Turkish Construction Superintendent

Available
Serial No: 16212
Skills keywords: construction, engineering, fabrication, offshore, oil&gas, project management, steel making plant, superintendent

Short Bio:

I have 9 years of experience as mechanical engineer including multinational EPC projects and fabrication yards. I had experience in piping, mechanical, electric & instrument and structural installation works for industrial projects. I am able to organize, manage and control activities safely as per work schedule within quality requirement of the contract. I am self-motivated, good team player and able to build relationship with my pleasant and positive attitude
I am currently wo

Current location:  Türkiye - View on map
Nationality: turkish
Preferred Sector of Employment:  accounting and finance, Oil, Gas and Energy
Spoken languages: english, Turkish
Location I am interested in working: Anywhere

Qualifications & Education

1988-1996 MERSIN ELEMENTARY SCHOOL – MERSIN, TURKEY
Elementary Education

1996-1999 H. A. AKINCI HIGH SCHOOL- MALATYA, TURKEY
Scientific Education

2000-2005 SELCUK UNIVERSITY- KONYA, TURKEY
Bachelor of Science, Mechanical Engineering

Career Summary

2005-2007 ALTERNATIF LTD. STI. – ISTANBUL, TURKEY (23 Months)
POSITION: Mechanical Design Engineer

Designing and calculating pipe lines according to client specification

Drafting pipe isometric and drawings

Preparing material take off list

Cost estimating and planning

2007-2009
GAMA INDUSTRY- RAS LAFFAN, QATAR (22 Months)
PROJECT: QG3&4-QCS PROJECT (ONSHORE LNG – DOWNSTREAM)
CLIENT: QATARGAS
CONTRACTOR: CTJV (CHIYODA TECHNIP JOINT VENTURE)
POSITION: Mechanical Supervisor

Installation of static and rotating equipments( gas turbines MS 6001,pressured vessels, boiler feed water pumps,shell tube heat exchangers, transformers and packages)

2009-2011
ILK CONSTRUCTION-KHYANLI,TURKMENISTAN( 18 Months)
PROJECT: MCR-A PROJECT (MAGTIMGULY COLLECTOR RISER PLATFORM – ONSHORE/OFFSHORE-UPSTREAM)
CLIENT: PETRONAS
CONTRACTOR: MMHE (MALAYSIA MARINE AND HEAVY ENGINEERING)
POSITION: Electric and Instrument Superintendent

Intstallation and pre-commissioning activities low and medium voltage switchgear,lighting,ups,nav aids, fire and gas, metocean, telecom, esd , paga ,papa,cctv and ballasting systems and field instrumantation according to client planning schedule, quality and safety criteria

2011-2011
PONDERA CONSTRUCTION- KALUGA OBNINSK, RUSSIA (2 Months)
PROJECT: KALUGA ELECTROMETALLURGICAL PLANT
CLIENT: CSIEMP
CONTRACTOR: GAMA INDUSTRY
POSITION: Mechanical Superintendent

Installation and erection of mechanical equipments belong Dedusting System ( Pelletizing System, Main Fan Unit, Drop Out Box, Water Cooled Hot Gas Line, FTP Dampers and Fans, Dust Conveying System) including lifting studies preperation and drafting.

2011-2013
DANIELI CONSTRUCTION INTERNATIONAL (EPC) – JUBAIL,SAUDI ARABIA (24 Months)
PROJECT: HADEED NEW STEEL PLANT LONG PRODUCT PROJECT (EPC)
CLIENT: HADEED
CONTRACTOR: DANIELI CONSTRUCTION INTERNATIONAL
POSITION: Underground Piping Works Superintendent (*)

Coordination between disciplines and sub contractors.

Supervising piping( fire fighting, fresh water and cooling water) progress and assisting engineering about construction problem

Pre casting and installation piping manholes, hydrant supports, hydrant protection blocks and piping road crossing sleeves and related civil works

Coordinating excavation, backfilling and related civil jobs with underground piping

Coordinating cathodic protection ( sacrifical and impressed current system) installation

Embeded steel items fabrication for civil works

(*) Steel Making Plant Piping Test Pack Coordinator and Piping Gas Lines Commissioning Supervisor. After completion of underground piping works.

2013-2013
PIRAMIT INDUSTRY –SIRTE,LIBYA ( 3 Months)
PROJECT: AL KHALIJ 4X350 MW POWER PLANT PROJECT
CLIENT: GECOL-BECHTEL
CONTRACTOR: GAMA, DOOSAN, HYUNDAI
POSITION: Site Manager

Structural works (bolt replacement, cladding)(With GAMA)

Painting works ( epoxy for concrete surface, painting for structural surface) (With GAMA)

Piping,Electrical,Mechanical and Welding work( manpower supply for piping,mechanical,electrical and welding works for boiler, carbon steel, stainless steel, alloy steel and micro alloy steel material weldings) (With DOOSAN)

2014-Present
PIRAMIT INDUSTRY – ANKARA,TURKEY ( Current)
PROJECT: VARIOUS (WORKSHOP)
CLIENT: ZADCO, SICIM
CONTRACTOR: PREKONS
POSITION: Fabrication Manager

Steel fabrication of container camps to ZADCO offshore project in Abudhabi and train maintanence workshop structural steel fabrication to SICIM project in Kazakhistan and various structural steel fabrication.

 

 