Core responsibility - Mechanical Maintenance in charge of 5800MT per day Cement Plant.
Responsibility
Preparation of Project Profile
Preparation of Tender Documents
To Make all schedule for procurement.
Inventory Management.
Monitor the ERP.
Spare parts budgeting & evaluate the cost center & expenses.
Evaluate the raw material inventory & forecast the 3 month plan for Raw material consumption. Evaluate the price guide line to Purchase Raw materials & spare parts which with considering all standard data of freight & inflation& give report to management for 3 month projection ( specially Foreign Purchase)
Preparation of CPM, Bar Chart and monthly Progress Report.
Evaluation of the tender & awarded the contract to the competent tendered.
Supervision of Erection & Installation of machinery. Implement the work as per Specifications, Drawing & Design.
Monitoring the total construction work as a Team Leader.
To provide technical support to the erection team.
General Maintenance as well as schedule & preventive.
Make target of minimum breakdown & maximum out put.
Plant reliability & ensure the smooth production
Employer - Heidelberg Cement Bangladesh Ltd
Position - Project Leader
28th October 2007 to 8th March 2008
Project - Fly Ash Unloading System through dense phase conveying System. Capacity: 30MT/Hr.
Warehouse of 3000MT Capacity for fly ash.
Extension of Packing Area.
Responsibility
Preparation of Project Profile
Preparation of Tender Documents
Evaluation of the tender & awarded the contract to the competent tendered.
Preparation of CPM, Bar Chart and monthly Progress Report.
Coordinate with China Heavy Machinery Corporation regarding design & drawing as per process design.
Supervision of Erection & Installation of all machinery
Implement the work as per Specifications, Drawing & Design.
Monitoring the total construction work as a Team Leader.
To provide technical support to the erection team.
Employer - Heidelberg Cement Bangladesh Ltd
Position - Mechanical Manager
7th April 2004 to 8th April,2008
Responsibility
Prepare the maintenance schedule.
Plant reliability& ensure availability of all plant machinery & auxiliary/ancillary equipment at all time require for smooth manufacturing operation in order to achieve set production target.
Specialist input of plant modification & improved operating efficiency.
Maintenance cost reduction.
Break down elimination& down time reduction.
Maintaining of spares & administration of Technical stores for mechanical spare parts.
Arranging plant inspection & maintenance of records including reporting/feedback on prevailing (If any) substandard condition of operation, Machine, Maintenance etc.
Arranging/organizing training of Operators to improve Technical skill.
I have completed the installation of a hot gas project to improve the quality of cement and increase production through put.
Implemented a maintenance programmed to upgrade the existing jetty equipment to ensure safe and efficient berthing of coaster vessels.
Designed and successfully tested a trial fly ash transport system. This would reduce the handling and product loss during the feeding of the mill.
Designed and supervised the installation of a cement storage go down. This has improved the quality of stored cement delivered to customers
Have reduced the unscheduled stoppage from 15% to less than 1% through the implementation of proper routine inspection and predictive maintenance.
Maintenance Programme:
Introduced the Master schedule, Daily Work Schedule, Monthly inspection check list, Lubrication schedule, Maintenance Key Performance Index, Machine History Card, Inspection Check List. Etc. Through this the unscheduled maintenance has been reduced by more than 5%. Currently the average unscheduled stoppage is less than 1% from a high of 15%.
2006 Break Down of Mechanical:3.73%
2007 Break down of Mechanical: Average 4%( Due to unavailability of spare Parts)
Budget:
The forecasted prepared in 2005 ,2006,2007,2008 Budget by myself, for the Mechanical department is well under control. This good control of the budget was due to the fact that proper maintenance planning was introduced to this plant by me. Due the low unscheduled stoppage it is very possible to ensure that budgets forecasted are properly adhered to.
Spare Parts Control:
For 2005 per ton expenditure was 37.26BDT
For 2006 up to Dec: 12.73BDT
For 2007 up to Dec: 8.75BDT
I am constantly looking at way to improve on the current situation in order to achieve “Zero” breakdown.
Currently, I have been appointed to be the Key Person for the maintenance of spare parts inventory for the maintenance department in our new Enterprise Resource Planning system.
I am also part of the plant purchasing committee to ensure that good quality and competitive priced spare parts are sourced and purchased for the plants.
Employer - Seven Circle Bangladesh Ltd
13th June,2001 to April 2004
Position - Plant Engineer
Responsibility
Planned maintenance, preparation& execution of maintenance schedule for all plant machinery in consultation with respective sectional head.
Plant reliability& ensure availability of all plant machineries & auxiliary/ancillary equipment at all time require for smooth manufacturing operation in order to achieve set production target.
Specialist input of plant modification & improved operating efficiency.
Maintenance cost reduction.
Maintaining of spares & administration of Technical stores for mechanical spare parts.
Organizing archive for all design &* as built drawings, Manuals, Specification etc and administration of that.
Break down elimination& down time reduction.
Arranging plant inspection & maintenance of records including reporting/feedback on prevailing ( If any) substandard condition of operation, Machine, Maintenance etc.
Arranging/organizing training of Operators to improve Technical skill.
Work shop Management-Design & fabrication of spares in house especially of non standard items including providing support to production for emergency Repairs.
Proving /Ensure support for shift maintenance on as & when Require.
Conducting system study using appropriate tools/technique for need assessment for balancing, decongestion/planned modification/maintenance work.
Project administration& arranging 3P support for meeting emergency plant maintenance requirement including procurement & supervision.
Implementation of autonomous maintenance & TPM
Liaison with
Materials, Process& Packing Engineer for production related issues.
Electrical & Automation Engineer on Electrical &Automation Related Issues.
Commercial Department for commercial control
Chemist for Quality control& process related issues.
Target
Minimum 200000bags@ 50kg of cement per week & n10000MT of bulk cement per week& ensuring g minimum 10000MT of Clinker Discharge as applicable.
Ensuring 136 hrs reliability hours of operation of all sections on Weekly Basis.
Quantitive Target on Utility consumption, Maintenance expenditure and down time.
Project - Seven Circle Cement mills,capicity-2000MT/Day
Mill Sizes 3x11 Two No, Manufacture By Shanyan China
Packing Machine from Hever & Boecker No Of Spout 8
Responsibility
Preparation of Project Profile
Preparation of Tender Documents
Evaluation of the tender & awarded the contract to the competent tendered.
Preparation of CPM, Bar Chart and monthly Progress Report.
Coordinate with CNCEC & Benxi erection company, related issue of design & drawing as per process.
Supervision of Erection & Installation of all machinery
Implement the work as per Specifications, Drawing & Design.
Monitoring the total construction work as a Team Leader.
To provide technical support to the erection team.
Before you fill out our registration form, we feel it necessary to pass on some important information.
After completing our registration process your details are checked over by our Validation Team. Their task is to upload suitable submissions or delete.
Registrations that pass validation automatically produce an online CV Profile. Due to the popularity of our website profiles are widely seen by prospective employers. On a daily basis we receive many Profile enquiries.
By following our guidelines your profile will pass our validation process.
Key points to note
Use a descriptive title
If possible, upload a suitable portrait image
Fully showcase your skills, talent and qualifications
Avoid duplicate content (copying and pasting directly from Linkedin)
Make sure your submission is accurate (spelling and grammar)
Upload a compelling CV/Resume that fully showcases your ability
Select accurate keywords, these are linked to our automated matching system
Your aim should be to produce a fantastic online CV Profile.