CV, Construction Manager seeking work in middle east

Available
Serial No: 41534
Skills keywords: pipelines construction, pipelines, piping manager, hydrotesting, mechanical engineer
Current location:  Kuwait - View on map
Nationality: indian
Spoken languages: english, italian

Professional Skills:

Conversant with all Piping (Under & Above Ground) activities such as Planning, Fabrication, Installation, Testing and Line Checking activities.

Efficient to  plan effectively based on work front and material availability.

Skilled in reading Drawings, ITP, Procedures, Codes and Standards including marking of As-built.

Experienced in Oil & Gas Plant construction.

Experienced in hydro testing, Hot Tapping’s, Tie-in with live lines, cleaning and gauging of pipelines in oil and gas industries.

Able to mark the hydro test boundaries in the drawing and prepare / review the dossier.

Knowledge in progressive and systematic acceptance and retention of piping records to enable project turnover.

Familiar with international codes and standards like ASME, ASTM, API etc.

Have leadership qualities, and able to manage the contractors for carrying out the work.

Working knowledge with computers and good communication skills.

Effective participation in implementing project HSE&Q objectives.

Review drawings, Specifications, Procedures, WPS, ITP’s.

Well versed with use of Construction Integrated Management System and computer for office use and feeding inspection data.

Familiar with software packages like windows, MS Word, EXCEL

.

 

 

Special Jobs Attended:

  • Hot Tapping of live lines.
  • Tie-in work of project pipelines with live pipelines for gas-in.
  • Nitrogen filling and mothballing of entire plant.
  • Caliper pigging.
  • Hydrotest, gauging, drying, nitrogen mothballing of pipelines range from 36 inch to 3 inch.
  • Blasting and painting/coating of damaged live pipelines of client.

 

Work  Experience:

Working as a Construction Coordinator with integrity, trust and leadership skills over 8 year in Department of Pipelines, Piping both in fabrication, erection and commissioning of Oil and  Gas projects, involving high pressure and high temperature to low temperature service pipe lines,( Where in operating pressure is up to 4800 psi and temperature range from – 40° F to 1020° F ), super-heated steam pipe lines, stabilized grade stainless steel pipelines, steel structures, pipe supports, pipe racks.

 

 

  Experience :

           

“October 2012 to Present

 Saipem (Eni group)

 Building of new slug catcher near Mina Abdullah

 Kuwait oil company (KOC)”

     

      “January 2011 to September 2012

       Saipem (Eni group)

       New Booster station BS-171 plant and Pipeline, west Kuwait.

       Kuwait oil company (KOC)”

 

SAIPEM is one of the global leaders in the Engineering & Construction and Drilling businesses, with a strong bias towards oil & gas-related activities in remote areas and deep-waters. We excel in the provisioning of engineering, procurement, project management and construction services, with distinctive skills and capabilities in the design and execution of large-scale offshore and onshore projects. We also offer cutting-edge technologies for the gas monetization and heavy oil exploitation.

 

I joined Saipem in January 2011, who operates as the main contractor for New booster station project and new intermediate slug catcher for Kuwait oil company. The project cost is approximately 1.2 Billion Dollars. My role is coordinate and supervise the subcontractors construction activities, clients and consultants.

 

Responsibilities:

 

  • Ensure the direction of the pipeline project construction activities, both performed by subcontractors or in direct hire, supervising multidisciplinary construction works according to contract requirements and project objectives;
  • Ensure time, costs, quality, safety targets are met, through direct coordination and management of a project construction team, interfacing with project organization, subcontractors and clients;
  • Support project management in defining, monitoring and updating project execution plans;
  • Ensure the implementation of HSE procedures for construction and pre-commissioning;
  • Ensure the implementation of site quality control plan;
  • Give the guidelines for the definition of construction strategies, such as subcontracting plans, logistic and constructability studies, during the earlier stages of the project;
  • Participate in defining the overall project planning and scheduling for construction activities, with the support of the expertise of construction organization key positions;
  • Ensure the application and, where not already arranged in the planning phase, the issue of suitable procedures for the definitions of working methods and site regulations;
  • Ensure that the activities are carried out within the planned time and costs, coordinating and instructing the construction team accordingly and intervening with corrective actions in case of deviations or difficulties;
  • Ensure the progress data gathering and analysis in order to prepare the work progress reports;
  • Ensure effective interdisciplinary coordination verifying adequacy and consistency of construction strategies;
  • Take necessary technical decisions in case of unresolved conflicts between disciplines, ensuring the optimization of construction sequences;
  • Ensure and coordinate the mobilization and demobilization of the assigned resources, in accordance with the project planned time frame and project needs;
  • Coordinate the execution of multidisciplinary construction activities and manage activities assigned to subcontractors, providing the guidelines for the execution of the works and monitoring the adequacy of manpower and equipment to face the construction activities;
  • Ensure the achievement of the established construction milestones, including the mechanical completion objectives;
  • Manage the interfaces with the Client for all the matters relevant to construction activities; Manage the interfaces with engineering departments for drawings and materials availability;
  • Ensure the correct quantities accounts of the works, monitoring productivity;
  • Ensure/manage the Mechanical Completion activity by “System & Sub-System” as clearly identified by Commissioning Manager, monitoring the schedule, Quality certification, punch list, up to final handover to Commissioning / Client.

 

Experience :

          

“June 2010 to December 2010

  Mohsen Saleh Al-harthi, Saudi Arabia

        Construction of New Mercury removal unit. 

        Saudi Aramco”

  “March 2008-june 2010

   Mohsen Saleh Al-harthi, Saudi Arabia

   Construction of New Storage tanks in Uthmaniya Gosp. 

   Saudi Aramco”

 

Mohsen Saleh Al-Harthi & Partners company operates as one of the leading construction companies in the Saudi Arabia. The company, which is employee owned, pursues a broad variety of projects, including the construction and renovation of industrial and residential spaces, commercial offices, airports,  the renovation jobs of  Saudi Arabian Oil Company (Saudi Aramco) and Saudi Electricity Company (SEC),. The company activities are providing  technical manpower also include construction, maintenance and trading in the disciplines of civil, mechanical & electrical.

 

I joined MSH in March 2008, My role is coordinate and supervise the subcontractors construction activities, clients and consultants.

 

Responsibilities:

  • Responsible for developing, planning, coordinating and implementing all tasks that relate to projects.
  • Manages engagements from all departments, clients and vendors internally and externally in order to ensure the project is delivered on time, on budget and to agreed quality standards.
  • Proactively coordinates all aspects of the project, determine new ways of project development and to keep the Project Manager well informed of any updates.
  • Responsible for site engineering activities and providing technical assistance to the construction supervision team.
  • Develops and maintains a detailed project schedule which includes administrative and site tasks involved in the project.
  • Participates in project Team Meetings.
  • Coordinates meeting, including clients, subcontractors and vendors.
  • Maintains Project Managers calendars.
  • Controls locations of project sites/offices include all coverage.
  • Ensures coordination of the interfaces of project team and other Operations are meeting the project requirements.
  • Prepares and/or edit meeting minutes, presentations and tables.
  • Coordinates and maintains all filing and document issues with the documents controllers.
  • Coordinates with the project manager on project changes and produces updated site based schedule as agreed.
  • Prepares reports and making presentations to higher officials and seniors on the project status.
  • Serves as primary point of contact with external vendor representatives and functional consultants on overall project matters.
  • To coordinate for the shutdown activities of Off plot and On plot tie in pipeline works include shut down plan preparation, man power, machinery, shut down materials and equipment estimation, coordination for the Permit To Work procedure with client, coordination for the site preparation etc.
  • Preparation of construction method statements and procedures like procedures for fabrication of piping, installation and testing of piping and structure’s, installation of Equipments etc.
  • Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.
  • Assist Design Department in solving Piping Modification and Technical Problems in the Field.
  • Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.
  • To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of material/equipment as per vendor specification.
  • Responsible for counter checking the spools erected in the correct location, orientation and  alignment.
  • provide technical assistance, direction, and support to the construction and installation activities for all Mechanical/pipelines and Piping works.
  • Review design documents and provide constructability input to designs. Participate in model reviews resolving constructability challenges.

 

Educational Qualifications:

 

Bachelor Degree in MECHANICAL  ENGINEERING from L.B.S COLLEGE OF ENGINEERING, Kannur  University, Kerala, India.                                                                                                           

12th in science group passed from Higher Secondary Education Board, Kerala.                      

S.S.L.C passed from Kerala State Secondary Education Board.

Approved LIHS (Leadership In Health & Safety) trainer from Saipem Corporate.

IELTS score of band 7.0

Approved by Australian engineers association as mechanical engineer.

 

Technical Courses:

 

Primavera p 6.0.

Certificate course in piping engineering.

Undergone training of CANUSA GPS for HSS applications.

Technical training in first aid course during construction activities.

Undergone training for bond strand training for RTRP key lock and bonding joints.






popup-img