CV, UAE Based Field Engineer, Subsea, Looking Globally

Available
Serial No: 18998
Skills keywords: pipeline installation, riser installation, sleeper installation

Short Bio:

I have a 6 years expereince in subsea installation works. I have worked for Leighton contractors India limited for ONGC projects in Mumbai high which includes installation of Pipeline, Riser Installation Clamp installation and groutbag installations.Currently I am working with valentine maritime gulf llc in SARB-3 project of ADMA OPCO client. I am involved in piggyback pipeline installation works, Shorpull works and sleeper installation works.

Current location:  Abu Dhabi, United Arab Emirates - View on map
Nationality: Indian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english, gujarati, Hindi
Location I am interested in working: Anywhere

Qualifications

B.E. MECHANICAL ENGINEERING JUNE 2008
L.C.INSTITUTE OF TECHNOLOGY, BHANDU H.N.G.U. ( PATAN )

Projects Undertaken

 Pipeline Replacement Project – 2: Client: Oil & Natural Gas Corporation of India
Owner: Oil & Natural Gas Corporation of India
Period of Execution: Season 1 (2008-2009), Season 2 (2009- 2010 & Season 3 (2010-2011)
Value of Project : INR 2700 Crores

 SPM & Associated Facilities Project: Client: Engineers India Ltd
Owner: Mangalore Refinery &Petrochemicals Ltd
Period of Execution: 10 Months
Value of Project: INR185 Crores

 Pipeline Replacement Project – 3: Client: Oil & Natural Gas Corporation of India
Owner: Oil & Natural Gas Corporation of India
Period of Execution: Season 1 (2012-2013) and Season 2 (2013-2014)

Career Summary

COMPANY:VALENTINE MARITIMEGULF LLC (ABUDHABI)
CLIENT : ADMA-OPCO / PETROFAC
June2014 – Present day

Job Profile:
Worked as Field Engineer for SARB Field development project package 3 (ADMA-OPCO).

Key Responsibilities :

 Worked on barge DLB 1600 for the sleeper installation using echo sounder equipment.

 Working on DLB 1600 for the piggy back pipeline installation.

 Go through the installation procedure and identify the problems ahead of installation and take the corrective action.

 Prepare the list of Installation aids, permanent material and temporary material that will be required during the installation.

 Make sure that the key personnel on the barge are aware of the scope of works by preparing the work pack statement and discuss the same in the meeting.

 Coordinate with base for any material requirement and highlight the issues to the base office avoid any stand by of the barge.

LEIGHTON CONTRACTORS (INDIA) PVT LTD
CLIENT : ONGC
January 2009 – June 2014

Job Profile :
Worked as a Project Engineer for MRPL SPM Project (EIL) and Pipeline Replacement Project – 3, APP & HRD2 Project (ONGC) in Leighton Welspun Contractors Pvt Ltd.

Key Responsibilities :

 Preparation of Work Method statement in line with the Clients specification and getting it approved from the Client.

 Identify the list of installation aids, permanent items required for installation and raise the RFG’s for the same.

 Review the engg drawings and give comments if there are any issues from installation point of view.

 Prepare the checklist for the list of materials and procedure to be required at offshore.

 Prepare the scope of works for the subcontractors.

 Do the technical bid evaluation of the bidders and select the subcontractor.

 Prepared the estimation of voyages for the requirement of cargo barges for to match the pipelay productivity.

 Estimate the number of cargo barges and haulages required to support the pipe lay barge to meet the productivity targets.

 Prepare general arrangement drawing for finalizing the final layout of the barge.

 Provided assistance to the Sr. Project engg in mobilization of the barge in the field.

 Have done the assembly of the floating hoses and subsea hoses for the SPM at Onshore.

 Looking After the Dredging & Backfilling activities and monitoring the progress. Have worked on Dredger sical Portofino, Robert Bleak lay.

 Have done rigid Pipelay on Derrick lay barge Leighton Eclipse in Mumbai High.

 Make sure that the site memo is issued to client if there is any standby or order variation other than the contractual works and the same is being reflected in the DPR.

 Have handled Riser / I tube Clamp Installation, Crossing installation & Riser Removal on a DSV in Mumbai high.

 Played a key role for the riser Installation at the platform.

 Carried out pre-engg survey of the jacket face.

Job Profile :
Worked as Project Control Engineer for Pipeline Replacement Project 2 and MRPL SPM Project (EIL) and in Leighton Welspun Contractors Pvt Ltd.

Responsibilities :

 Make the planning package and submit it to client

 Keep the track of the project activities against the planned activities.

 Maintain the DCI-MCI matrix to update the engg progress and also highlight the list of documents awaiting the response of client.

 Weekly update the Schedules and Progress in Engineering, Procurement, Manufacturing activities.

 To keep the management informed about the current progress against the planned progress of the project.

 To produce the KPI’s of the major activities and update the other departments.

 To produce the weekly reports and Monthly report to keep the client updated about the projects progress

 To raise milestone of the completed activities and maintain the positive cash flow for the company.

 Identify the change orders and submit it to the client for approval

 Have played important role in the final close out of the PRP-2 project.

 

 






popup-img