QA or QC Supervisor Oil and Gas

Available
Serial No: 4771
Skills keywords: ms word
Current location:  Iraq - View on map

Orascom Construction Industries, Cairo, Egypt.
Quality Assurance & Quality Control Manager.
Since January 2013 to till date.
Project profile:
Project: Baiji 6 x SGT 5 – PAC 2000 E Dual fuel + Heavy fuel Oil.
Plant capacity and type: 1014 MW ( 169 MW X 6 ) Single Cycle Power Plant.
Owner: Republic of Iraq Ministry of Electricity.
Contractor: Orascom Construction Industries. OCI is EPCC contractor for this
Project. SIEMENS AG, Germany will supply all the Gas Turbines and Generators with obligatory Technical Field Advising ( TFA ) services.
Contract value: Approximately 363,000,000 USD.
Project duration: 21 months.
Project location: Erbil , IRAQ.
Key tasks / duties / responsibilities:

  • Scheduling, organizing and implementing project-specific QM measures during proposal preparation and project execution (planning and site phase) including preparing the required specialist QM proposal texts and project documentation
  • Developing and implementing the Project Quality Plan (PQP), based on the QM system, considering individual project requirements
  • Establishing the project quality audit plan internally as well as externally with suppliers / subcontractors
  • Performing project quality audits
  • Participation in project status meetings, design and engineering reviews
  • Evaluating suppliers’ / subcontractors’ QM systems and their QM activities
  • Reviewing and approving of all associated suppliers / subcontractors issued QA/QC documentation during project execution (planning and site phase)
  • Supervision of site inspections and quality measures
  • Monitoring and reporting the quality status and follow-up of non-conformance / corrective actions
  • Interface with client quality representative
  • Lead of site quality engineers
  • Ensuring complete, correct and traceable QA/QC documentation including compliance with all checking and release procedures
  • Creating and maintaining a culture of QA/QC awareness and effective use of the standards in the project.
SPIE Oil & Gas Services Saudi L.L.C, Saudi Arabia ( A Consortium of PSA2000, KSA & Solios Environment - Fivesgroup, France ).
Project QA / QC Manager  
January 2012 – December 2012.
Project field: Gas Treatment Plant for  Alcoa Ma’aden Aluminum Project.
Work location: Ras Al- Khair, Nearest Airport, Dammam,  Saudi Arabia.

Punj Lloyd Limited, South East Asia, Myanmar.
Senior QA/QC Manager
June 2011- Dec 2011   
Project field: China Myanmar Oil and Gas Pipe Line project.
Work location: Yangon, Myanmar.

Orascom Construction Industries, Cairo, Egypt   
Senior Mechanical Quality Control Engineer  
Jan 2009 to May 2011  
Project field: 400 MW x 3 Combined Cycle Power Plant (A project of ALSTOM power ltd-France).
Work location: Terga, Algeria.

Global International Services-Material Inspection Control ( GIS-MIC ), France.
QA / QC Manager  
April 2008 – December 2008
Project field:  350 MW X 2 Combined Cycle Power Plant.
Work location:  DSD Ferrometalco ( A German Company ), Cairo, Egypt.

Technip,  France  
Piping QC Inspector  
June2007 – March 2008  
Project field: An EPCC Project for TOTAL LNG (Oil & Gas Industry).
Did work as an employee of Technip for the CONTRACTOR YEMGAS ( JV : Technip, KBR, JGC ).
Work location:  Balhaf site, Yemen.

Dodsal Pte Ltd.,   
Senior Quality Control Inspector
January 2007 – May 2007
Project field: Oil & Gas Pipe Line Project.
Work location: Qatar Petroleum, Ras Lafan, Qatar

Japan Gas Company ( JGC), Yokohama, Japan.  
QC Engineer - Rotating Equipment.  
January 2006 – December 2006.  
Project field: Hawiyah LNG project (Oil & Gas Industry) - A Saudi Aramco project.
Work location: JGC Corporation HQ, Yokohama, Japan.

Hyundai Heavy Industries Co., South Korea.  
Senior QA/QC Engineer
Jun 2005 – Dec 2005  
Project field: 76 MW X2 Combined Cycle Power Plant - A Saudi Aramco project.
Work location: Ras Tanura Refinery, Saudi Arabia.

Det Norske Veritas (DNV), Hovik, Norway.  
Head of the Department - Inspection Division.
Nov 2003 – May 2005 
Project field: 210 MW x 3 Combined Cycle Power Plant
Work location: Gujarat, India.

The Kuljian Corporation, Philadelphia, U.S.A
Mechanical Quality Control Inspector  
November 2001- November 2002   
Project field: 130 MW X 2 Combined Cycle Power Plant - A Saudi Aramco project.
Work location: Saudi Arabia.

Development Consultants Limited, Kolkata, India
Senior Mechanical Quality Control  Engineer.  
April 1983 - October 2001 & Dec.’02 - Oct.03 ( 19 Years ).
Project field: Power Plant Construction.
Major project:
  1. 225 MW x 3 Combined Cycle Power Plant From Siemens AG, Germany -  1996-1998.
  2. 225 MW x 3 Combined Cycle Power Plant From Marubeni / DABB, Germany /Kawasaki Heavy Industries, Japan - 1993-1995.
Work location:  All over India

Spoken languages: english, Spoken
Location I am interested in working: Anywhere





popup-img