CV, Egyptian QA and QC Site Manager Oil and Gas seeks new position

Available
Serial No: 17608
Skills keywords: effective interpersonal skills, excellent auditing skills, excellent planning, move deftly

Short Bio:

QA/QC Site Manager with experience of successfully coordinating the activities of multidiscipline inspectors concerned with project quality management from EPC stage through to commissioning in oil and gas field and petrochemical industries.
Project extensive knowledge of fabrication/installation of onshore and offshore facilities.
Extensive knowledge of fabrication/installation of tank farms, pressure vessels/columns, boilers, heaters, structures, piping material Ferrous and non-Ferrous.

Current location:  Doha, Qatar - View on map
Nationality: Egyptian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: Arabic, english
Location I am interested in working: Anywhere

HISTORY OF EMPLOYMENT:

From December 01 Dec 2013 To present.

DNV GL

Position: QA/QC Site Manager.

Project: EGC (Export Gas Compression) Facility upgrade Project, and TPGIF (Third Party Gas Interconnection Facility) project – Dolphin energy LTD- Ras Laffan, Qatar.

3 Export Gas Compression and related facilities (1 BSCFD Sales Gas).

From June 15, 2012 To 30 Nov 13.

DNV GL,

Position: QA/QC Site Manager.

Project: Musandam Gas Plant project.

Include Gas facility plant (3 oil storage tanks (52000mm DIA*21000mm height), gas sweetening and dehydration unites, Sulfur recovery unit, fire fighting and utilities), 2 Sea water intake pipeline, water outfall pipeline, single point mooring and its related export crude oil pipeline and pipeline end manifold (PLEM) with risers.

From Jan.15, 2011 To June 13, 2012.

Technip – France

Position : QA/QC Site Manager.

• Owner : Burullus Gas Company share holder with British Gas .

• Project: Burullus Phase VIIIa , WDDM project (SubSea) – Alexandria – EGYPT.

• Position : QA/QC Site Manager

Fabrication of the following subsea structures:

(3 Manifolds, 3 Sub Sea Distribution Assemblies (SDA’s), 21 Pipe Line End Termination (PLET’s),

21 Jumper, 13 Goose Neck, and related piping and foundations (suction piles)).

From May 06, 2010To Jan.13, 2011.

ACERGY SHIPPING Ltd.

Position : Deputy Fabrication MGR & QA/QC Site MGR.

• Owner : British Petroleum .

• Main Contractor :ACERGY Shipping Limited.

• Project: Taurt phase II and Haápy field Extension – Alexandria

• Position : Deputy Fabrication MGR & QA/QC MGR.

Fabricate and construct the following:

5Tie-In Spools, and installation of 3 Manifolds, 3, Subsea distribution unit, 5 swan Neck, and its foundations.

From Oct. 25, 2008 To May 06, 2010

IEMSA IMPIANTI INTERNATIONAL Co.

Position : QA/QC Manager

• Owner : E-MEHANEX .

• Main Contractor : Techint Cimi Montubi (TCM).

• Project: Methanol Project – Damietta

• Position : QA/QC Manger for IEMSA IMPIANTI Co (Sub Contractor).

Fabricate and construct two power boilers, reformer, and water treatment unit…

All welding and erection activities related to piping with special materials as follow:

A335 P91, A335 P22, A335 P11, A790 S 31803 (DUPLEX), A691 1.25 Cr CL22, ST.ST. A312 TP 304L,TP 304H, TP 316L, B167 N 06600 (INCONEL), ASME B 407 UNS 810 (Incoloy).

From NOV. 10, 2006 To Oct. 20, 2008.

Position : QA/QC Team Leader.

• Owner : British Petroleum.

• Position : Represent BP through Egyptian Maintenance co. as Senior QA/QC Engineer.

• Project: SAQQARA Project

New Onshore Reception Facilities and its related works:

• Process piping (CS, ST.ST., Duplex, Super Duplex, HDPE, …… )

• 16” onshore pipeline.

• Fire water fixed roof tank ( 22000 mm ID *9000 mm Height ) .

• Underground piping (CS, and high density polyethylene (HDPE)).

• Main Contractor : Petroleum Projects And Technical Consultation Co. ( Petrojet) .

From FEB. 18, 2005 To NOV., 2006

GERMANISCHER LLOYD, DOHA, QATAR.

• Client : Qatar Petrochemical co. ltd. ‘’ Qapco’’ -Qatar.

• Position : Represent QAPCO through Germanischer Lloyd (GL) as Senior welding inspector.

• Project: Qapco Ethylene Plant Expansion Project

• Piping works in prefab workshops (CS, ST.ST., low alloy steel, Cement lined pipes, ….)

• Cracking Furnace and its related woks( steel structure, piping, ..)

• 12” onshore pipe line from NGL4 to PE plant

• Of Spec. Gasoline above ground floating roof tank (17400 mm ID *12200mm Height ) .

• Main Contractor :JGC middle East FZE

• Sub-Contractor : C.C.C.

FROM SEP. 1997 TO FEB. 2005

” Petrojet ” “ The Petroleum Project And Technical consultation co. ,

Position : Senior QA/QC Engineer.

1. Northern Branch – Alex. ( Onshore )

The basic activity is :

Construction Of Petrochemical Projects, Oil & Gas Industries, and Refineries

2. The General Marine Department

The basic activity is:

• Fabricate & building offshore platforms – this building including :

structure parts ( jacket – decks -Piles – modules – skids – boat landing – vent boom – bumpers , & top side facility : equipment , piping ( T.S.F. ).

• Offshore Platforms Installation And All Related Activities.

• Offshore Pipe Line Laying.

3. Maadia Fabrication Yard – Alex. (Onshore )

The basic activity is :

Fabricate & building well head platforms onshore – this building including : structure parts ( jacket – decks -Piles – modules – skids – boat landing – vent boom – bumpers , & top side facility : equipment , piping ( T.S.F. )

• Vessel PJ-17 (Offshore derrick barge)

The basic activity is :

– Inspection of operating platforms ( infra structure, heli-deck, main structure, risers, boat land , jacket, equipments, skids, and top side facility ) .

Performing the required repairs and replacing any structure according to the final inspection report.

– pipe line repair and all related works like pipe line supports and diving works.

• Vessel PJ-12 derrick and laying barge (Offshore pipe laying barge)

The basic activity is :

pipe line laying and all related works , installing platforms and all related works ( jacket – decks – Piles – modules – skids – boat landing – bumpers , and top side facility : equipment , piping ( T.S.F. )

– pipe line repair and all related works like pipe line supports and diving works.

From JULY, 2003 to FEB., 2005

 VESSEL PJ-12 (Offshore Laying Barge)

 Project: 20″ Pipe Line From Rosetta P-1 Platform To Rosetta P-2 Platform and Jacket And Deck Installation And Its Related Works.

 Project: Simian/Sienna & Sapphire Development Project

o ( 2 ) pipe lines 4” and one 10” Pipe Line Piggy Back Pipe laying.

o ( Jacket And Deck Installation And Its Related Works )

 Project:

14″ Pipe Line From Akhen P/F To Temsah Gas Plem

 Project:

6″ Pipe Line From Akhen Temsah To Condensate Plem

 Project:

PF-A Monopode Installation And Its Related Works

 Project: Barbouni and Temsah Concession area.

( 26″pipe line Laying from Barbouni P/F to Noras-A Plem )

 Project: Barbouni and Temsah Concession area

( 24″pipe line Laying from Temsah–4 platform to Temsah N/W

platform )

 Project: Sinai Field Development

No.off ( 8 ) pipe lines 8“ and (4) pipe lines 6 “

From June, 1999 To July, 2003

 VESSEL PJ-17 (OFFSHORE)

 Project: Sinai Field Development of 12 platforms

( Inspection Of Operating Platforms , Repair Of Risers,

pipelines, Replacing Heli Decks And Infra Structure And installing Deck .

Extension, And Its All Related Works)

 Project: AAMER-7 Platform

( Inspection of Operating Platform, Repair Of Risers , and

Replacing Infra Structure ) .

 Project: NORAS-A Platform

Inspection Of Operating Platforms , Repair Of Risers ,

And Infra Structure And Installing Deck Extension, and

its Related Works

 Project: Morgan-36 Platform

Inspection Of Operating Platforms , Repair Of Risers , Replacing

Heli Decks And Infra Structure And Replacing Glycole Unit and

Installing Deck Extension, and its Related Works

 Project: MWP-1 Platform

Inspection Of Operating Platforms , Repair Of Risers , Replacing

Heli Decks And Infra Structure And Installing Deck Extension, and

its Related piping Works

 Project: Pipe Line Repair

18” pipe line from PP-3 platform to Petrico

 Project: FF &GG Platforms

(Boat Land Repair, Barge Bumpers Installation, And Deck

Extension And Its Related Works ) .

 Project: MPA Platform – Elashrafy Field

(Flare Repair, Repair Of Risers , Replacing Heli Decks, And

Deck Extension And Its Related Works ) .

 Project: Gupco Platforms ( Fields : October ,July, Morgan,

Ramadan, Sedki , Helal )

(Flare Repair, Repair Of Risers , Replacing Heli Decks, Boat Land

Repair, Barge Bumpers Installation And Deck Extension And Its

Related Works ) .

From NOV., 1998 To JUNE, 1999

 MAADIA FABRICATION YARD – ALEX. (ONSHORE )

 Project: Rosetta P-1 Platform

Fabrication of ( Jacket, piles, Boat land, Decks, TSF and all related structure )

From SEP., 1997 To NOV., 1998

 Project: Aameria Petrochemical Plant

GASCO Project ( Two Fire Water Tanks And its Related

Work , Seven LPG. Spherical tanks, and its related work,…………. )

Academic Records

B.Sc. Mechanical Engineering University of Assiut, 1996.

 






popup-img