Offshore/Onshore Pipe Stress Engineer

Available
Serial No: 4363
Skills keywords: 
Current location:  Balochistan, Pakistan - View on map
Preferred Sector of Employment:  accounting and finance

TOPAZ ENGINEERING -  May- 2011-TO Oct. 2012

SENIOR PIPING ENGINEER, Abu-Dhabi, UAE

Highlights:

  1. GPS Petroleum Storage Terminal EPC Project, Fujairah, UAE.
  2. Oil Terminal # 1 Top Side Loading Facilities EPC Project, Fujairah, for Port of Fujairah UAE.
  3. Socar Aurora piping connecting to the OT2 terminal for Port of Fujairah, UAE.
  4. Bid support for various bids for Oil & Gas projects.
  5. Mitigation of design faults and flange leakage in Port of Fujairah Terminal. Coordination with the design appraisal firm for design acceptance.
  6. Studied an offshore Revamp platform from the stress analysis point of view.
DESCON INTEGERATED PROJECTS LTD. - 2010 TO- 2011

LEAD PIPING STRESS ANALYST, LAHORE, PAKISTAN

Highlights:
  1. Lead Stress Analyst.
  2. Bulk Liquid Chemical Terminal project located at Jubail Commercial Port, Saudi Arabia. Main equipment included Storage Tanks, API-610, 676 & ASME B73.1M pumps.
  3. Developed evaluation procedures for API 676 / ASME-B73.1M pumps. Calculations of Impact load arising from the flow of high pressure pig / slug forces at bends and its modelling and analysis.
  4. New Ammonia Storage Tank Project for Pakarab Fertilizers Ltd. Pakistan. The project consisted of piping connected to API-650 based Double walled Storage tank. Tank manufacturer was MARALDI Bertinoro S.p.A, Italy. The FEED work was handled by me.
  5. Many proposal jobs for MH estimation and project scheduling.
  6. Engineering Manager for OMV Wellhead project.
JGC-DESCON ENGINEERING - 2008 TO 2010

SENIOR PIPING STRESS ANALYST, LAHORE, PAKISTAN

Highlights:
  1. FERTIL Urea De-bottle necking project for FERTIL Abu-Dhabi. I handled the Granulation area of the project which consisted of the piping connected to Turbine, Towers, and Plate type heat exchangers.
  2. CO2 Recovery Plant Project for Engro Chemicals Pakistan Limited. Main equipment included Towers, Heat Exchangers, Centrifugal Pumps & storage Tanks.
  3. MANIFA Crude Processing Facilities 900MBCD MANIFA, SAUDI ARABIA. Main equipment consisted of Tanks and Centrifugal Pumps.
  4. Stress Analysis for Piping connected to the steam turbine for Fatima Fertilizers, Pakistan
NDC – Pakistan - 2006 TO 2008

GENERAL MANAGER, ISLAMABAD, PAKISTAN

JGC-DESCON ENGINEERING, PAKISTAN - 2000  TO 2006

PIPING STRESS ANALYST, LAHORE, PAKISTAN

Highlights:
  1. Stress analyses for two wellhead projects.
  2. Bid preparation for wellhead projects in Pakistan.
  3. 6 months training in piping layouts, JGC’s standards & Caesar II.
  4. 03 months training in PDS by Intergraph middle east LLC.
  5. 01 month training in PDS at JGC, YOKOHAMA Japan.
DESCON ENGINEERING, PAKISTAN - 1998 TO 2000

SENIOR CAD / CAE ANALYST, LAHORE, PAKISTAN

Highlights:
  1. Team lead for Company’s transition from simple CAD to 3D-CAD (PDS).
  2. Organised & delivered many training to Engineers & draughts men in PDS (Plant design Systems).
  3. Developed many systems for automating piping design & engineering activities for Piping Material Specifications preparation, Dia Inch / Length Calculations, Painting & Insulation MTO generation and many others.
POLLUTION ENGINEERING - 1996 TO 1998

MECHANICAL ENGINEER, KUALA LUMPUR, MALAYSIA

Highlights: Design of waste water treatment equipment.

HEAVY MECHANICAL COMPLEX. PAKISTAN – 1990 TO 1996

DESIGN ENGINEER, TAXILA, PAKISTAN

Highlights:
  1. The design of Vacuum Pans for sugar producing company.
  2. Received multiple trainings in design and various manufacturing processes including fabrication, machining, forging and fitting.
COMMUNICATIONS & WORKS – 1989 TO 1990

MECHANICAL ENGINEER, KOHAT, PAKISTAN

Highlights: Maintenance & operation of earth moving machinery.

MUC OIL & Gas Consultancy (MUCOG) -  Nov- 2012-TO TILL NOW

ENGINEERING & TECHNICAL MANAGER, Sharjah, UAE.

MUCOG is a consultancy firm providing services related to to FEED, PMC and tender administration.

Highlights:
  1. To manage & coordinate the day to day activities.
  2. Staff management / control.
  3. Standardization for quality control / improvements and its implementation.
  4. Site Support.
  5. Develop MIS for targets, their control & analysis.
ENGINEERING SYSTEMS DEVELOPMENT & STANDARDIZATION:

I have developed many software based systems with the aim of Standardization, elimination of duplication of efforts & errors and man-hours reduction. These include the following categories:

Pipe Stress Analysis Related:

Nozzle Evaluation, Flange Checks as per ASME section 8 Division 1 Appendix 2, Pipe Wall Thickness Calculations for Various codes, Critical Lines Selection, Stress Specifications preparation, compilation of sliding plate quantities and Spring Supports for the whole project based on Caesar II reports, nozzle displacements calculation including Towers, Tanks, AFC, API based Pumps, Spring Supports Data-Sheets, PSV Reaction Force Calculations.

General Piping Related:

Piping Material coding System, Materials Specifications Preparation, MTO reports generation, Anchor Force Calculations, Inch Dia / Length Calculation.

Management Related:

Performance appraisal system.

Spoken languages: english, Urdu
Location I am interested in working: Anywhere





popup-img