Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

Experienced Senior Electrical Engineer, Egypt

I am currently available for work
Serial No: 3682
(10/08/1949, male)
List top 5 skills: 
Short Bio:

Project Manger responsible for the complete installation & construction of various installations

SARL SPFMEE   For  Ansaldo Enegia - March  2009  Till  August 2012


PROJECT  -  OMP53 - Gas Compression Station at Hassi Massoud - Algiers.  Client Bentini. 

In the period between February and August 2012.

Position held Project Manager   responsible for the complete installation & construction for the following:

  • Electrical and Instrumentation Control Panel
  • M.T & L.T  System .
  • Main / Submain Breakers and distribution panels , MCC, TGBT and FEEDERS  panels
  • Complete electrical works for power and lighting System.
  • All Cable trays for the complete System
  • Earthing System  , MV/ LV  Power transformer
  • Outdoor  Lighting System   ( Street Lighting System ) .
  • Lighting and Power System in Ex. Zone area.
  • All Installation works related to the Instrumentation and Equipment System.
  • Fire Fighting System.
PROJECT - CENTRALE   TURBINE A GAZ DE LARBAA de 4X139, 9 MW - ALGIERS.   

Position held - Electrical Commissioning Supervisors responsible for:

Testing and commissioning of the boards including the primary injection and the protection system of  MV  ( 6 kV )   of the following Switch boards :
  • Common Room  Switch boards ( Total No. of the Panels 15 ).
  • Unit 1 Switch boards (Total No. of the Panels  9)
  • Unit 2 Switch boards (Total No. of the Panels  9)
  • Unit 3 Switch boards (Total No. of the Panels  9)
  • Unit 4 Switch boards (Total No. of the Panels  9)
Testing and commissioning of 6 kV Motors of the following :
  • Fuel Pumps .
  • Fire fighting Pumps .
Testing of 6 kV Power cables of the Station .

Testing and commissioning of the following Switch boards :
  • Common Room  380 V Switch boards .
  • Unit 1. Unit 2 , Unit 3 and Unit 4,  Main Switch boards  380 V.
Testing and commissioning of the following Power Transformers :
  • Common   Aux. Power Transformers 6/0.4 kV ( 2x2MVA ).
  • Unit 1, Unit 2 , Unit 3 and Unit 4    Aux.  Power Transformers ( 1x3 MVA   6/1.15/1.15 kV  , 1x2 MVA 6/0.4 and 1x 1.15 MVA 6/0.47  kV).
Responsible for the operation and trouble shooting of all  MV and LV  electrical system of the Power station.

ABB  Process Solution & Services ( Italy Milano ) - March 2006 - December 2008 . Oil and Gas industries.

Project 1.  Gaz  Compression Station TFT  - Algiers. 

Position held - Senior Engineer .

Duties:
  • Coordinating and reporting to the commissioning Manager
  • Responsible for commissioning and start-up of 2 Turbo Alternators 3 MW each.
  • Responsible for commissioning of 2 Motors Control Centers  of   Turbo  Compressors 145000 M cube/hours each.
  • Commissioning of all ancillary equipments such as Fire protection system , Air -Cooling  System, Air conditioning system, Standby generator ( 750 KVA ) and oil-water separators d UPS , Battery and battery charging system and over-head cranes
  • Leading commissioning team for different activities.
  • Coordinating with the specialists of electrical engineers and drafting design team.
  • Modifications of electrical design in area of controls, protection and electrical circuits when required.
  • MV 5.5 kV Switchgears and Power cables.
Project   2 . Oil Pumping Station – Algiers.

Position held - Electrical Supervisors responsible for the installation.
  • Fire protection system equipment and all detection system.
  • 5.5 kV M.Voltage Switchboards.
  • Operation panel for Turbo Alternators 3 MW Solar equipment ( 2 units )
  • Operation panels for Turbo Pumps  ( 3 Units )
  • All electrical lighting and power system of the project.
  • All Electrical installation of Air compressors System.
  • All electrical cables laying of about 100 kM of cables ( Power and Control Cables)
  • All Electrical Switch boards such as ,UPS , Battery Chargers , General Services , HVAC system, lighting and power system , Skid gas switchboards, and Interface panels.
  • Low Voltage main distribution board 4000 A ( Two incomers from 2.5 MVA transformers and Bus coupler ).
  • Two Power Transformers 2.5 MVA each.
  • All MV cabling system and terminations.
  • All electrical works for the main Turbo Alternators ( 2 Units 3MVA each) Solar units
  • All electrical works for the main Turbo Pumps ( 3 Units T60 ) Solar units
  • All the control and interface units
  • Termination of Power and control cables of the project.
EFACEC   Sistemes de Electronica - (Portugal) - January 2000 - January 2006  

Project - BCC Algiers (Energy Management and SCADA System for Distribution networks)

Position held - Senior Engineer. 

Duties:
  • Supervising of different Subcontractors for construction of Three Control Centres, East West and Central of Algiers.
  • Responsible for installation of electrical works related to the Control Centres.
  • Installation of equipment , Switch Boards , Control Panels , UPS’s and Front End ,Watch dog Panels.
  • All Telecommunications equipment for the three Control Centres.
  • Regular technical meeting with the client (Sonelgaz) .
Enemalta Corporation - 1989 - 1999

Enemalta Corporation is responsible for Generation and distribution of electrical energy in Malta.

Position held - Senior Engineer.

Duties:
  • Responsible for the new installation and commissioning including the protection system of MV/LV substations as well as HV/MV   distribution networks  in Malta.
  • Responsible for maintenance and refurbishment of MV/MV/LV substations of Malta.
  • Installation and testing of MV Power Cables.
  • Installation and commissioning including the protection system of power transformers up to 20,30 50 and 90 MVA
  • Protection systems in general.
  • Installations and commissioning of switchgears 132 kV , 33kV and 11 kV ( GIS and air insulated  )
  • Terminations and joints of MV Power cables.
  • Preparation of Technical specifications.
  • Leading a team of engineers in different areas and activities.
A variety of companies in Australia - 1984 -1989.

Self-employed maintenance engineer of different plant and projects in Australia

Such as, Scrap Metals Plants, Dairy Farmers and Beer Manufacture plant.

Consulting Engineering Office – 1981-1983.

Position held - Electrical Engineer.

Duties:
  • Engineering, Technical Consultations and Tender documents preparation in Egypt.
  • Project Engineer responsible for the installation  of electrical and mechanical  works for Water Purification plant .These works covers the installation of all electrical works, Control panels, instrumentations, MCC, as well as installation of mechanical equipment.
National Engineering and Construction – 1974 - 1981.

Position held - Project Engineer. 

Duties:
  • Responsible for the electrical installation for new projects in Libya.
  • Responsible for electrical design preparation of new residential areas.
  • Substation (11/.38 kV) installation.
  • Central heating systems.
Westinghouse Electrical – 1973 – 1974.

120 MW   4 gas turbine electrical power generating plant in Tripoli.

Position held - Electrical  Engineer.

Duties:
  • Power cables installation and testing.
  • Control and power cables terminations.
  • Fire detection system.
  • Earthing system in general.
  • Control panels and equipment in general.

Locations I am interested in working:

Italy