Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

Project Coordinator/Supervisor

I am currently available for work
Serial No: 91603
(06/30/1974, male)
List top 5 skills: Electrical engineer,, electrical maintenance, project coordination
List Of Qualifications:

In Education:
1). M. Sc Engineering (Electric Power Engineering), Chalmers Technical University (Swedish MKP full time Scholarship winner for session 2006-2008), Gotenborg, Sweden.

1_a). Research Work: "Comparing and Evaluating Frequency Response characteristics of Conventional Power Plant with Wind Power Plant" Place: M. Sc Engineering (Electric Power), Chalmers Technical University, Gothenburg, Sweden.

2). B. Sc. Engineering (Electrical & Electronic), Chittagong University of Engineering & Technology (former BIT, Chittagong, Bangladesh).

Previous Employment Details:

Projects work: Design & Drawing review, Projects work monitoring, daily report, pending work
preparation, prepare of BOQ, materials purchase report and can handle medium scale EPC project.
Profile: linkedin.com/in/mohammad-bhuiyan-1527271a
Employer : “SL group, Madam bibir Hat, Sitakund, Chittagong.
Position (Full time) : Project Coordinator
Duration : 01st September’ 2016 to Present date
Responsibilities : Full Project Execution: Planning, Design with Foreign
Consultant, Civil work, 33KV/11KV Substation setup Machinery
Import, Local Fabrication, Installation, Testing, Commissioning
& Commercial Production.
Project Name: 400 MT per day capacity TMT re-bar Production Plant (rerolling Mills)
Size of TMT Re-bar: 8 mm to 32 mm
Raw Material: MS bar- 4” x 4” x 3 m & Scrap ship yard Plate: 40mm x 16mm x 2m
Production period: 16 hrs. per day.

Employer : “Universal Refinery Ltd.”, Kumira, Sitakund, Chittagong-4314,
Bangladesh
Position (Full time) : Manager (Electrical & Maintenance)
Duration : 01st January’ 2014 to August’2016
Responsibilities : Electrical & Maintenance work (Electro-mechanical) of 150 MT
Capacity Condensate Fractionation plant.
 Supervise 11/0.4 KV Sub Station Erection Works (X-er – 1000 KVA, VCB, HT, LT, Changeover,
PFI), Earthing system and installation & Supervise the fabrication work of MCC Panel (Local &
Remote control) and own power generation (500 KVA two DG set). Design distribution network
from MCC to various Electrical Load. And periodic maintenance of electrical related appliances.
Supervise the work of laying of cable system (HT & LT) as well as control cabling system for
Instrumentation work (PLC) for Feed & Product delivery pump house and lighting system for
plant by maintaining Safety code (IP-65, ATEX standardsEx.).
 Supervise and maintenance of Fire fighting system (Water & Foam) and follow periodic startup
 Logistic support to production Engineer/ Subordinate (daily routine meeting) as well as
Implementation of various operational work.
 Maintenance and Supervision of all types of Electro-mechanical work (Thermo-fluid Heater, Re-
Boiler, Fractional Column, Heat exchanger, pump system).
 Support the Trial work to Indian Consultant and monitoring various operational work like, N2
Plant, Heater, Cooling system, piping network, emergency alarm systems/siren.
CURRICULUM VITAE

Employer : “Lark Petroleum Company Ltd.”, South Sonaichari, Sitakund,
Chittagong. Bangladesh.
Position (Full time) : Project Manager
Duration : 11th August’2011 to 30th December’2013
Responsibilities : Project Implementation work of 130 MT Capacity Condensate
Fractionation plant.
 Review the Drawing, check of Estimation of the Tender offer and coordination to Contractor/Subcontractor.
 Logistic support to the Contractor & Daily routine meeting with Engineer/ Subordinate as well as
Implementation of various operations through control, coordination, direction, management and
communication of the entire process.
 Monitoring and Supervision of all types of Electro-mechanical work (Thermo-fluid Heater, Re-
Boiler, Stripper Ballon, Fractional Column, Aero-condenser, Degasser, Heat exchanger).
 Supervise the fabrication work of Feed Tank, Product storage Tank (SBP, MS, MTT, HSD) with
Scale fixing, Floating Roof, Sample collection system, Breather, Drain line, Manhole, Painting
etc.
 Supervise the fabrication & installation work of Foam Producer Tank & water spray system for
fire extinguisher & setup Cooling Tower.
 Supervise the work of laying of cable system (HT & LT) as well as control cabling system for
Instrumentation work and for Feed & Product delivery pump house and Street lighting of plant.
 Supervise 11/0.4 KV Sub Station Erection Works (X-er – 1000 KVA, VCB, HT, LT, Changeover,
PFI), Earthing (Mesh and boring) system and installation & Supervise the fabrication work of
MCC Panel (Local & Remote control).

Employer : ”United Power Generation & Distribution Company Ltd.” United
center, House-NW (J),-6, Road-51, Gulshan-2, Dhaka 1212.
www.united.com.bd
Position (Full time) : Senior Project Engineer - Electrical
Duration : 18th April 2011 to 10th August’2011
Responsibilities : Supervision of Installation and Erection, commissioning and
operational work of 56 MW power plant – Gas Engine.
 Logistic & Technical support to the Contractor/Sub-contractor and Daily routine meeting with
Engineer/Subordinate.
 Drawing Review, check of Estimation of the Tender offer, BOQ and coordination to Contractor/Subcontractor.
 Supervise the work of laying of cable system (LT and HT)
 Earthing (Mesh and boring) system of substation and Engine Hall individually.
 Monitoring & Supervise 11/230 KV Sub Station Erection Works (X-er - 70 MVA/80 MVA (tap
changing), CB, CT, IVT, DS, LA)
 Installation and supervision work of the control room (MV Panel, LV Panel, MCC panel, Generator to
feeder to X-er control panel, NGR unit, Utilities panel)
 Monitoring & Supervising work of 230 KV Transmission Tower (34 meter height and double circuit) to
national grid

Employer : Bakhrabad Gas Systems Limited (A Company of Petrobangla, under
Energy Ministry, Bangladesh Government), Head Office, P.O. Box No.
- 97, Dist. - Comilla, Bangladesh.
Position (Full time) : Senior Maintenance Engineer-Electrical & Shift In-Charge.
Duration : 9th July 2000 to 30th July’ 2006.
Responsibilities : As a Shift In-charge (Production Operator) at Control room - 02 yrs 6
months, & Maintenance Engineer (Electrical) - more than 3yrs
a. As a Shift In-charge (at control room in Production Dept. since Nov.’2003 to July 2006):
 Monitoring & maintaining the operational work of load dispatch for bulk (i.e. Thermal Power Plant,
Fertilizer Company & Paper Mill Industry) & commercial consumers at Peak & off Peak period.
 Making Report of Gas consumption (Peak & off Peak) in Daily/Monthly basis, data sheets and process
optimization planning (shutdown and running the process line).
 Process control of the existing production line & report on development.
 Making monthly roster/shift schedule of the personnel (assistant operators of control room).
 Team/Group work & coordination maintaining with Staff.
b. As a Maintenance Engineer - Electrical (since July’2000 to October’2003):
 Maintenance of Sophisticated Electro-Pneumatic instruments (i.e. Emergency Shutdown Valve (ESDV),
EVV (Emergency Vent Valve) & Pressure Control Valve (PCV)) & Inlet Separator, Outlet Separator,
Condensate Storage Tank, and ancillary devices are Air Compressor, Water Bath Heater/Boiler and its
routine maintenance, and Flash Drum/Knockout drum of 350 Million SCFD Capacity Gas Processing/
Regulating station.
 Maintenance of 750 KVA Electrical Sub-station & Electric Distribution Line of Plant and routine
maintenance work of 200 KVA Diesel & 250 KVA Gas Generator.
 Installation/replacement of new Electro-mechanical instruments & preserves a logbook.
 Calibration of Metering Systems of different Production & Transmission companies (i.e. - Sangu Gas
Field, Chittagong, Cairn Energy PLC, Shell & Unocal Bangladesh Ltd.) and installation of
sophisticated Electro-Pneumatic instruments like various type of Regulators, Transmitters (P, DP & T),
Controllers, Recorders and Flow Computer etc.
 Monitoring the operational work of “On Stream Pigging Operation” of high pressure Gas transmission
pipe line (National Grid Line: Line Pressure=60 bar, Dia=24″, Length=170 km).
 To prepare spare parts list details in Electrical & Electromechanical equipments.

Current location: Bangladesh - View on map
Nationality: Bangladeshi
Preferred Sector of Employment:  Engineering, Oil, Gas and Energy, General Management
Spoken languages: Bengali, english, Hindi
In what location are you searching for employment: Anywhere
List the countires you have a visa to work in: Bangladesh, Netherlands, Norway, spain, Sweden, switzerland, United Arab Emirates, United Kingdom, United States





Job Seeker Profile Showcase