings.

• Prepare piping material specifications and piping material requisitions.

• Pipelines elastic bending, upheaval buckling calculations etc.

Front End Engineering Design of OGDCL’s UCH-II Gas Development Project.
(September 2005 to May 2006)

Worked as a Lead Mechanical Engineer. Responsibilities included to carry out the front end engineering design of the project. Project involved the Front End engineering design of 15 wellhead facilities, flow lines from wellheads to process plant and gas processing plant. The following activities have been carried out during the project.

• Review of PFDs and P&ID’s and Participation in HAZOP meeting.

• Development of plot plan.

• Development of Specifications and data sheets.

• Prepare piping material specifications and piping material requisitions.

• Pipelines elastic bending, upheaval buckling calculations etc.

Detailed Engineering and Procurement of PAPCO’s White Oil Pipeline Project: USD 340 million
(January 2001 to August 2005)

Worked as a Lead Pipeline Engineer. Project involved 780 Km cross country pipeline of dia 26 inch, including one storage and pumping station, three intermediate pumping stations and one terminal station, overhead crossings etc. Responsibilities include the coordination with client, Packagers and team of various discipline engineers. The following activities involve in the project.

• Review of PFDs and P&ID’s and Participation in HAZOP meeting.

• Site visits for collection of data

• Perform surge analysis & telescoping of pipelines on Paula Plus Software

• Pipelines elastic bending, upheaval buckling, column separation, max. unsupported length, buoyancy, anchor flange and pipeline thickness under road and railway crossings calculations etc.

• Development of Specifications and data sheets.

• Development of Pipeline alignment drawings, crossings & typical drawings.

• Stress analysis of overhead crossings

• Preparation of various tenders documents including line pipe, pumps, terminal piping etc.

• Technical Bid evaluation.

• Review of vendors design

• Detailed Engineering design of piping and pipeline

• Modification in the design as per site requirements.

Front End Engineering Design of ARL’s Taru Jabba Pipeline Project.
(April 2000 to December 2000)

Worked as a Pipeline Engineer. Project involved 180 Km multi products pipeline of dia 12 inch, including one storage and pumping station and one terminal station, overhead crossings etc. The following activities involve in the project.

• Perform surge analysis & telescoping of pipelines on Paula Plus Software

• Development of Pipeline alignment drawings, crossings & typical drawings

• Cost estimation of the project.

Basic & Detailed Engineering Design of Condensate Processing Facility Project
(June 1998 to March 2000)

Worked as a Mechanical Engineer. The following activities involve in the project.

• Development of plot plans, general arrangement drawings,

• Mechanical Calculation for Pressure Vessels and TEMA Heat Exchangers.

• Thermal Calculations for Furnaces and Heat Exchangers

• Prepare piping material specifications and piping material requisitions.

• Prepared Technical Specifications and data sheets for Pressure Vessels, Furnaces and Heat Exchangers.

 

 