CV, Singapore Based, Electrical Project Engineer, Oil And Gas

Unavailable
Serial No: 18947
Skills keywords: electrical commissioning, engineering co-ordination, procurement follow up, project management

Short Bio:

An electrical Project Engineer with vast experience in the Oil & Gas Industry (Marine & Off Shore). Specializing in Project Management of Electrical Construction and Commissioning of New Build / Conversion and repair vessels.

Current location:  Singapore - View on map
Nationality: Singaporean
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english, Malay, Tamil
Location I am interested in working: Anywhere

Qualifications & Training

• Diploma In Electrical Engineering

(Ngee Ann Polytechnic-School of Engineering)

Professional Certifications send by Company:

• Shipyard Safety Supervisor Course

• Company authorised – Safety Competency Screening Tester

(For New Employees – Shipyard & Sub Contractors)

• Shipyard Lifting Supervisor Course

• Marine Project Management for Supervisors

• Certified Marine Supervisor Course

• Certification of Appreciation for ATEX – Directives

• Certified User of Laser Alignment – OPTALIGN SMART (PRUFTECHNIK)

• Certified in HUET – EBS. Heli- Under Water Escape Training (Off Shore)

Career Summary

Positions Held in Sembawang Shipyard: Project Engineer, Sembawang Shipyard Pte Ltd
(July 2011 –Present)

Engineer, Sembawang Shipyard Pte Ltd
(July 2010 – June 2011)

Asst. Engineer, Sembawang Shipyard Pte Ltd
(August 2006- June 2010)

Major Offshore Conversion/Upgrade Project Track Records in Sembawang Shipyard:

1. FPSO Kaombo North (Present) – Conversion. Field Angola. Company TOTAL.

Contractor: Saipem. [Yr 2014 to 2017] – Quality (Production) Lead. Project Value US$4B

– Scope: Internal Turret, Hull, accommodation, Topside conversion.

Conducting inspections and to ensure all works done & materials / equipment received meet the project’s quality requirement for entire EIT system before presenting to Owners & Class for acceptance

2. FPSO Kaombo South (Present) – Conversion. Field Angola. Company TOTAL.

Contractor: Saipem. [Yr 2014 to 2017] – Quality (Production) Lead. Project Value US$4B

– Scope: Internal Turret, Hull, accommodation, Topside conversion.

Conducting inspections and to ensure all works done & materials / equipment received meet the project’s quality requirement for overall EIT system before presenting to Owners & Class for acceptance

3. FSO Banyu Urip – ExxonMobil Indonesia [Yr 2011 to 2014] – EPCC Sembawang

E.I.T. (Project) Engineer (Took over shared responsibilities with actual lead engineer in 2014)

– Scope: Hull, Accommodation, Topside lighting system installation & commissioning.

4. R.V.Investigator DP I – New Build, Scientific Research Vessel, Client: CSIRO Australia
(Yr 2011 to 2014)

– EPCC Sembawang. E.I.T. Lead (Project) Engineer

– Scope: Hull, Accommodation, Scientific Sonar & winches System – Installation & Commissioning.

5. Borealis-7 DP III – New Build, Heavy Lift and Pipe lay Vessel EPCC, Client: Subsea 7
(Yr 2009 to 2012)

– EPCC Sembawang. E.I.T. (Project) Engineer (Took over shared responsibilities with actual lead engineer in 2012, Netherlands)

– Scope: Hull, Accommodation carry over works in Netherlands – Installation & Commissioning of various systems including Auxiliary LV switch boards, Heat tracing, communications.

6. Flintstone –DPII – New Build, Rock Dumping Vessel, Client DEME Netherlands
(Yr 2009 to 2011) EPCC Sembawang.

E.I.T. Engineer (Took over shared responsibilities with actual lead engineer in 2011)

– Scope: Installation & Commissioning of DP2Field Stations, VFD (Variable Frequency Drives), ICS system

7. ARV I –DPII – Conversion, Client: Equinox Brazil
(Yr 2008 to 2009)

Accommodation and workshop facilities vessel

E.I.T. Asst. Engineer (Took over shared responsibilities with actual lead engineer in 2008)

– Scope: Hull, Accommodation – Installation & Commissioning of complete EIT system.

8. FPSO Conversion Aoka Mizu – DP II- Conversion, Client: Blue water Energy Services
(Yr 2006 to Yr 2008)

E.I.T. Asst. Engineer (Took over shared responsibilities with actual lead engineer in 2007)

– Scope: Topside, internal Turret, DP 2 system, partial accommodation conversion complete package scope.

9. Sapura 3000, DP Heavy Lift and Pipe lay Vessel EPCC, Acergy, New Building,
(Yr2006 to Yr 2007)

EIT Asst. Engineer.

– Scope: Pipe laying, 3000T crane, accommodation, DP2 system, Hull, accommodation. Installation & commissioning of overall EIT system.

Repair and minor upgrade projects Executed from 2008 to 2012 as Repair Lead & Advisor to Project teams / Foremen / Engineers:

– Alaskan Frontier, Client: Alaskan Tanker Company (U.S.A), Alliance/ Favoured Customer (VLCC – Crude Oil Tanker)

– Alaskan Explorer, Client: Alaskan Tanker Company (U.S.A), Alliance/ Favoured Customer (VLCC – Crude Oil Tanker)

– Alaskan Navigator, Client: Alaskan Tanker Company (U.S.A), Alliance/ Favoured Customer (VLCC – Crude Oil Tanker)

– Alaskan Legend, Client: Alaskan Tanker Company (U.S.A), Alliance/ Favoured Customer (VLCC – Crude Oil Tanker)

(Served as advisor to project team on installation & commissioning of various systems)

– Badrinath, Client: Gol Offshore, India (Drill Ship)

(Served as advisor to project team on installation & Commissioing of new switchboard)

– BP Security, Client: British Shipping Ltd, Alliance/ Favoured Customer (VLCC – Crude Oil Tanker)

– S.K. Summit , Client: S.K.Shipping Co, Ltd, (Korea) (LNG)

– Wilenergy, Client: Awilco A.S (Australia) (LNG)

– Saipem 10000, Client; Saipem (Indonesia) (Drill Ship)

(Served as advisor to project team on removal of Propulsion Thrusters motors for over haul and installation of various systems)

– Stena Victory, Client: Arlington Tankers Ltd / Vmax (Bermuda) (ULCC – Crude Oil Tanker)

– Continental Spirit: Client: Teekay Shipping, (Singapore) (VLCC – Crude Oil Tanker) Alliance/ Favoured Customer

Installation & Commissioning of:

– Fuel oil separators

– Stern Tube Water quality packages

– H.V. Harbour Diesel Generator

– Renewal of ICCP, MGPS system,

– Upgrade of CO2 & Fire detection systems

– BNWAS – Bridge Navigation Watch Alert System (Mandatory for all vessels since 2012)

– Overhauling / Repairs / renewal of various intricate systems such as Main Engine Bed plate renewal, Main engine Gear box, LNG cargo pumps, Propulsion (DP)Thruster motors.

General Job Scope Summary:

• Attend ship survey locally as well as overseas to submit technical report to owner to review,

discuss responsibilities matrix together with Project managers, commercial and engineering team as required.

• As lead electrical marine & offshore engineer, lead a team of other engineers, foremen, supervisors and Sub-contractors in ship conversion/upgrade projects in accordance with specified requirements within the scheduled time frame.

• Reviews supplier / vendors & engineering deliverables inclusive of engineering drawings, equipments and consumables to carry out specific projects and also to ensure they comply with the contract specification.

• Represents the (Discipline) Production / Project – department in technical meetings and discussion with clients.

• Ensures the safety of personnel through compliance with Occupational Safety and Health and Environmental Regulations.

Discipline Skills Summary:

Below is the summary of lead engineer scope of work which I am currently required to execute within specific time frame after project awarded.

1. Project Management

• Review tender documents, create responsibility matrix list, vessel inspection report (if any), project organization chart.

• Plan manpower for both yard and Sub-Contract work force to be deployed for conversion and New Built projects.

• Discuss with company planners to identify solution to meet project objective.

• Prepare progress summary and discipline man hour summary on weekly basis for

owner and internal project team review and approval for project report.

• Prepare specification summary and after discussion with Contracts team together with Engineering inputs to invite Sub-Contractors to participate in the project.

• Sub-Contractors selection such as comparison list summary, interview and prepare documentation such as works order.

• Participate in Vendors’ selection together with Engineering & Contracts team.

• Coordinate with project manager to review the planning schedule and deliverables.

• Prepare minutes of meetings.

• Prepare change notification and site queries to relevant parties; such as Engineering, Clients’ Site team.

• Prepare project tools requirement list such as daily, weekly, monthly and overall look ahead of project to identify upcoming critical path and mile stones to be met as per requirements.

2. Procurement Follow up

• Meet up with various vendors to explain project requirements.

• Review all vendor compliance and prepare selection summary for individual system.

• Review MTO / MEO list of procurement.

• Key in SAP system for procurement requisition & works order.

• Coordinate with company material handlers and buyers for the deliverables.

• Request for vendor certified data for engineering process as well as project requirements.

• Prepare, Attend and do Inspection of equipment system during FAT and MVR

(Material verification process) along with company QAQC.

3. Engineering Co-Ordination

• Liaise with engineering to review 2D or 3D model.

• Review & comment existing vessel drawings.

• Review & Comment new general arrangement drawings for space and construction requirement.

• Review & Comment basic design philosophy such as various interface study, cable routing, cable trunk and other critical machinery spaces arrangements.

• Review & Comment design calculation such as load list / lighting Lux requirement.

• Review & Comment demolition drawings (in conversion scope) to Engineering team and owners.

• Study, review Cause & Effect diagram for systems like ESD, F&G, HVAC and their interface.

• Study , review & Comment on cable block diagram, layout drawings, single line, loop diagram

and termination diagram.

• Study & review cable schedule, equipment list and instrument index list for any clashes or discrepancies against actual SGL (Single Line diagrams) and termination diagrams.

• Study, review IO list together with engineering team to establish information completeness and equipment’s self sufficiency.

• Review P&ID & D&ID for inter discipline tie-ins.

• Prepare and send site queries to concerned engineering team.

• Review, Comment and raise queries if any on commissioning check list to engineering team / vendors prior and during commissioning.

• Prepare As-Built drawing / documents for final submission to Engineering teams and owner for preparation of final Dossier.

4. Construction

• Conduct Kick-off meeting and presentation for site sub-contractors to go through the requirements of related project before work start.

• Vessel detail inspection during docking.

• Attend daily VSCC (Vessel Safety Committee Meeting) meeting on board.

• Coordinate with site project / area mangers to monitor site progress.

• Solve any clash and system function issues on board.

• Planning, execution & review of daily, weekly, monthly progress in order to improve overall schedule.

• Plan and execute critical activities such as Heavy lifting of electrical equipments, Hi-Pot Tests, Switchboard energizing, Kick-start of generators, critical machinery alignment.

• Support project team in analyzing additional job requirements.

• Overseas travel involved if any incomplete jobs are to be carried over to actual site.

5. MC/EC & Commissioning

• Conduct internal inspection of completed works: Installed system on board against current approved drawings before presenting to Company QAQC / Clients and Class.

• Support commissioning team during M/E completion and commissioning phase.

• Support owners & class site surveyor during inspections and commissioning.

• Involved in planning and execution of vessel’s sea trails.

 

 