CV, Serbia Based Civil, Structural Engineer Looking Globally

Available
Serial No: 34158
Skills keywords: civil/structural engineer, engineer for hydropower, engineer for roads, engineer infrastructure, tunnel engineer

Short Bio:

Please see CV below.

Current location:  Vojvodina, Serbia - View on map
Nationality: Serbian
Spoken languages: english, russian, Serbian
Location I am interested in working: Anywhere

Languages

MOTHER LANGUAGE: Serbian

OTHER LANGUAGES : English, Russian

• Reading skills: Good

• Writing skills: Good

• Verbal skills: Good

 

Education & Training

• Dates: 2003

• Name and type of organisation providing education and training: Faculty of Civil Engineering ,University of Belgrade

• Title of qualification awarded: Graduate Civil Engineer in Structural Engineering

 

• Dates: 1995

• Name and type of organisation providing education and training: Technical school with boarding school “M. POPOVIC” in Crna Trava

• Title of qualification awarded: Technician of civil engineering

 

Technical Skills & Competencies

High level of knowing all works on building the tunnels, roads, concrete, gas pipelines,reinforcement,…

I use technical documentations and pc software (Office and Autocad)

 

Organizational Skills & Competencies

High level of skills with co  workers as with managers. Good perception and perspective. Good working progress under stress and short deadlines

 

 

Work Experience

• Dates: 2013-2015

• Name of employer: Quest Resources Construction- Abuja, Nigeria

• Type of work: Road construction

• Occupation or position held: Civil Engineer-Project Manager

• Main activities and responsibilities: Project Manager for the construction of roads, drainage networks rainfall in Owerri-Orlu, Imo State, Nigeria

The projects in Nigeria involved:

– roads

– highways

– roundabouts

– collection reservoirs for atmospheric precipitation,

Duties included:

– complete organization of the construction site,

– control of all operations

– regular reporting to the Governor of Imo State who was the client

• Dates (from – to): 2012-2013

• Name of employer: ПУ “МОСОЧИСТВОД“-АРКС

• Type of work: The construction of water reservoirs in Moscow

• Occupation or position held: Project Manager

• Main activities and responsibilities: Demolition of existing reservoirs and making new reservoirs, demolition and rehabilitation of existing reservoirs is needed for worn-out material and numerous damages and therefore it came to getting dirty water and loss of large amounts of water, reservoirs are done in various shapes and various sizes.

The project involved:

– reservoir circular ladder

– reservoir  water

water maker

For the projects  in Moscow my position was Project Manager and my duties were:

– complete organization of the construction site

– control of all operations

– regular reporting to investor

 

• Dates: 2012

• Name of employer: LEON, Moscow

• Type of work: Conversion of warehouse into office space

• Occupation or position held: Project Manager

• Main activities and responsibilities: Our client is on the third floor of the purchased 1000m2 of warehouse space and it space is supposed to adapt to office furniture space

– Gypsum works:( Lining the walls of the existing gypsum board, Making new walls, Setting up a suspended ceiling-Armstrong, Smoothing, Plastering )

– Plumbing Works:( Development of new water mains for toilets, bathrooms and kitchen)

– Create a new hydrant network (Create a new sewage network)

– Mechanical works: (Set carpentry, Creating a new ventilation system, Refit and setting of heating bodies)

– Electrical works: (Electrical distribution system for the entire building )

– Submitted works: (Setting up a laminate floor , Ceramic works)

 

• Dates:  2009-2013

• Name of employer: ZGP

• Type of work: Reconstruction of the tunnel in Zvornik

•Occupation or position held:  Project Manager

• Main activities and responsibilities: Head of construction site

For the projects that I worked in Bosnia and Herzegovina, my position was Project Manager and my duties were:

– complete organization of the construction site including all operations

– regular reporting to investor

At the project RECONSTRUCTION OF RAILWAY TUNNEL Zvornik – Tuzla:
Punching from Tuzla were made by NATM technology and punching from the direction of Zvornik we conducted TBM technology

• Dates:  2009

• Name of employer: Bilfinger Berger Qatar W.L.L

• Type of work: 12000 apartments in Doha.

•Occupation or position held Site Engineer

• Main activities and responsibilities:

– Installation of a gas network in the settlement (soil excavation, leveling ground and pipes, installation of pipes)

– Construction was finished by using prefabricated elements that were positioned by a car jack and using cranes and served as a board holokori which were washed down with concrete

Also performed the complete installation of gas pipeline through the village and for the city

My duties were:

– complete organization of the construction site and all operations

– regular reporting to  Project Manager

 

• Dates: 2007-2008

• Name of employer: RJ.HIDROGRADNJA-GACKO

• Type of work: Building hydrolines for hydroelectric dams on Trebišnjica. Waer used for sausage Bileca lakes -17 km with tunnels and bridges Concreting of critical sites Bileca-Padjeni

• Occupation or position held: Main Engineer for Concrete

• Main activities and responsibilities: I led all reinforcement and concrete works in the tunnel

The project in Bosnia and Herzegovina involved:

– construction of a tunnel for water

– construction of two hydroelectric power plants

– small hydro power plants at the entrance of the tunnel  (159MW)

– hydroelectric power plant (210MW)

For the projects that I worked in Bosnia and Herzegovina, my position was Site Engineer and my duties were:

– complete organization of the construction site

– control of all operations

– regular reporting to Project Manager and Investor

Total length of the tunnel:16,974 KM

Project DIGGING THE TUNNEL BILEĆA – PAĐENI we used TBM technology penetrated from the direction of Bileca and NATM technology we worked from the direction Padjeni and the input structure

• Dates (from – to): 2006-2007

• Name of employer: DRINA-COOP D.O.O

• Type of work: Apartment Building, town Subotica (Serbia) gross area of 3500 m²

• Occupation or position held: Project Manager

• Main activities and responsibilities: I worked as the supervisory authority and the contractor, the masonry, finishing and installation works, facade works demit setting and structural facades, as well as upgrading attic apartment-storey office Head site, under his administration, (70 people – bricklayers, carpenters, reinforcing, craftsmen, installers, operators and spectroscopy workers)

The project involved:

– construction of a residential building

Duties were:

– complete organization of the construction site,

– control of all operations

– regular reporting  to Investor

 

• Dates: 2002-2006

• Name of employer: RJ.HIDROGRADNJA-GACKO

• Type of work: Building hydrolines for hydroelectric dams on Trebišnjica, excavation and concreting tunnel , Tunnel Fatnica -Bileca

• Occupation or position held: Site Engineer

• Main activities and responsibilities:

I led all reinforcement, concrete works in the tunnel

The excavation is carried out using a mole. Blasting be exercised by the drilled using a gun at a depth of 130-cm to 30 cm deep, set the explosives and blasting using electronic detonators. Concreting of critical sites, these are places where they found pockets of the country and came to dive, and where there were caves, or open the tunnel and a hole on the side of the tunnel

The project in Bosnia and Herzegovina involved:

– construction of a tunnel for water

– construction of two hydroelectric power plants

– small hydro power plants at the entrance of the tunnel 159MW

– hydroelectric power plant 210MW

Duties were:

– complete organization of the construction site,

– control of all operations

– regular reporting Project Manager and Investor

Total length of the tunnel:16,974 KM

Project DIGGING THE TUNNEL BILEĆA – PAĐENI we TBM technology penetrated from the direction of Bileca and NATM technology we worked from the direction Padjeni and the input structure

• Dates: 2001-2002

• Name of employer: JANOVIC-BUDVA D.O.O.

• Type of work: Building third line of road construction on road: Budva-Jaz and Reconstruction of the tunnel(complete reconstruction of the tunnel)

• Occupation or position held: Site Engineer

• Main activities and responsibilities: Head of construction site, Building third line of road construction on road: Budva-Jaz and Reconstruction of the tunnel , Excavation for retaining walls on the length of 1144m. Create retaining walls (reinforcement and concreting), high retaining walls from 2m to 6m. Filling up a tampon coating is performed in layers by the compression cylinder and a vibrating roller, signal marking the complete route

The project involved:

– The construction of the third lane of the highway

– The reconstruction and construction of a new section of tunnel

Duties were:

– complete organization of the construction site,

– control of all operations

– regular reporting to Project Manager

Project RECONSTRUCTION OF HIGHWAY BUDVA – JAZ: inolved NATM technology only a small part where opened a new section we have worked TBM technology

 

 

 

 

 






popup-img