Top Greek Civil Engineer

Available
Serial No: 9518
Skills keywords: 

Short Bio:

Senior Civil Engineer with more than 25-years long professional career, a strong technical background and an extensive involvement with the Project Management and Supervision of Construction of major technical projects, including civil works, port development, industrial complexes, buildings etc. Experience in this regard covers fully aspects such as monitoring of contractors’ time-schedules and proposing mitigating measures for delays, checking conformity with Technical Specifications and quality standards, follow-up of contractors’ human, financial and equipment resources, reviewing contractor’s designs, processing of variation orders, negotiation of contractors’ claims, processing of contractors’ payments, arbitration procedures etc.

Current location:  Greece - View on map
Preferred Sector of Employment:  accounting and finance
Spoken languages: english, Greek - Native, russian
Location I am interested in working: Anywhere

Education: 

Institution : Tashkent Institute of Engineers of Irrigation and Mechanization of Agriculture, Faculty of River hydro technical structures and construction of hydroelectric power plants, Former USSR

Dates : September 1982 – June 1987

Degree(s) or Diploma(s) obtained : MSc in Engineering

Institution : University of Leicester, England, UK

Dates : October 1998 – December 2000

Degree(s) or Diploma(s) obtained : Master of Business Administration

Language skills:

Greek

English

Russian

Membership of professional bodies:

• Member of the Technical Chamber of Greece

* Member of the American Society of Civil Engineers

Professional Experience Record:

Date : 08/2012 – 05/2013

Location : Yanbu, Saudi Arabia

Company: SETE ENERGY SAUDIA for Industrial Projects

Position : Construction Manager

Description : EPC Contract: Industrial Waste Water Treatment Plant, IWTP-II project value – USD150mln

Date : 05/2011 – 07/2012

Location : Jubail, Saudi Arabia

Company: SETE ENERGY SAUDIA for Industrial Projects

Position : Deputy Construction Manager

Description : EPC Contract: Expansion of Stage III of Industrial Waste Water Treatment Plant, IWTP-8, project value – USD150mln.

Date : 03/2009 – 05/2011

Location : Azzawiya, LIBYA

Company: J&P (OVERSEAS) LIBYA LTD.

Position : Project Manager

Description : Construction of New Fishing Port “Dila” at Azzawiya, Project’s value $80 mln.

Execution of this project includes construction of the two breakwaters (320 lm and 140 lm), dredging and earthworks (approx. 800.000c.m.), quays for 85 different sizes fishing boats, travel lift and superstructure facilities (roads, buildings, electricity, phone, fire protection networks and etc.)

Date : 06/2008 – 02//2009

Location : Kranidi, GREECE

Company : Aristo Developers (Hellas) S.A. (Dolphin Capital Investors Group)

Position : Project Manager

Description : Management of mobilization works for construction of the Kilada Hills Hotel and Golf Resort.

Date : 08/2007 – 06//2008

Location : GREECE

Company : Sierra Development (Hellas) S.A. (Sonae Group)

Position : Development Manager

Description : Management of shopping centres development projects in Greece.

Date : 03/2006 – 04/2007

Location : SAUDI ARABIA

Company : ARCHIRODON N.V.

Position : Construction Manager

Description : Construction of Integrated Water and Power Plant, Phase II (Subcontract for Civil Works from Siemens GMBH), Project Value 50mln. USD.

Date : 01/2005 – 03/2006

Location : KAZAKHSTAN

Company : ARCHIRODON NV

Position : Branch Manager

Description : Responsible for company operations in Kazakhstan

Date : 07/2004 – 12/2004

Location : KAZAKHSTAN

Company : JV BOSKALIS – ARCHIRODON VOF

Position : Operations Manager

Description : Kashagan Field Development Experimental Program. Offshore Complex “D”.

Execution of this project included construction of artificial islands, breakwaters and etc. for oil exploration purposes.

Date : 04/2003 – 07/2004

Location : GREECE

Company : EDRASIS – CH. PSALLIDAS S.A.

Position : Site Manager

Description : Construction of the Kandila’s Irrigational Network, value 15 million euros.

Construction of this project included channel excavations, installation of 90 kilometres of PVC pipes (d = 110 – 400) and 30 kilometres of steel pipes (d = 200 – 1200), 17 pump stations, 2 water reservoirs (15000 cubic metres and 25000 cubic metres, repairing and construction of 150 kilometres of earth roads and etc.)

Date : 08/2002 – 03/2003

Location : SAUDI ARABIA

Company : SETE Technical Services S.A.

Position : RFM Project Manager

Description : Operation and Maintenance of Royal Facilities, which includes His Majesty King Fahd’s Al-Salam Palace (2mln.sq.m., includes four artificial islands, number of jetties and marine facilities and etc.) in Jeddah and Al-Jazirah Palace ( 350,000 sq. m. with relative facilities) in Tuwwal, New Jeddah Fountain, Royal Berths in Rabigh and etc.

Date : 08/1997 – 08/2002

Location : GREECE

Company : ADK Consulting Engineers/ Joint Venture with Triton Consulting Engineers

Position : Resident Engineer/Head of Branch Office

Description : Port of Patra

Responsible for the start-up, organization and management of ADK’s office in Patra for the implementation of the Project management of the First Phase (Stage I & II) of New Patras Port Development project, involving the construction of about 900 m of caisson quay wall and 1350 m of breakwater (water depth of about 45 m), the development of total land area of 250,000 m2, the installation of geo-synthetic vertical drains, the construction of stone piles etc.

Date : 10/1996 – 07/1997

Location : BULGARIA

Company : C.J. Sarantopoulos S.A.

Position : Project Manager/Resident Manager in Bulgaria

Description : Construction of Transit Road Rehabilitation Project LOT VI/95, value $4,6 mln.

Responsible for the start-up, organisation and management of C.J.S’s offices in Bulgaria (Sofia and Ihtiman) and Installation of Asphalt Plant “MARINI – 150” for the Construction of Transit Road Rehabilitation Project LOT VI/95 Rehabilitation of 22 kilometers of Sofia – Plovdiv Highway included earthworks, asphalt works, road works, road repairs, reconstruction of big structures (bridges, overpasses etc.).

Date : 01/1996 – 10/1996

Location : GREECE

Company : LIKODIMOS S.A.

Position : Project Manager

Description : Construction of the Two Railroad’s Crossing Overpasses situated in the places of 71+100 and 109+218 of Piraeus – Platy Railway Project in Viotia, value $1.8 millions.

Construction of this project included earthworks, installation of concrete 10 meters long piles, production of pre-cast elements, pre-stressed structures, asphalt works, etc.

Date : 07/1995 – 12/1995

Location : UNITED ARAB EMIRATES

Company : ARCHIRODON CONSTRUCTION (OVERSEAS)

Position : Section Head

Description : Mina (port) Zayed. Contract 78. Reconstruction of Wharves 5 – 9, value $4,9 millions.

Responsible for supervision and execution of Earthworks, Demolition of existing quay wall, Steel prefabrication, etc.

Date : 09/1994 – 07/1995

Location : BAHRAIN

Company : SAUDI ARCHIRODON LTD.

Position : Section Head/Pre-cast Yard Engineer

Description : Second Manama – Muharraq Crossing Contract No 2 Marine Bridge and Muharraq Interchange, value $28,7 millions.

Responsible for the different types of operations involved in the pre-casting of bridge elements (Spine elements weighing 150 tonnes, side frames and parapets). Duties included supervising of shuttering, reinforcing and pre-stressing steel, as well as concreting, lifting and curing of all these elements.

Date : 01/1994 – 08/1994

Location : SAUDI ARABIA

Company : SAUDI CONDRECO LTD. (ARCHIRODON GROUP)

Position : Section Head/Construction Engineer

Description : Medina – Yanbu Desalination and Power Plant – Phase II – LOT 2B –R.O. Desalination Plant, Yanbu, Subcontractor’s value $22,48 millions.

Responsible for construction of the part of the Civil Works for the above Project as detailed below, in every technical aspect.

1. INDUSTRIAL WORKS

Seawater Intake Pumping Station, Dual Media filters & Cartridge filters / Filtered Water Clearwell, heavy Concrete Structures, Reverse Osmosis Desalination modules plant, Common Utilities Substation, Transformers Yards, Concrete Tanks, Pipe and Cable Trenches.

Total Value $936,000

2. BUILDING WORKS

Office Building, Sunshades, Overhead Cranes structures for RO Desalination Plant systems, Pipe Rack foundations.

Total Value $722,000

Date : 02/1993 – 01/1994

Location : GREECE

Company : TECHNICAL COMPANY OF GENERAL CONSTRUCTION S.A.

Position : Site Engineer

Description : Construction of the Smokovo Dam – Leontary Irrigational Tunnel, value $10 millions.

Responsible for supervision and execution of tunneling works by Drilling and Blasting and excavation by tunneling machine “Road header” as well as for measures of protection of tunnel by using of expansion anchors, steel frames, gunite concrete, pre-cast elements, etc. .

Date : 02/1992-02/1993

Location : GREECE

Company: NATTEM CONSTRUCTION LTD

Position : Site Engineer

Description : Construction of Main Port of Kavala, Stage I & II, Subcontractor’s value $500,000

Responsible for supervision and construction of Marine Works included general excavation (dredging) sea bed of harbour area (up to –12,00), trench dredging (600 meters long, up to –18,00 depth) for quay wall foundation area, back filling of trench by crashed stone, preparation of bed for placing of blocks of quay wall, construction of quay wall by concrete blocks, protection of breakwater by placing of armour rock by floating crane, etc.

Date : 04/1990 – 02/1992

Location : GREECE

Company : Technical Office of Evaggelos Zaranis

Position : Civil Engineer/Associate

Description : Design and Supervision of the Construction of Various Private Housing Projects.

Date : 08/1987-03/1990

Location : TAJIKISTAN, FORMER SOVIET UNION

Company : ROGUNGESSTROY- STATE GENERAL CONTRACTOR COMPANY

Position : Technical Office Engineer/Dam Construction Engineer/Supervisor Engineer

Description : Construction of Rogun Hydropower Electric Station 3,6 Megawatt and Irrigational Complex (Earth Dam 335 meters height (70,000,000 cubic meters volume), Underground Complex for Installation of 6X600,000 Watt Generators, 60 kilometres of hydraulic and transportation tunnels, 8,3 billion artificial water reservoir, 10,000 population Rogun City with full infrastructure (schools, hospital, rest areas, stadiums, kindergartens etc.), plants of Asphalt, Concrete Production, etc.) Total Value $2 billions.

As a Technical Office Engineer was responsible for technical-engineering aspects (technical problem-solving, design supervision, cooperation with related consultants and research institutes) for construction of Rogun City, Asphalt and Concrete Production Plants, Conveyer/Transportation lines from Quarries to place of Dam Construction.

As a Dam Construction Engineer was responsible in all technical aspects of construction of First Stage of Earth Dam included Upper Embankment and Upper Dam (90 meters height, 2,000,000 cubic meters volume).

As a Technical Supervisor Engineer was responsible for supervision of construction of Underground Station Complex and Hydraulic and Transportation Tunnels, works, which were carried out by subcontractors.






popup-img