CV, Filipino Oil And Gas Quality Control Manager

Available
Serial No: 17620
Skills keywords: quality management

Short Bio:

SUMMARY OF EXPERIENCE:

Over twenty four ( 24 ) years of experience in construction / Maintenance industry for Oil & Gas Refinery (Onshore & Offshore), Petrochemical Plants, Power Plants, Industrial Plants, Rotating Mechanical Equipment, and Heating, Ventilating & Air Conditioning Projects. I had been working overseas projects for over 20 years in different countries such as: Saudi Arabia, Qatar, The Netherlands, United Kingdom, Belgium, Germany, Russia, Myanmar, Malaysia and Singapore. 4 yea

Current location:  Singapore - View on map
Nationality: Filipino
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english
Location I am interested in working: Anywhere

Educational & Technical Qualifications

Bachelor of Science in Mechanical Engineering (BSME)

Mechanical Engineer licensure examination given by the Board of Professional Regulation Commission (PRC), Manila, Philippines last April 1988 (3 days)
Result: Passed
Overall rating: 81.4 %
Mechanical Engineer licence no.: 0038077

Career Summary

Over twenty four ( 24 ) years of experience in construction / Maintenance industry for Oil & Gas Refinery (Onshore & Offshore), Petrochemical Plants, Power Plants, Industrial Plants, Rotating Mechanical Equipment, and Heating, Ventilating & Air Conditioning Projects. I had been working overseas projects for over 20 years in different countries such as: Saudi Arabia, Qatar, The Netherlands, United Kingdom, Belgium, Germany, Russia, Myanmar, Malaysia and Singapore. 4 years worked in local projects. From Project Engineer to Project Manager and from QC Engineer to QA/QC Manager, my experience in field execution includes; Piping / Structural Steel Fabrication & Installation , Mechanical Equipment Installation (static & rotating), Piping installation & design, Maintenance work, Quality Management & Inspections, Quality Documentation, Document control, Preparation of Quality Procedures , Testing of Welders, Quality Audits, Cost Estimates / Scheduling and Commissioning works. Familiar with ASME/ANSI codes, API, ASTM, AWS D1.1 and other Europeans standard, etc.

 

I) From May 2009 up to Aug 11, 2014:
Company : Atlantic Projects Company Pte Ltd
Address : 18 Trade Hub 21, #05-124, Boon Lay Way Singapore 609966
Position : Quality Manager
Primary Role : Management of Company QMS

SPECIFIC PROJECTS

A. June 01, 2013 to Feb. 28, 2014

Project Assignment: RAS AL-KHAIR 2400MW GAS POWER PLANT, KSA

Project Location: RAS AL-KHAIR, Kingdom of Saudi Arabia

Function: I was assigned as Quality Consultant (Owner side)

Main Contractor: Shandong Electric Power Company (SEPCO III)

Owner: MA’ADEN Aluminium Company & Saline Water Conversion Corporation (SWCC)

Owner Engineer: POYRY

Project Description: RAS AL KHAIR, KSA, 2400MW POWER PLANT PROJECT: Block 10 Simple Cycle – 2 x 200MW SGT6-5000F Siemens Gas turbine, Block 20 Combine Cycle – 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG’s + 1 Steam Turbine; Block 30 Combine Cycle – 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG’s + 1 Steam Turbine; Block 40 combine Cycle – 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG’s + 1 Steam Turbine; Block 50 Combine cycle – 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG’s + 1 Steam Turbine; Block 60 Combine cycle – 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG’s + 1 Steam Turbine.

Notes: Part of the steam generated from the Combine Cycle Power Plant will be supplied to the nearby Desalination Plant (by other Contractor).

Duties and Responsibilities:

• Providing guidance and expert advice to the Main Contractor (SEPCO III) in all matters relating to Quality on the Power Plant and in particular with the
compilation, presentation and handover of all Quality Records, Documents, Test Packs etc., to the Client’s Engineer (POYRY) & Owner (SWCC).

• My role is primarily that of a senior advisor / consultant with responsibility for overall oversight of SEPCO III Quality Dept. to ensure compliance with
contract QA specification & requirements.

• Assist, advise and provide assistance to SEPCO III to expedite the completion of the project to the required quality standards.

• Review Turn Over Packages documentation prior to submission to the Owner Engineer (POYRY) for review and approval. This will include As-built

drawings, Inspection records, calibration certificates, and compliance of the approved Field Quality Plan.

• Ensure that Quality inspections are scheduled in a manner that document review and walk downs can coincide and any Punch Lists generated during
document review are closed out promptly.

• Report Quality Progress to APC Site Manager

• Report to APC Site Manager any Quality deficiencies observed and recommend improvement plan for him to discuss with SEPCO III higher
management.

B. May 18, 2009 to May 31, 2013
Project Assignment: ExxonMobil Singapore Parallel Train (SPT) Project – Major Mechanical Equipments Installation.
Project Location: Jurong Island, Singapore
Function: Deputy Site Manager and later part in 2010 was transferred to QA/QC
Department as a QA/QC Manager.
Client: Stone & Webster Asia, Inc
Owner: ExxonMobil, Singapore

List of Major Mechanical Equipments – APC Installation Work

Two water tube Boilers, 180 tons / hr capacity ; Two Heat Recovery Steam Generator; Two Gas Turbine GE F9E; Three Steam Turbine Driven Compressors; Pumps; Piping; Associated mechanical package / equipment; and Structural steels.

Duties and responsibilities:

Assist the Project Manager that includes cost estimates, scheduling & manpower distribution, prepare Method Statements, raised Technical Queries;

Quality Management that includes attend QA/QC meeting with the Client and Owner, Qualify welders as per ASME IX, Conduct quality audits, prepare WPS/PQR (as per ASME IX) and QA/QC Procedures, maintain and ensure that the implementation of the Project Quality Plan, ITP, and Client / Owner Project Quality requirements is being followed at site and of the whole Quality Department, Work & coordinate with ExxonMobil Project Management Team to bring PWHT work & Test Packages backlogs to zero within the target schedule, Lead equipment preservation including track record monitoring and report it to Client and ExxonMobil, Supervised the video scope internal inspection of pressure vessels & heat exchangers stored for long period of time in recovery area to confirm internal parts are free from any corrosion. Result of the inspection will be forwarded to ExxonMobil.

Assist Pre-com / Commissioning works after Mechanical Completion.

Note: Project completed on 30 April 2013

II)From April 1, 2007 to Feb. 2009:
Company : HKB Holland Ketelbouw BV / Galen Technologies Pte Ltd. (Joint Venture)
Address : Ankerkade 6, 5928 PL Venlo-Blerick, Gebouwwnr, 5916, P.O. box 3161, 5902 RD Venlo, The Netherland
Website : www.hkb-ketelbouw.nl
Position : QA/QC Manager & Technical Representative

SPECIFIC PROJECTS

A. July 16, 2008 to February 02, 2009
Place of assignment: Holland Ketelbouw BV (HKB) Workshop, HKB Address: Ankerkade 6, 5928 PL Venlo-Blerick, Gebouwnr, 5916, P.O. box 3161, 5902 RD Venlo
The Netherlands
Website: www.hkb-ketelbouw.nl
Project Name: BFG-PROJECT-GENT (BFG Pre-heater module)
Client: Hitachi Power Europe GmbH
Project Description: Fabrication of BFG Pre-heater module (Consist of module 1, module 2.1, module 2.2 x 2 & module 3)

Duties and responsibilities:

Responsible for all Quality aspects for the project including Documentation.

B. December 2, 2007 up to June 30, 2008.
Place of assignment: SembCorp Utilities UK
Address: Wilton International, Middlesbrough, United Kingdom
Project Name: Boiler Island Project Wilton.
Client: SembCorp Utilities (UK)

Project Description: Erection of 4 x 30 t/h of Steam Boiler Manufactured by Holland Ketelbouw B.V. including associated equipments (1 unit de-aerator, 2 unit blow down tanks, etc) & all civil works.

Duties and responsibilities:

Responsible for all Quality aspects for the project, Site Project Supervision & Safety, Assist Pre-com / Commissioning works of the Boilers prior to Hand Over to the Owner.

C. August 20, 2007 to December 1, 2007.
Place of assignment: Sumgait Power Station, Azerbaijan
Project Name: 1 unit HKB Auxiliary Boiler Erection Work
Position: Site Project Manager & Quality Manager.
Client: Siemens AG Power Generation.

Duties and responsibilities:

Responsible for the erection/installation of the auxiliary boiler including all quality aspects for the project. Assist Pre-Com / Commissioning works of the Boiler after mechanical completion works.

D. April 1 to August 19, 2007.
Place of assignment: Holland Ketelbouw BV (HKB) Workshop
HKB Address: Ankerkade 6, 5928 PL Venlo-Blerick, Gebouwnr, 5916, P.O. box 3161, 5902 RD Venlo, The Netherlands
Website: www.hkb-ketelbouw.nl

Duties and responsibilities:

Prepare Quality procedures and documentation & familiarize HKB company system.

III) From April 23, 1996 to March 31, 2007:
Company : JURONG Engineering Limited and its group of Companies
Address : 25 Tanjong Kling Road, Jurong Town, Singapore 628050, P.O. box 175, Singapore 916106
Company Certification : ISO 9001, ISO 14000, and ASME “U”, “U2”, “PP”, “S”, “A” stamps.
Position : Senior QA/QC Engineer & Senior Mechanical/Piping Engineer

A. October 25, 2006 to March 31, 2007.

Duties and responsibilities:

Preparation of JEL Maintenance division Quality Manual as per ISO 9001:2001 in preparation for the application for ISO 9001:2001 certification. For this task, the Company appointed me as Management Representative.

B. From September 26, to October 20, 2006.
Project Name: Kappar Power Station, Boiler # 5 Superheater inlet header and Super heater element tubes repair work
Address: Kappar, Malaysia

Duties and responsibilities:

Site Project engineer & Quality manager responsible for installation/inspection of the repaired area as per client requirements.

C. From August 2006 to September 10, 2006.
Project Name: Assigned to “ The PolyOlefin Company (TPC) Shutdown Maintenance Work 2006 for PE plant in Jurong Island, Singapore.

Duties and responsibilities:

Supply to Owner as SDM engineer.

D. From June 2006 to July 2006.
Project Name: SembCorp Utilities – Cogeneration Plant HRSG – 11 HP drum level control valve piping modification work in Jurong Island Singapore.

Duties and responsibilities:

Site Manager & Quality Manager responsible for the modification/repair/inspection of the modified/repaired parts.

E. From August 2005 to May 2006.
Project Name: SembCorp Utilities – Seraya Plant Expansion Project in Jurong Island, Singapore.
Project consist of the following: – Installation of 2 units of steam boilers (free issue by the client).  Installation of associated piping (natural gas, HGIW line, Demin. water line, Diesel pipe line, Plan/Instrument air line, Fire water line).  C & I and Electrical installation.  Boiler water feed pumps, pipe rack, Civil foundations installation. Other associated equipments.

Duties and responsibilities:

Senior QA/QC Engineer responsible for all Quality issues.

F. From April 2005 to July 2005 (Singapore Head office).
Assigned in JEL Maintenance Head Office for project tendering/quotation of incoming projects for bidding. Prepare QA/QC procedures of on-going projects.

G. From October 2003 to March 2005.
Project Name: Repair & upgrading of SUT (SembCorp Utilities) Boilers SK1, SK2 and MHI – 3,4,5 at SUT Sakra in Jurong Island, Singapore.

Duties and responsibilities:

QA/QC Engineer responsible of quality management of the repair & upgrading works.

H. From June 2003 to September 2003.
Project Name: Assigned to “ The PolyOlefin Company (TPC) Shutdown Maintenance Work for PE plant in Jurong Island, Singapore.

Duties and responsibilities:

Represent Owner side during shutdown works (PE plant), Supervise contractor’s shutdown works (PE plant), Apply work permits for contractor’s shutdown works (PE plant) and Inspection at site.

I. From October 2002 to May 2003.

Duties and responsibilities:

Assigned in JEL Maintenance Head Office for Project Management that includes Cost Estimates and prepare quotations for Project Bidding, Visit on-going maintenance works at various sites, Project Documentation, Project-in-charge of SUT ER’s maintenance work at SUT Sakra in Jurong Island, Singapore.

ER’s maintenance work are the following:

– ER-285/288 installation of service & maintenance platform.

– ER-HGIW installation of alternative high grade industrial water supply to

Chevron (FRP pipe line).

– ER-192/208 installation of FRP pipe line.

– IB-53 Installation of tank FRP cover (Approx. 10 x 10 M size).

– ER-253 Installation of service and maintenance platform.

J. From July 2002 to September 2002.
Project Name: Repair, re-installation and commissioning works for 2 units of Gas turbine – Frame 5 & frame 6 for Myanma Electric Power Enterprise in Myanmar.

Duties and responsibilities:

Supervised re-installation work of re-furbished rotor, installation of 1st/2nd/3rd turbine rotor blades/shroud blocks/nozzles, installation of lower half bearings, rotor installation, Installation of combustion cans/transition pieces and others until final closure of the upper half casing), conduct commissioning works, attend progress meeting with the client, work scheduling, inspection and Supervision of safety at site.

K. From January 2002 to April 2002.
Project Name: Sultan Salahuddin Power Station in Kappar Malaysia

– Repair of water pipe line for coal stacker/reclaimer.

– Manpower scheduling and estimates for Gas Turbine – frame 9 enclosure modification.

Duties & responsibilities: Project Engineer of the above works.

L. From October 28, 1998 to November 2001.
Project Name: Kuala Lumpur International Airport Cogeneration Plant Project Maintenance Work in Sepang, Selangor, Malaysia
**IHI is the main Contractor**
Owner: PETRONAS GAS DISTRICT COOLING

Duties and responsibilities:

Operation and maintenance engineer with the following: Assist IHI for the operation and maintenance of 2xLM2500 GE Gas turbine, Supervision of heat recovery steam generator guillotine damper installation, Assist IHI for Gas turbine periodical inspection (bore scope inspection, control system inspection, inlet/outlet duct inspection, etc.), Assist IHI during Gas turbine Hot Gas path section repair interval (HSRI) at 26,000 hrs operation.

M. From February 15, 1998 to October 10, 1998.
Project Name: SUT 140 t/h Boiler package x 3 units fabrication and erection works in Jurong Island, Singapore.
**MHI as the main contractor**

Duties and responsibilities:

QA / QC Engineer that includes: Prepare Welding Procedure Specifications, Prepare QA/QC procedures, Performed welders qualification test per ASME IX, Inspection at site and review radiographs, Liaise with the client inspectors for their witness and hold point inspection, and Documentation work.

N. From September 16, 1997 to January 31, 1998.
Project Name: PICOP chemical recovery boiler (water tube type) re-tubing works.
** ABB-USA as the main contractor**
Address: Bislig, Surigao del Sur, Philippines

Duties and responsibilities:

Project-in-charge with the following: Assist ABB-USA, Conduct safety meeting every day with our sub-

Contractors, Supervise installation & erection works, I was authorized by ABB-USA to conduct dye penetrant, testing on boiler steam/water drum tube to tube sheet seal welding and some other joints on super heater tubes & steam header, Work scheduling and manpower distribution, Assist commissioning works with ABB-USA, and Documentation work.

O. From April 23, 1996 to September 14, 1997.
Project Name: Kuala Lumpur International Airport Cogeneration Plant Project

Project consist of the following:

– Installation of 2 units of Gas Turbine GE LM 2500.

– Installation of 2 units Heat Recovery steam generator.- Installation of associated piping, pipe racks & Gas turbine

 