Senior Civil and Structural Engineer Oil and Gas

Available
Serial No: 6843
Skills keywords: basic design, detail engineering, modular design, seismic design

Short Bio:

CAREER SYNOPSIS
I have matured from a background in Structural Design for Oil-Gas and petrochemical Industries to senior consultancy on multi-million dollar project developments, being involved in all areas of structural engineering from conceptual design through construction to commissioning and hand-over.
I studied civil and structural engineering and graduated in onshore techniques.
I am married and have one child, reside in UAE and communicate native language Persian and I am fluent in English.
I have a wide experience in the basic design of major projects from plot plan preparation and create a PDS modeling (basic design) up to detail engineering.

SUMMARY:
Senior Civil and Structural Engineer with 15 Year Experience in Oil - Gas and Petrochemical Industries
Specialties:
•Extensive international experience in Civil and Structural Engineering, and related disciplines. Having opportunity to work with Linde AG (Munich) and Technip (Lyon) for some projects.
•Creative, result-oriented professional with 15 years of progressive achievement providing technical solutions to Oil - Gas and Petrochemical industries challenges.
•Detail Design
•Basic Design
•FEED (Front End Engineering Design)
•Modular Design
•Expert in Seismic Design
•Expert in structural software such as Sap and STAAD Pro.
•Expert in PDS Framework and Microstation.
•Codes and Standards: UBC97, IBC, AISC (ASD, LRFD), ACI, ASCE7 and BS.

Current location:  United Arab Emirates - View on map
Preferred Sector of Employment:  accounting and finance
Spoken languages: english, PERSIAN
Location I am interested in working: Anywhere

ACADEMIC RECORD:

1) HIGH SCHOOL DIPLOMA : Razi High school ( Tehran/Iran) 1985

2) BACHELOR OF SCIENCE – Civil and Structural Engineering : Azad University – Central Branch – Tehran/Iran – 1992 to 1997

TRAINING COURSES:

1) Frameworks Environment (Plant Design System) : Linde AG (Munich/Germany) 2001

2) Equipment Modeling (Plant Design System) : Linde AG (Munich/Germany) 2001

3) Drawing Manager (Plant Design System) : Linde AG (Munich/Germany) 2001

4) MicroStation : Linde AG (Munich/Germany) 2001

SKILLS & EXPERTISE :

• STAAD.Pro

• SAP

• MS OFFICE

• MATHCAD

• STEEL DESING

• CONCRETE DESIGN

• FOUNDATION DESIGN

• EQUIPMENT FOUNDATION DESIGN

• PDS (FRAMEWORKS ENVIRONMENT)

• MICROSTATION

• AUTOCAD

PROFESSIONAL EXPERIENCE

(15 Years Experience in Oil – Gas and Petrochemical Industries):

June of 2006 to Present – PETROFAC INTERNATIONAL LIMITED (SHARJAH / UAE)

1) Laggan – Tormore Field Development Project (JI-2005) / Shetland Ilands on the UK

Continental Shelf – Shetland Gas Plant (November of 2011 to Present)

• Client : Total E&P UK Ltd

• Structural Analysis and design for Preassembled Steel Structures Including of:

– Inplace Analysis

– Lifting Analysis

– Road Transportation Analysis

– Sea Transportation Analysis

– Preparation of Sample Calculation notes

– Weight Control Report

2) Gas Sweetening Facilities Project (JI-2001) / Qatar (September of 2010 to November 2011)

• Client : Qatar Petroleum

• Responsible for Analysis and design of Static Equipment Foundation

3) Asab Full Field Development Project (JI-193) / Abu Dhabi (March of 2009 to Sep. of 2010)

• Client : ADCO

• Analysis and design of Pipe Rack

• Analysis and design of Pipe Rack Foundations

4) In Salah Gas Compression Project (JI-189) / Algeria (November of 2007 to March of 2009)

• Client : In Salah Gas

• Analysis and design of Blast Resisting Steel Structures

• Analysis and design of Steel Structures

• Analysis and design of Pipe Rack Foundations

• Analysis and design of Static Equipment Foundations

5) Proposal: KOC-New Booster Station BS-160 (PI-7004) / KUWAIT

(April of 2007 to November of 2007)

• Client : Kuwait Oil Company

• Responsible for Preparation of Bid Proposal – Assistant of Lead Engineer

6) Proposal: Brass LNG Project(PI-6018) / Nigeria (November of 2006 to April of 2007)

• Client : Brass LNG Limited

• Volume : 10 million tons per annum (MTPA) of LNG

• Responsible for Preparation of Bid Proposal – Lead Engineer

7) Azar Field Development Feed(PI-81867) / Iran (December of 2006 to February of 2007)

• Client : Hydro Zagros Oil & Gas

• Responsible for Preparation of Drainage Calculation and

Earth Work Volume Calculation– Assistant of Lead Engineer

8) Soroosh And Nowrooz Offshore Integrated Development (JI-709) /Iran

(September of 2006 till November)

• Client : Shell

• Responsible for preparation of Steel Structural Secondary Supports – Assistant of Lead Engineer

9) Proposal: Zarzaitine Oil Field (PI-6016) / Algeria (June till September of 2006)

• Client : Sinopec-Sonatrach

• Preparation of Bid Proposal – Assistant of Lead Engineer.

1996 – 2006 NARGAN CONSULTING ENGINEERS Co. (TEHRAN / IRAN)

10) Low Density Polyethylene Plant – 9th Olefin Complex- Asaluye / Iran

(Sep. of 2003 till June 2006)

• Client : NIPC (National Iranian Petrochemical Company)

• Joint venture with Technip- Lyon/France

• Responsible for 3D modeling of the Plant (3 months Technip/France).

• Responsible for modeling of all civil elements and civil works with PDS.

• Preparation of civil drawings

• Assistant of Civil & Structural Group Lead Engineer.

11) C2+ Recovery Plant- Marun / Iran (Apr. 2001 to Sep. 2003)

• Client : NIPC (National Iranian Petrochemical Company)

• Joint venture with Linde AG- Munich/Germany

• Lead Structural Engineer of the Task Force Project (6 months Linde/Germany).

• Responsible for modeling of all structural elements and civil works with PDS.

• Responsible for preparation of loading drawings and structural drawings.

12) South Pars Phase I Gas Refinery Utility And Offsite Facilities- Asaluye / Iran

(2000 to 2001)

• Client : NIPC (National Iranian Petrochemical Company)

• Analysis and design of blast proof concrete structures with SAP 2000.

13) Melamine Petrochemical Plant- Bojnord / Iran (1999 to 2000)

• Client : NIPC (National Iranian Petrochemical Company)

• Analysis and design of steel and concrete structures with SAP 2000.

• Design of equipment foundation.

14) Paraxylene Production Plant- Bandar Emam / Iran (1998 to 1999)

• Client : NIPC (National Iranian Petrochemical Company)

• Responsible for preparation and checking of the shop drawings in Paysaz Co. Ahwaz / Iran

15) Tabriz Polypropylene Plant- Tabriz / Iran (1997 to 1998)

• Client : NIPC (National Iranian Petrochemical Company)

• Responsible for preparation and checking of the shop drawings in

Tehran Industries Co.- Karaj / Iran

16) Esfordi Phosphate Plant- Yazd / Iran (1996 to 1997)

• Client : NIPC (National Iranian Petrochemical Company)

• Responsible for checking of the shop drawings

1994 – 1996 GOZARRAH CONSULTING ENGINEERS Co.(TEHRAN / IRAN)

17) Niayesh high way, Kordestan high way and Park way Bridge- Tehran / Iran

• Cilent : Tehran Municipality

• Cooperation in road and traffic design.

• Student of Civil & Structural Engineering

 

 






popup-img