I am a Senior Welding Inspector with certification in Welding/Coating Inspection, Radiographic Interpretation, MPI, and UT. Career Summary. I started in gas distribution (low pressure gas) as a labourer then went to college and gained my Gas Service Layer qualification. I got promoted to team leader and installed low pressure PE gas pipe. I moved on to high pressure Pipelines as an assistant Radiographer, went to college and learnt a little about electronics and became a Radiographic Crawler Technician. As a Radiographic Crawler Tech I worked on many projects onshore and offshore. I went to Blackpool & Fylde College for NDT training and gained Level 2 ASNT in UT, Radiography, MPI and LPI, worked as a Multi Disciplined Tech onshore Pipelines and offshore Pipelines. I attended courses on inspection and gaineddisciplines in Welding and Coatings. I now hold Welding/Coating Inspector with Radiographic Interpretation, MPI, UT plate in CSWIP, PCN and BGAS, I have worked as a Multi Disciplined Welding/Coating Inspector on Landlines on Stringing, Bending, Frontend, RDX, RVX, RLX, SF SS, Lower & Lay, Tie ins Coating and Backfill. I have also worked on flow lines in the desert, spoolbases, spool barges and lay barges, AGIs, Facilities, Compressor Station, Refineries and a couple of plants. I worked for OPA, locating and repairing defects on Pipelines.

Current location:  United Kingdom - View on map
Nationality: British
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english
Location I am interested in working: Anywhere

QUALIFICATIONS

CSWIP 3.2 Senior Welding Inspector Level 3

PCN l l Radiographic Interpretation Light & Dense metals

PCN l l MPI

Radiation Safety

BGAS-CSWIP Site Coatings Inspector

BGAS-CSWIP Pipeline Welding Inspector

BGAS-CSWIP Ultrasonic Inspector Plate

BGAS-CSWIP Radiographic Assistant

Offshore Survival BOISET

Panamanian Seaman’s Book

Gas Service / Main Layer

WORK EXPERIENCE

Oct 2014 –

RasGas Qatar On board HD-1000 for the FAP Project as The Clients Inspector.

Duties, Monitoring and witnessing WQT, Radiographic Interpretation, Bend Tests.

Risers and Spools Fabrication.

March 2014-July 2014

Saipem America. Mexico Veracruz. On board Wei LI Heavy Lift Crane Vessel

QC Supervisor for the Pemex Project

Dec 2013- Feb 2014

Saipem Nigeria On board The Crawler Vessel in the Gulf of Guinea

QC Supervisor for the USARI – IDOHO 24” Pipeline II Nigeria

June 2013-Dec 2013

Saipem Croatia. On board The Crawler Vessel in the Adriatic. QC Supervisor for the IKA JZ Development Project. For INAgip

10” Pipeline with twin piggy back 2” and 3”. Plus Installation of 10” 3” 2”

Spools, Risers and Well Head Module

Saipem Turkey. Tuzla on board The Crawler Vessel Ships Maintenance. QC Supervisor

Sail to Trieste Italy, WQT and Mechanical Tests on route for IKA JZ Project, Passo and SMAW

Dec 2012- March2013

MCJV-QCLNG Queensland Australia. Export Pipeline and Gas collection Header.

Welding Inspection and Radiographic Interpretation in Facilities

APRIL 2012- Dec 2012

Saipem Singapore Port on board Castoro Otto. Ships Maintenance. QC Supervisor.

Saipem UK North Sea on board Castoro7. Statoil Gudrun, Nexen Scott & Centrica York

Welding/Coating Inspector. Witnessing parameters for Welding /Coating.

Repairs and NDT on12” 14” plus a 16” with a 3”piggy back.

April 2011- Nov 2011

Subsea 7 Norway Vigra spool base. Nexen, Exxon, Centrica, Dana Triton Projects

Welding/Coating Inspector. Spooling

Then offshore onto the Severn Navica for pipe lay and final tie INS

Monitoring parameters for Welding, Coating, repairs and NDT

Oct 2010 – March 2011; Subsea 7 Angola. Luanda spool base BP Block 18 Project

Welding/Coating Inspector on intermediate tie ins and spooling.

Then offshore onto The Seven Oceans for pipe lay and final tie INS

Monitoring parameters for Welding, Coating, repairs and NDT.

July 2010- Sept 2010; Powec-Welding Engineering & Consultancy for PPS Pipeline Services.

Beuningen to Odiliapeel 48”Gas Pipeline Holland, Welding inspector. On lower & lay and tie ins.

Witnessing parameters for Welding and repairs.

April 2010- June 2010; Subsea 7 Norway, Vigra spool base. BP SKARV Project

Coating Inspector. Monitoring parameters for Coating

March 2009 –Nov 2009; WA Ha Oil Co. Libya Farah Phase Two. CLIENTS INSPECTOR

Based in the desert. Monitoring Flow lines, Stringing, Welding, NDT, Radiographic Interpretation, Coating Trenching, Lower & Lay, and Backfill,

October 2008 – Jan 2009; Alston Power Plymouth CLIENTS INSPECTOR

Monitoring Welding NDT, Radiographic Interpretation

JULY 2008 – SEPT 2008; SIAM/SAPHAIR FILTER REPLACEMENT PROJECT EGYPT. CLIENTS INSPECTOR

Monitoring Welding, MPI, Coating and Radiographic Interpretation

MAY 2008 – JULY 2008; ICAS; FOR LAND AND MARINE WELDING & COATING INSPECTION

Kerrimuir compressor station. Scotland. Welding & Coating inspection, MPI, UT

MARCH 2008 – MAY 2008; IACS EMPLOYMENTS SERVICES FOR NATIONAL GRID. Clients Inspector

Aberford to Pannal 48” Gas Pipeline. Yorkshire. Front End, Weld inspection, UT, MPI

SEPTEMBER 2007 – DEC 2007; ICAS; FOR NACAP LAND AND MARINE WELDING INSPECTOR Lockerly to Marchwood Gas pipeline Southampton. Welding Inspection UT MPI on Lower and Lay and Tie ins

APRIL 2007 – SEPTEMBER 2007; ICAS; FOR NATIONAL GRID. CLIENTS INSPECTOR

48″ Gas pipeline Brecon to Tirley Welding Inspection UT tie in special fabrications

.FEB 2007- APRIL 2007; O’NEIL SERVICES FOR OPA. CLIENTS INSPECTOR

AA East West 8″ fuel line repair. Welding and coating Inspection UT. Monitor Hydro Test

JUNE – DEC 2006; NRL SERVICES FOR NATIONAL GRID. CLIENTS INSPECTOR

48”Gas pipeline Milford haven to Aberdulias Welding Inspection, on the Front-end, Lower and Lay Tie Ins, and Fabrications also Logging pipe delivery.

AUG 2005 – NOV 2005; SOLUS TESTING LTD FOR OPA. CLIENTS INSPECTOR

East to West 12″ Aviation Fuel line repairs

Duties Welding Inspection Various AGI Duties included UT Radiography, Radiographic interpretation, and MPI. Monitor Hydro Test

SEPT 2004 – NOV 2004; SOLUS TESTING LTD FOR OPA

8″ Dia Aviation fuel line division – Truro Radiography & interpretation on behalf of WK Engineering

JAN 2004 – AUG 2004; SOLUS TESTING LTD FOR SGS GOTFELD. TURKEY

48″ oil pipeline Baku-Tyblise-Cheane Turkey, Duties included, Supervisor, Crawler Technician and Radiographic interpretation. UT; MPI

JAN 2003 – JAN 2004; SOLUS TESTING LTD FOR OPA. CLIENTS INSPECTOR

Redcliffe Bay Tank farm. Welding Inspection MPI, UT and Radiographic interpretation.

OCT 2002 – JAN 2003; FORMAT INSPECTION SERVICES NDT TECHNICIAN

Pulrose power station – Isle of Man, MPI, Dye Pen, UT, Radiographic Interpretation.

JAN 2002 – AUG 2002; OCEANEERING CRAWLER TECHNICIAN. CAMEROON

Chad-Cameroon oil pipeline Crawler Technician, MPI, Nitol tests UT

England Salmesbury to Helmshore 36” Gas pipeline

MAY 2001 – DEC 2001; NRL SERVICES FOR NATIONAL GRID. CLIENTS INSPECTOR

36” Gas Pipeline Maudling to Indian Queens Welding Inspector. Frontend, Bending, also covering inspection on AGIs associated with the project.

MAY 2000 – OCT 2000 ; SGS GOTTFELD FOR NATIONAL GRID.RADIOGRAPHER / CRAWLER TECHNICIAN

Assigned as Radiographer / Crawler Technician on Honey Bourne to Newboldpacey and worming ton to Tirely 36” Gas pipeline projects

FEB 1999 – June 1999; SHAW QED PIPELINE SERVICES MULTI-DISCIPLINED TECHNICIAN

Assigned as Multi- disciplined Technician onboard the Solitaire Lay barge.

Duties included Scanner Technician MPI and UT. During this period he also attended a 3 week

Course in Canada on AUT

AUG 1998 – NOV 1998; OCEANEERING MULTI-DISCIPLINED TECHNICIAN

Assigned as Multi-disciplined Technician on Lay barges: Seaway Falcon and McDermott-ETPM DLB 200, Alwyn North Platform Duties included; UT, Radiography MPI Darkroom Tech and Crawler Technician

JUNE 1998- AUG 1998; SPREE NDT LTD CRAWLER TECHNICIAN / RADIOGRAPHER

Scotland. St. Fergus to Peterhead 36” Gas Pipeline project

JAN 1998 – JUNE 1998; BLACKPOOL AND FYLDE COLLEGE

NDT Training! Achieved Level 2 ASNT in Ultrasonic’s, Radiography, MPI, and Dye Pen.

APR 1997- AUG 1997; OCEANEERING RADIOGRAPHER / CRAWLER OPERATOR

Assigned as Radiographer / Crawler Operator onboard the McDermott EPTM Lay barge DLB1601. Luton to Huntington 36” Gas Pipeline project.

1996’1997 SGS. HOLLAND RADIOGRAPHER

Assigned as Radiographer Holland on the Vlisingham Total Refinery shut down and the

Kooganger PGL 773 12” Pipeline project.

1995’1996 SGS. MOROCCO RADIOGRAPHER / CRAWLER TECHNICIAN

Maghreb to Europe 48” Pipeline project, Morocco.

1994’1995 EUROSPECTION RADIOGRAPHER/ CRAWLER TECHNICIAN DARKROOM TECHNICIAN

Radiographer/ Crawler Technician Darkroom Technician on the following projects;

Ireland. Dublin Southern Feeder Gas Pipeline

England. Derbyshire, Elrewash AGI (British Gas).

Warrington to Widnes and Warrington to Windle Divert 36” Gas Pipeline

Wales. Burton Point AGI

1992’1993 SOLUS SCHALL RADIOGRAPHER / CRAWLER TECHNICIAN

Assigned as Radiographer / Crawler Technician on the following Pipeline projects

Point of Ayre Land Pull 24” Oil Pipeline

Tilbury to Handon 36” Gas Pipeline.

St .Neots to Cambridge 36” Gas Pipeline.

Skitter to Hatton 36” Gas Pipeline.

Workington Sewerage Outfall Pipeline

Mary port Sewerage 96” Outfall Pipeline

Whitehaven Sewerage Outfall Pipeline

1991 1992 MEDCREST INSPECTION

RADIOGRAPHER / CRAWLER TECHNICIAN AND DARKROOMTECHNICIAN Radiographer / Crawler Technician and Darkroom Technician on the following projects

Sutton to Burniston 24” Gas pipeline,

Mickletrafford to Deeside 36” Gas Pipeline.

1991’J MURPHY & SONS LTD. (EAST MIDLANDS) TEAM LEADER GAS SERVICE / MAIN LAYER

Duties included; lead a team laying low pressure gas pipes, first, trail holes for buried services, drains and cables. Most times we had a choice to Open cut trench or thrust bore from main hole to reception

Pit, Insert up old services or mains pipe, or extraction of old and insert new pipe. Joining PE pipe by hot

Iron and Electro fusion, drilling and tapping of live gas mains, Air Pressure Testing, Connections, Backfilling and Reinstatement. (Soil, Tarmac, Concrete, Slabs)