CV, QA and QC Manager seeking working in UAE, Oman ,Kuwait

Available
Serial No: 16928
Skills keywords: 

Short Bio:

I have the capability and experience with qualification to establish the QMS for any organization as per ISO requirements and contract requirements, and QA/QC involving of the all stages of the project starting Pre-FEED, FEED, Detail Engineering, Construction , Pre-Commissioning, Commissioning and Final Handover completion, for all type of projects either Limp sum or reimbursable , based on home office or site location.

Current location:  Doha, Qatar - View on map
Nationality: Syrian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: Arabic, english
Location I am interested in working: Anywhere

Qualification

B.S. Civil Engineer –Syria

Career Summary

Initiative, dedication, communication, teamwork, and flexibility.

18+ Years, widespread experience in engineering, procurement, construction and QA/QC.

Wide experience of home office to establish Quality Management System (QMS) and Integrated Management System (IMS) and involving of the Pre-FEED , FEED , Detail Engineering , Construction , Pre-Commissioning and Completion H/O project .

Prepare and perform the Quality Audit belong internal organization and external organization for all disciplines (Engineering, Procurement, Construction and Completion stage) as qualified Lead Auditor IRCA.

Particular skill for construction scope in the field of power plants, gas plants, pipe lines, gathering stations LNG plant, marine work and substations.

Scope includes, but not limited to, structural concrete and buildings, buildings’ finishing, earthworks and geotechnical analysis, asphalt and road works, static/rotating equipment erection and alignment, prefabrication/fabrication of piping systems, GRE piping, welding, painting, hot/cold thermal insulation of piping and equipment, hydro tests, pneumatic tests, non-destructive testing (NDT), structural steel erection and alignment.

Familiar with various codes of design and construction norms, such as, European norm, ACI, ASTM, AWS, API, ASME, etc. Trained in auditing systems as per the requirements of OHSAS 18001 & ISO 9001:2008. Proven track record of leading construction and quality teams towards the achievement of the ultimate goal of the project.

Chiyoda CTCI JV (CCJV)
Aug 2014- Present
Client: Qatar Gas (QG),

Employed as Site QA/ QC Manager for Lafan Refinery 2 Project (LR2) in Ras Lafan / Qatar, with Chiyoda CTCI Joint Venture.

Chiyoda Almana Engineering LLC (CAEL)
Feb 2013- Aug 2014
Client: Shell Qatar GTL.

Employed as QA/ QC Manager (and Deputy Corporate QA/QC Manager) for Shell Qatar project of GTL, Engineering, Procurement, Construction and management the project with main contractor Chiyoda AlMana Engineering LLC (CAEL) , based on Doha main office (and site).

Has wide experience for QA/QC activities belong all stages of the EPCM project, starting Pre-FEED, FEED, Detail Engineering, Construction and all activities related Procurement for several material and Equipment and all types of Vendors ,not limited to,

– Establish PQP for FEED, EPCm, as lump sum or reimbursable projects.

– Establish QPM and IMS for the project.

– Review the requirement for Material / Equipment and define the requirement for purchase material.

– TBE Technical Bid Evaluation for Vendor/ Subcontractor and tier of them.

– Manage the PIM (Pre-Inspection Meeting) and quality intervention inspection for any vendor for the procurement material and equipment.

– Follow-up with TPI for vendor shop inspection and insure implementing the quality requirements.

– Review and approve all Vendor Print (documentations) for the material vendor’s.

– Completion inspection and manage the final handover dossier (VQARB/MRB) for the vendor documentations.

– Manage the Subcontractor for quality requirement for PQP,QMS and IMS.

– Prepare and perform quality audit as required for the Vendor/Subcontractor for all stages of the project (FEED, Construction, and Commissioning).

– Manage the SQARB for the subcontractor.

– Build strong quality team.

Chiyoda Almana Engineering LLC (CAEL)
March 2011- Jan 2013
Client: Qatar Gas, QAFAC, QChem , Dolphin, QP.

Employed as QA/ QC Manager ( and Deputy Corporate QA/QC Manager) for Qatargas, QAFAC, QChem, Dolphin and QP Projects (Reimbursable Projects) EPCm (Engineering, Procurement, Construction and management), , with main contractor Chiyoda AlMana Engineering LLC (CAEL) , based on Doha main office.

Chiyoda/Technip Joint Venture (CTJV)
Aug 2010-Feb2011
QG 3&4-LNG On shore Facilities Project (QCS) Train 6 and 7.
Client: Qatar Gas (QG3&4)

Employed as Area QA/ QC Manager for QCS Project, with main contractor Chiyoda Technip Joint Venture (CTJV).

Chiyoda/Technip Joint Venture (CTJV)
June 2009-Jul2010
QG 3&4-LNG On shore Facilities Project (QCS) Train 6 and 7.
Client: Qatar Gas (QG3&4)

Employed as QA/QC Engineer for Technip scope of work, in charge for areas (Utility, Offsite, Offplot) for all disciplines, with main contractor Chiyoda Technip Joint Venture (CTJV).

Chiyoda/Technip Joint Venture (CTJV)
Dec 2005-May 2009
QG II-LNG On shore Facilities Project (QGX) Train 4 and 5.
Client: Qatar Gas (QGII).

Employed as area QA/QC Manager for Technip scope of work, in charge for areas (Utility, Offsite, Off plot, CLP phase 1, 4 and Process Train 5) with main contractor Chiyoda Technip Joint Venture (CTJV).

• Supervises the Disciplines QC inspectors (Civil, Steel Structural, Mechanical & Piping works) in there performance of inspections and testing activities.

• Responsible for monitoring, inspecting and ensuring construction is progressing as per schedule, Quality, and safety guidelines.

• In charge to supervises and monitor the performance of testing and inspection with different sub-contractors (related to QGX project) such as:

1. IHI co; Ltd for LNG Tanks, five LNG (9%Ni) tanks –capacity 140, 000 cu m LNG for each.

2. Belleli Energy S.p.A for atmospheric Storage Tanks, total no is 25 corrosive and non-corrosive service tanks.

3. Archirodon Construction (Overseas) Co.S.A. For Berth #4&5 Marine works.

4. CCIC main scope for QGX project in Utility, Offsite, Offplot and CLP areas.

• Reviews and Approves all inspections and test reports, and insure that the QC inspection work proceeds in accordance with Project Quality Plan, Quality Control Procedures approved by COMPANY.

• Reporting directly to Site Quality Control/Quality Assurance Manager.

• Has wide experience for QA/QC activities belong all stages of the EPCM project, starting Pre-FEED, FEED, Detail Engineering, Construction and all activities related Procurement for several material and Equipment and all types of Vendors ,not limited to,

– Establish PQP for FEED, EPCm, as lump sum or reimbursable projects.

– Establish QPM and IMS for the project.

– Review the requirement for Material / Equipment and define the requirement for purchase material.

– TBE Technical Bid Evaluation for Vendor/ Subcontractor and tier of them.

– Manage the PIM (Pre-Inspection Meeting) and quality intervention inspection for any vendor for the procurement material and equipment.

– Follow-up with TPI for vendor shop inspection and insure implementing the quality requirements.

– Review and approve all Vendor Print (documentations) for the material vendor’s.

– Completion inspection and manage the final handover dossier (VQARB/MRB) for the vendor documentations.

– Manage the Subcontractor for quality requirement for PQP,QMS and IMS.

– Prepare and perform quality audit as required for the Vendor/Subcontractor for all stages of the project (FEED, Construction, and Commissioning).

– Manage the SQARB for the subcontractor.

– Build strong quality team.

LEAD Contracting and Trading
Jun2004-Nov2005

1. Project: RAG & Flare Mitigation Integrated – Mesaieed, Qatar.

2. Client: Qatar Petroleum(QP)

3. EPC Contractor: Petrofac International Ltd.

4. Employed as QA/QC Manager ,with sub-contractor LEAD C&T, responsible to achievement the structural concrete and buildings, structural steel erectionand alignment ,static/rotating equipment erectionand alignment, prefabrication/fabrication of piping systems, GRE piping, welding, painting, hot/cold thermal insulation of piping and equipment, hydro tests, pneumatic tests, non-destructive testing (NDT) .

5. Establishing, Preparing & reviewing the project documentation as:

• Project Quality Plan.

• Inspection Test Plan (ITP) for all disciplines (especially for Civil Structure& Structural Steel works).

• Method Statement for Civil Structures work and Structural Steel, (assembling, erection, alignment& hand over to subsequent activity), painting, hot and cold insulation.

• Internal audit schedule.

LEAD Contracting and Trading Ma
y2003-Jun 2004

1. Project: Supply & Installation of Six Fifth-Frame Gas Turbine Generators – Derezzor, Syria.

2. Client: Al-Furat Petroleum Company (Shell-Syria).

3. EPC Contractor: Petrofac International Ltd.

4. Employed as Project QA/QC Manager, with sub –contractor LEAD C&T In Oil and Gas fields (Derezzor, Syria)

5. Responsible of implementation quality control procedures, supervision of construction work.

6. Establishing, Preparing & reviewing the project documentation as:

• Project Quality Plan.

• Inspection Test Plan (ITP)for all disciplines (specially for Civil Structure& Structural Steel works)

• Method Statement for Civil Structures work and Structural Steel, (assembling, erection, alignment& hand over to subsequent activity),.

• Internal audit schedule

• Welding procedures specification (WPS) for piping &structural steel works.

• P.Q.R procedure qualification record for the WPS,s.

Terra-Gunhan Co.
Jan2003- Mar2003

1. Geotechnical Engineering Contractors

2. Lattakia – Ariha Highway project (Syria).

3. Employee as Site Manager.

4. Geotechnical investigation layers of soil for Bridges foundations.

5. Drilling by the rigs to get soil samples till 40m depth (76mm diameter).

6. Initial evaluation of soil & applying the soil site tests required.

LEAD Contracting& Trading
May 2003- Dec 2003

1. Project: Provision of Additional Construction Resources – Derezzor, Syria.

2. Client: Al-Furat Petroleum (Shell-Syria).

3. Employed as Project QA/QC Manager, with sub –contractor LEAD C&T In Oil and Gas fields (Derezzor, Syria)

STORK Engineers & Contractor B
. Aug1999-Oct2002

1. Project: Service Engineering & Contracting – Derezzor, Syria. (Oil gas field).

2. Client: AFPC (Al-Furat Petroleum Company– Shell).

3. Employed as Civil, Structural Steel engineer & QA/QC Supervisor, with main contractor STORK Engineering& Contracting B.V. responsible mainly of the civil, structural steel engineering design, also for the pipe lines, live station modification engineering design.

4. STEEL STRUCTURE work:
[According Al-Furat Petroleum Company (AFPC, s) specifications]

• Checking the Issue for Comment drawings for steel structure facilities: pipe rack- pipe supports – compressor hall – cooler steel structure – steel skid.

• Prefabrication & Fabrication for above mentioned facilities.

• Assembling & Installation the steel structure facilities, and handover with full documents to the client.

• Visual check & NDT tests (if required) for the structural welding.

• Painting of the steel structure( sand blasting- layers of paint –thickness of paint …)

5. Responsible of all civil construction work & design proposal for (Flow line work& ESP (electrical submersible pump) work & Beam Pump works.

6. Supervision the Concrete work:

7. [According Al-Furat Petroleum Company (Shell) specifications, ASTM standards]

• Mix design for normal concrete & reinforcement concrete of (footing-beams – coulombs- slabs – retailing wall ….) .

• Cubic tests for all kinds of concrete in laboratory.

• Normal grouting & Epoxy grouting for pipe supports- pumps – compressors….

• Checking the normal formwork & plywood formwork.

8. Arrangement & preparation of Pre-Commissioning & Construction Packages.

9. Interpretation of RADIOGRAPHIC TEST for welds , According API & ANSI

10. Apply the HYDROTEST procedure according the piping schedules, and prepare handover package to the client.

11. Supervision & construction Flow line activities:
Surveying – routing – excavation – padding – stringing the pipes – welding the pipes (API standard) – RT for the welds – lowering in – cleaning the internal pipes –hydro test – backfilling – windrow.
[According Al-Furat Petroleum Company (AFPC, s) specifications, API standards]

LEAD Contracting& Trading
Jan 1998–Aug 1999

1. Project: Tartous Vegetable Oil Refinery Factory – Tartous, Syria

2. Position: Deputy Site Manager

3. Location :TARTUS – Syria

4. Design Company: DeSmit

5. With Main Contractor LEAD C&T

6. Employed as: Civil, Structural Steel Supervisor – Deputy Site Manager.

• Construction Steel Installation Work for main building of factory(Treatment Building) , height this building is 14m the area is 450m square , foundations and slabs and ground beams are reinforcement concrete with Anchor Bolts, wall & the roof are double steel sheets with insulation , also there are five slabs downstream the building height for the vessels & tanks & piping and for the control.

• Construction Structural Steel Installation Work for Two Stores (each one is 3000m square) with three cooling halls. The foundations and slabs are reinforcement concrete, the half of wall height is hollow concrete blocks, the remain height and roof are double steel sheets with insulation.

 

• Construction the concrete work/ mass concrete – normal concrete – reinforcement concrete – normal grout – epoxy grout / Qty of concrete for this project is 8000m cubic. Follow up cubic tests of concrete in the Lab.

• Earth work: excavation & backfilling for leveling – foundations – roads – drain system – potable & sewage system.

• Construction the road work, apply the procedure of basic layers (height, soil kind) and Asphalt layer & the procedure of backfilling, compacting for layers.

• Construction the potable & sewage system of all building drain system for the yards with slop.

• Prefabrication & fabrication the steel pipe rack and pipe supports of all kinds of piping between the buildings of factory and oil tanks.

• Heat insulation work (special material with steel cover sheets) of oil tanks / 6 tank, 13m height each one /.

LEAD Contracting& Trading
Oct 1997–Jan 1998

1. Project: Norm Decontamination Facility – Derezzor, Syria

2. Client : AFPC (Al-Furat Petroleum Company–Shell)

3. Main EPC Contractor: AEA.

4. Position: Leader Civil& Structural Steel, Construction and QA/QC team

5. Norm Decontamination Facility Project

6. Dier Ezzor – Syria

7. Client AFPC (Al-Furat Petroleum Company)-(Shell Syria)

8. Employed With Sub-Contractor LEAD C&T.

9. Employee as Civil Engineer: Responsible of civil construction &supervision work (Concrete, Earth & Roads works …) , Design proposal if required . Construction of Steel installation & Erection of structural steel.

[According Al-Furat Petroleum Company (AFPC, s) specifications]

• Construction the concrete work/ mass concrete – normal concrete – reinforcement concrete – normal grout – epoxy grout

• Follow up cubic tests of concrete in the Lab.

• Earth work: excavation & backfilling for leveling – foundations – roads – drain system – potable & sewage system.

• Construction the road work, apply the procedure of basic layers (height, soil kind) and Asphalt layer & the procedure of backfilling, compacting for layers.

• Construction the potable & sewage system of all building drain system for the yards with slop.

LEAD Contracting and Trading
Jan 1997–Oct 1997

1. Project: Water Injection – Omar Phase 4 – Derezzor, Syria

2. Client AFPC (Al-Furat Petroleum Company– Shell)

3. EPC Contractor: Petrofac International Ltd.

4. Position: Leader Civil& Structural Steel, Construction and QA/QC team

5. Employee as Civil Engineer / Responsible of civil construction work with LEAD (Concrete, Earth & Roads Works) / Arrange Design proposal.

6. Construction of Structural steel installation work (halls , stores )

[According Al-Furat Petroleum Company (AFPC, s) specifications]

• Construction the concrete work/ mass concrete – normal concrete – reinforcement concrete – normal grout – epoxy grout

• Follow up cubic tests of concrete in the Lab.

• Earth work: excavation & backfilling for leveling – foundations – roads – drain system – potable & sewage system.

• Construction the potable & sewage system of all building, drain system for the yards with slop.

LEAD Contracting and Trading
Jan 1996–Dec 1996

1. Project: Omar Power Plant Upgrade – Derezzor, Syria

2. Client AFPC (Al-Furat Petroleum – Shell).

3. Main EPC Contractor: TPL spa.

4. Position: Civil Site Engineer & Construction supervisor, with LEAD.

5. Employee as Civil Engineer / Responsible Concrete work & Earthwork & Roads Steel Installation (store, hall) & Painting, Insulation work.

6. Arrange Design proposal.

7. [According Al-Furat Petroleum Company (AFPC, s) specifications]

8. Evaluate &Study any design change for civil, Structural steel works, in situ during the construction activities.

Directorate Technical Services
Jan 1992–Dec 1995

1. Project: School Building – Lattakia, Syria

2. Position: Civil Engineer

• Responsible of Engineering, Construction Supervision of schools building.

 






popup-img