CV, Senior Electrical, Instrumentation and Telecom Engineer

Available
Serial No: 16838
Skills keywords: electrical

Short Bio:

 Lends 26 years of rich experience with expertise in Project Quality Control, Commissioning, Operation & Maintenance, industrial automation, standard systems configurations for Switchgears in Oil & Gas industry.
 Experienced in prepare, review and implement of Quality plan, Quality Control Procedures, Inspection and Test Plan and Method statements and perform site audits and provide inputs to KPI.
 Experience in reviewing Purchase requisition (PR), Purchase order (PO),ITPs,Test Procedures,

Current location:  Maharashtra, India - View on map
Nationality: Indian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english, Hindi, marathi
Location I am interested in working: Anywhere

EDUCATION:

• MBA in Operation ,IIBM, Pune.,Year-2010, with 79.25%.

• B.E. Electrical (Dyneshwer Vidhyapeeth,Pune,India) Year-2003, with 69.80%.

• Diploma in Electrical Engineering, Government Polytechnic Latur,India,Year- 1988, with 60.90%.

• Higher Secondary Certificate in Science, Latur, India, Year-1986, 75.50%.

• Secondary School Certificate Latur, Year-1984, 74.57%.

TRAINING & CERTIFICATIONS:

 CompEx Hazardous Areas Ex01-Ex04 (ATEX) training from Forth Valley College, Scotland, UK (valid up to May 2018.)

 Sea survival, H2s & BA set, Basic First Aid, HUET Training in Abu-Dhabi,UAE

 Electrical Safety Rules Training.

 Shell permit to work, Plant Emergency Planning, fire fighting course and Plant safety rules.

 Saudi ARAMCO authorized Job Task standard Evaluator & Job Trainer.

 Senior Technician Certificate, AMIE(India)

 PWD Electrical Supervisor , Mumbai, India(License No.22069)

 E-tap Software Training (Version-5.5) completed from KLG SYSTEL,Mumbai,India.(Training including Study of Single line diagram, Load flow analysis, Unbalanced Load flow, Motor acceleration with transient study, Harmonic Analysis effect study, short ckt. Fault analysis, Optimal Power flow study, Protective relay coordination, Electrical Circuit & Design study etc.)

 Member of the Society of Petroleum Engineers-Saudi Arabia Section (SPE ID 3417744)

TECHNICAL PROFILE:

 Lends 26 years of rich experience with expertise in Project Quality Control, Commissioning, Operation & Maintenance, industrial automation, standard systems configurations for Switchgears in Oil & Gas industry.

 Experienced in prepare, review and implement of Quality plan, Quality Control Procedures, Inspection and Test Plan and Method statements and perform site audits and provide inputs to KPI.

 Experience in reviewing Purchase requisition (PR), Purchase order (PO),ITPs,Test Procedures, Release note and review of MRB & IOM.

 Ability to provide leadership and assume overall responsibility for delivery of projects within required standards, quality, time and cost parameters.

 Experience in electrical control testing, commissioning and start-up with the ability to review/approve commissioning procedures and reports, coordinate the commissioning/startup schedule with the project schedule, oversee the testing and commissioning/startup.

 Inspection, Testing, Commissioning and start-up of various electrical equipment such as Gas Turbine Generators, Diesel Generators, Transformers, HV/LV switchgears, HV/LV cables, HV/LV motors, UPS, Batteries, industrial lighting, Electrical Heaters, Electrical heat tracing and Cathodic Protection.

 Possess excellent analytical and problem resolution skills.

 Experience in Power Management Systems (PMS), Power generation monitoring and control, Power distribution monitoring and control, Instrumentation system, ICSS (Process Control system, Emergency Control System, Fire & Gas System), Well head hydraulic control panel, PAGA, CCTV, Fiber optic and telecom system.

 Represents a fine blend of engineering and technology, with proficiency in Quality systems like IEC , IEEE, NEC, API, NEPA,NEC, NEMA, IP, CSA, UL, EN, HSE, OSHA, EEx, Norsok, ATEX/IECEx regulations etc.

 Worked with SAP, PCM-600, Maximo, Windows-XP, MS-Word, MS-Excel, Power point, MS-Paint, E-tap as core team member in Electrical & Instrument department.

 Proficient in PLC Programming, Electrical systems, pneumatics systems, AC/DC drives, field instrumentation.

 Strong fundamentals in the dynamic concepts of TPM, QC tools.

 Noted for delivery of output well ahead of timelines and within economy budgets.

 Well experience in manpower planning, lowering costs and breakdowns, enhancing productivity and in time project delivery.

 Good knowledge and experienced on selection, installation, commissioning and maintenance of hazardous area Ex equipment.

WORK EXPERIENCES:

AbuDhabi Gas Industries (GASCO):

Duration: 26th Feb, 2012 to till date

Responsibilities

• Presently working in NGL/AGR/SRU/GTG/Sulfur granulation plant as commissioning, Operation & maintenance supervispr Working representing the GASCO for Oil & Gas projects.(EPCs are ABB, JGC, Technimont & Hyundai).

• Managing Quality testing and installation works including commissioning with vendors like ABB on ECS/IPCS, Load management, Three Phase Principles/ Three Phase Power Measurement and Power Factor Correction/Three Phase Motor Principles Schematic diagram, magnetic bearing for Turbo expander, Maximo, PCM-600 SPF (Smart Plant Foundation) software etc.

• Analyses & diagnoses problems to determine the Root Cause & to recommend the solution and to verify the implementation effectively.

• Lead the Operation and Maintenance team for Preventive and Corrective maintenance for MV motors, transformers, equipment testing including cables test like partial discharge test, tan delta test etc.

• Controlling of Measuring & Testing equipment.

Responsibilities during Construction and Commissioning stage:

• Review contract documents to ensure identification and comprehension of quality requirements.

• Participate in internal & external audits and assessments.

• Supervise the contractor & Sub-contractor QC personnel.

• Implement Project inspection and test Plans, collate Inspection Results, coordinate field

• Witnessing the Inspection& Testing activities of EPCs and Third Party Inspection agencies.

• Identify specific requirements in the contract, which require to be addressed separately and need to be controlled through specific procedures. Prepare accordingly documents relevant to data control, inspection reporting procedure, technical queries and procedures for concessionary reports.

• Review Vendor & Contractors quality documents like ITP,Welding Procedures, on Destructive Testing Procedures, FAT procedures, SAT procedures and other testing procedures.

• Review of project quality control plan, ITP’s, QC procedures and method statements for conformance to specifications, codes and standards and ensure its implementation.

• Coordinate all inspection requirements for TPI inspectors.

• Witnessing the FAT to verify the product for compliance as per ITP and FAT procedure.

• Provide technical inputs for vendor queries, response the non-conformance reports for possible resolutions and analyze fitness to purpose.

• Provide necessary recommendations for company.

• Responsible for the identification, investigation and issuance of NCR to determine the root causes of non-conforming items & guide to initiative corrective actions.

• Verify, inspect and witness of all electrical equipment like transformers, HV&LV switchboards, control gears, HV/LV motors, bus-duct, UPS, distribution boards, DG sets, fire alarm systems, F&G systems, telecom systems, lighting, earthing, HVAC, F&G, MOV’s, heat tracing and cathodic protection.

• Coordinate all site inspections with the site contractors and work as lead E & I engineer.

• Provide general supervision and ensure all works are correctly prepared before any inspection.

• Perform system/area turnovers including verification of applicable as-built drawings and inspection records and system packages.

• Generate, monitor, control and closeout the punch list and exception list items.

• Ensure compliance with the site health and safety regulations.

• Inspection, Testing, Commissioning and start-up of various electrical equipment such as Gas Turbine Generators(40 MW GE Make 8nos.), 132 KV/33 KV GIS substation, Diesel Generators, Transformers, HV/LV switchgears, HV/LV cables, HV/LV motors, UPS, Batteries, industrial lighting, Electrical Heaters, Electrical heat tracing and Cathodic Protection.

Bureau VERITAS(Abu Dhabi):

Duration:-Feb 2011 to 9th Feb 2012.

Responsibilities

• Working as E&I Quality Engineer for ADMA, ADCO, NDC and Rig inspector for NDC Cyber rigs like ND-51 to 59. I.

• Involvement in Technical meetings, Industry standards, Technical Document review, ITP, FAT witness, Material, Plant equipment Inspection, Certification etc.

• Review the quality documents/test methods, processes and materials to determine effect on quality plans.

• Upon completion of inspection evaluate findings and issue recommendations detailing corrective actions. Document potential deficiencies on the quality improvements form and prepare for agreements in the Exit meetings.

• Identify audit scope and perform systematic and independent examinations of quality activities in compliance with the planned arrangements.

• Submit audit schedules for review to the quality manager and ensure all aspects of the quality system are audited at least once.

• In case of serious deficiency during the execution of a contract notify the project manager and initiate an unscheduled audit.

• Identify the audit team and obtain copies of relevant procedures, specifications and inspection test plans.

• Witness Factory acceptance test and inspection at vendor premises.

Zenith (Al-Qema Al Raida) Gen. Cont. Company, Al-Khober (KSA): –

Duration:-8th Feb 2010 to 13th Jan 2011

Responsibilities

I was working as a Lead Electrical/I Engineer on site Princes Noora Bint Abdul Raheman Women’s University project near Riyadh Air Port. Handle the all site for Electrical substation installation, MV switchgear, UPS, Transformer etc.

Red Sea Marine Services/ Bakari Navigation Co. Ltd. KSA: –

Duration:-26th June 2009 to 1st Jan 2010

Responsibilities

I was working with marine services company vessels/fleets using for the oil & chemical tankers as an Electrical/Electronics engineer on shore/offshore basis different ports in UAE & Saudi Arabia. Troubleshooting & maintenance in Engine room, Cargo control room, Bridge area all kinds of fault with BGORGE – Smart chief II – DCS/ SCADA & PLC systems, Generators, Boilers, control panel for process & engine room etc.

ARAMCO, (MAS-Contractor) Dhahran, KSA: – (Electrical Consultant)

Duration:-9th Jan 2007 to 15th April 2009

Responsibilities

• Working as Electrical pre-commissioning Engineer On site Aramco Project-Hiawatha Stabilizer Upgrade PS-3 Station near Riyadh. I have familiar with Aramco GI, SAIC & SATR, SAMSS, SATIP Documents.

• We installed new substation with 230/13.8 KV & 50 MVA 2 incomer transformer Hyundai make. In the switchyard we used SF6 pad mounted 230KV breakers 3 no’s for line A, line B & for bus coupler. Inside the substation 13.8 KV panel & other distribution panel Power Feeder Panel.MCC, DB etc.

• Installation of Overhead Compressor was in stabilizer area PS-3 station. Working with ABB team for commissioning the all Electrical project works. All kinds of commissioning tests was conducted with ABB team & other associated venders.

• In ARAMCO onshore & offshore field give the on job training & job task standard Evaluation for Rig Electricians.

• Preparation of training materials Subject CV, PowerPoint slides etc. for courses and give the practical training at rig site onshore & offshore, working as a Subject matter expert.

• Working on Ross Hill/IPS SCR, DC Motor, Top Drive, Mud Pumps, and Draw works Engine rooms/Generators etc.

• Planning of maintenance & material procurement for rig site, Alone handle the drilling rig operation & rig move process. I have done the troubleshooting & maintenance of all rig equipments.

• I have worked on Jack up Rig SAR-201 offshore & other Land Rigs SAR-101, SAR-102, SAR-103, SAR-151, SAR-152, SAR-153.

Shell Iran Offshore Ltd. (Soroosh and Nowrooz Integrated Development EPICM project):-

Duration:-4th April 2004 to 30th Aug 2006

Responsibilities

• Working as a Power Maintenance Technician (Authorized Electrical Person) with 28 days on/off rotation.

• I have worked with Shell Iran Offshore Ltd., at Soroosh / Nowroosh integrated oilfield of Iran. Our site Contains with many platforms like a SPP1 & SPP2 Production Platforms, SWP1 & SWP2 Wellhead Platforms, SLQ Accommodation Platform, Jack up Drilling/Production Rig.

• Joined as a part of commissioning and startup team. Active participant in doing PTP. Pre comm. Test procedures. & commissioning of the systems as per engineering standards.

• Studying all electrical drawings and checking for the integrity of the same or otherwise making the AS BUILTS on site and sending to vendor for approval.

• Worked with ALSTOM vendor as a part of team for commissioning Of 13.5 MW GT 35 dual fuel turbines.

• Knowledge of synchronizing HV turbine generator sets and running them in parallel with sharing load.

• Black starts Emergency generator 2H energy & Start up and commissioning.

• S & I MCC and MV. Panels loop checking and setting the protection parameters.

• Knowledge and understanding of setting up MICOM relay ALSTOM for feeder management, motor protection. Check the relay with current injection & voltage injection kit.

• Knowledge of Yokogava GS 3000 DCS. And loop checking for the same for alarm and start/stop sequence.

• Start up of ESP pumps (electrical submersible pumps used for pumping oil. Knowledge of keltronics and phoenix controls for the pump (REDA / SCHLUMBERGER).

• A chloride industrial system UPS trouble shooting and maintenance of the same.

• Working as active production team member for lifting wells and running chemical injection skid at remote platforms having knowledge of Oil well start up procedures.

• Knowledge of Power management systems, Managar management system (Mincom software) for material & maintenance.

• Expertise in HVAC controls, operation and maintenance of the same.

• SIEMENS. Daily Electrical Routine check. EDG, HVAC, Fire water Pump, UPS AC/DC, Switchgear rooms any relay Alarms.

• Planning for work permits & material requirement, PMR, Switching Programs.

• Routine, planned/unplanned, preventive maintenance, condition monitoring of plant with safety work permit system.

• Maintain daily logbook record and their faultfinding, investigation.

• Maintain safety lock boxes, Isolation/De-isolation, trip, alarm logbook.

Hyundai Heavy Ind. Ltd. Al-Shaeen field, Maersk Oil Qatar Offshore:-

Duration:-2nd June to 12th Oct 2003

Responsibilities

• Working as an Electrical & Instrument Engineer in Qatar Offshore on short term for Block-5 Development project contract.

• I was too lucky to work with Hyundai as E/I Engineer at offshore field. We were member of Installation & Commissioning team for Flare, Production, Water Injection, Gas Compression, Accommodation Platforms with different locations like A, B, C, D, E, F. My role was Installations & Comm. of HT Transformer, Switchgear rooms, Solar Turbines, HVAC system, lighting, all types of Valves & Transmitters, ESD, and F&G system.

Reliance Petroleum Ltd, Jamnagar India:-

Duration:-25th Aug 1999 to 29th March 203

Responsibilities

• Working as an Electrical Maintenance Engineer in Reliance Industries Refinery Division Jamnagar and plant was World Largest Delayed Coker & Gas Plant.

• Plant Installation and Commissioning of various types of LT and HT Motors, UPS, VSD, MCC, PCC, PMCC, D.G. sets, ELDB, LT&HT Switchgears.

• Routine, planned /unplanned ,preventive maintenance ,condition monitoring of Coker plant with safety work permit system maintain daily log book record and their fault finding, investigation and reporting to Maintenance Manager.

• Shutdown maintenance overhauling and testing activities of the Electrical equipments.

• Records updating and documentation.

• Looking after new modification projects if any.

• Independently handling all the electrical activities of the plant during shift/silent hours.

• Spares-parts procurement & stores up-keeping.

Equipment Handled at RIL-Coker Plant:

• Transformers – 33/11KV, 11/0.415 KV- Capacity- 31.5MVA/2MVA/1MVA

• Motors-H.T. Siemens, BHEL CGL Make. Largest of 3.8 MW rating. L.T. of various make.

• RELAYS-Siemens make micro-processor based relays like 7SJ600 (O/C & E/F), 7UT512 (Differential protection), 7SD511 (Current comparison), 7SJ551 (Motor protection), 6MB5250.

• P & B UK make microprocessor based relay like advanced feeder vision like AFV, FV, AMV, MV MREF relays.

• GEC make electromagnetic relays of various types.

• Xcell data concentrator for serial communication to each and every relays of motors and PCC, MCC I/Cs.

• ELDMS for assigning priority of load distribution and load monitoring energy metering of HT switchboard.

• Grab cranes 02 nos/24.5 tones capacity with static step less controls, VSDs, Slip ring motors of 300 HP, Laser operated distance detectors and related logic, EOT cranes of 5/10 tones.

• Rotork (U.K.) Make motor operated valves, Service Lifts, Coke Crushers (USA) Gundalch Make & PLC controlled coke loading, conveying System.

• DCS Systems, Process Interface Building (PIB), Interface Relay Logic system panels etc.

• Emergency D.G. set of 1500 KVA with AMF control panel.

Test Equipment Handled:

1. High voltages Insulation and Earth Loop Tester.

2. Oil BDV Test Kit.

3. Vibration and HT Line Tester.

4. Bearing Induction Heater and Laser Thermometer.

5. DC Earth leakage testing Equipment.

Oman National Dairy Products Co. Ltd. Oman:-

Duration:-2nd Feb 1998 to 30th June 1999

Responsibilities

Working as a maintenance Supervisor in Muscat Oman & job handled in maintenance of Tetrapak Machines like TBA-19, TBA-8, TBA-3 and Tetrapak Conveyer system, Accumulator multi-shrink wrapping machines, Tetrapak CIP Alcip-100 plant, Riv-5 ice cream, Polopak packing machines, Trepko Laban/yogurt filling machines, Whole milk UHT plant, Juice Plant, HTST plant, Utility and Refrigeration plant with SABORE make Ammonia compressor, Boilers, Cold stores, PLC control panels, Frequency converters, Pneumatic, Hydraulic, Steam operated equipments. Battery operated Electronic based Forklift maintenance. 3000 KVA D.G. set Plc controlled INK JET printing machines like SOLO-6/5, LUX made in U.K.

Worldwide Oilfield Machines India:-

Duration:-22nd Feb 1995 to 9th Jan 1998

Responsibilities

Working as a Maintenance Engineer in Pune & job involved in maintenance of conventional machines like Lathe, Boring, Drilling, Milling, and Sharpening. Then maintaining Fanuc controlled CNC machines like VMC, SL-7, MORI-SEIKI, NAKAMURA TOME 6T, 11T, MAZAK. Maintenance of Air compressor, forging hammers, Hydraulic pumps, Electrical Furnace, Maintain the power factor, Power consumption, Capacitor bank, maintenance stores, materials purchasing, etc.

Kenana Sugar Company Ltd. Sudan:-

Duration:-1st Aug 1994 to 21st Jan 1995

Responsibilities

Working as Maintenance Foreman in Khartoum Sudan for a seasonal short term Maintenance contract & Shutdown job involved in Sugar Refinery, Maintenance of Sugarcane crashing mill panels, Centrifugal section panels, Boilers, pumps, Sugar pans, Conveyer belts, HT/LT motors, HT/LT Breakers, Minimum oil circuit Breakers, Petbow make DC welding set, Boiler section panels, Power plant panels, Transformers etc. Company having its own Captive power plant capacity 160 Mw. Fuji makes Genset 04 Nos. made in Japan.

Qatar Liquidified Gas Company Ltd Qatar: –

Duration:-12th Oct 1993 to 21st April 1994

Responsibilities

Working as an Electrical Technician in Ras Lafan, Doha, Qatar for Short-term project job involved in installation of Gas compressor, HT & LT motors, and control panels, HT/LT, ACB/VCB breakers, VSD, UPS, Transformers etc.

Juma Al Majid Dubai: –

Duration:-2nd June 1992 to 12th Sept 1993

Responsibilities

Working as a Switchgear Foreman in Klockner-Moller Switchgear Department Dubai with hands on experience in switchgear control panel assembly, Wiring, Erection, and Servicing & Maintenance of the panels. We make all types of Chiller panels, pump panels, Industrial and Domestic panels, HT/LT, DB, SMDB, PCC, MCC, VSD panels etc. Our customers were Dubai Aluminum Company, Hotel Holiday Inn etc.

Soft-Ron Control System Thane, India:-

Duration:-8th Nov 1989 to 15th May 1992

Responsibilities

Working as an Electrical switchgear Engineer in Thane, Mumbai with Company was called “Siemens House of Atomization” We are made all types of control panels like Simovert PLC, VSD, MCC, PMCC, etc. We provide the panels for Steel Plant Tata Iron & Steel Company, Tatanagar, Mukand steel plant, Thane, Vishakhapatnam steel plant, Krupa chemicals Ltd. (Detergent plant) Pune, Indian Machine Tools Ltd. Nasik. Etc.

Mahindra Engineering and Chemical product Ltd. India:-

Duration:-1st Nov 1988 to 31st Oct 1989

Responsibilities

Working as a Trainee Engineer on Mahindra Owen Division Pimpri, Pune. Maintenance experience in preventive and Breakdown with all types of conventional machines like Press, Shearing, Bending, Welding, Milling, Spot welding, Drilling etc. Then Transformers, D.G. sets, EOT cranes, Air compressors, pump house, Portable equipments (Drill, Grinder). There was doing the Auto wiring of as a like Mahindra Tractor, Mahindra-maniuto Forklift, Air-India weight loader, Army Trailers etc.






popup-img