CV, Senior Electrical Engineer Seeking Work In Saudia Arabia

Available
Serial No: 20360
Skills keywords: prepairing shop drawings, project managment, site super vision

Short Bio:

l have 13years experience in contracting. I worked as a site electrical engineer for 3years thenas a technical engineer for 5 years to prepare shop drawings ,as built drawings and material submittal ,also I worked as MEP manager for the last 5years.

I am living in Riyadh and I have a transferable visa(Iqama) which can be transferred immediately.

Current location:  saudia arabia - View on map
Nationality: Jordanian
Spoken languages: arabic and english
Location I am interested in working: Anywhere

Relevant Qualifications & Skills

ACADAMIC QUALIFICATION

1997-2002 – Bachelor of Electrical Engineering

All Balqa Applied University-Jordan, major Electromechanical Engineering
1996-1997

High School, scientific stream, final result (89.7%)

COMPUTER SKILLS
Presently working on AutoCAD 2009 on latest system setup of windows XP.Ms Word and Excel.

Furthermore, working in Dialux program for illumination calculation and Ecodial program for Electrical system design.

LANGUAGE SKILLS

I have fluent command to Read, Write, and speak English and Arabic Languages.

Career Summary

From 1st July 2011 up to date:
Working with Ali Zaid Al-Quraishi for Electrical Services (AQESA) –CONTRACTING DEVISION -Riyadh / KSA

Project: King Abdul Aziz Centre for World Culture (Consultant: Aramco)

(Supply and Installation of MV transformers, ATS and Cable Bus)

 Working as Electrical Project Manager with following responsibilities:

1- Supervise electrical operations in the project (installation, testing and commissioning of transformers, ATS & cable bus system).

2- Preparing Financial Summaries.

3- Attending all meeting related to work With Aramco and SOL.

4- Planning and scheduling all major activities of the Project.

5- Evaluate the requirement of all project resources (materials, tools, manpower).

Project: Installation of Control System for National Gas Distribution Company, (Consultant: NUCLEO Spain)

 Working as Project Manager with following responsibilities:

1- Planning and scheduling all major activities of the Project.

2- Attending all meetings related to the project.

3- Preparing a time and coast plan for the project.

4- Evaluate the requirement of all project resources (materials, tools, manpower).

Project: Residential Units at Diplomatic Quarter (Al-Aqaria project) (200 Villas).

 Working as MEP Project Manager with following responsibilities:

1- Responsible for planning and scheduling of all major activities of the Project.

2- Responsible for managing Staff/Labors/Subcontractors in the project.

3- Determine all Project requirements (Technical and General).

4- Ensure a successful completion of the Project within the budget and on time.

5- Review the general contract and contract documents, prepare &confirm the budget breakdown.

6- Ensure the timely submittal of all project submittals and obtaining approvals. (Samples, Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules, Programs etc.).

7- Attend all project related meeting with Client/Main Contractor.

8- Evaluate the requirement of all project resources (materials, tools, manpower).

From 22th September 2005 up 1st July 2011:
Working with Al-Arrab contracting company (KINGDOME OF SAUDIA ARABIA) for the following biggest projects:

1- From 5th September 2010 up 1st July 2011:

 Working in King Faisal University in Hasa for its Teaching Hospital (400 Bed, 9 Floors with basement) and outpatient clinics, as Electrical Project Manager with following responsibilities:

1-Responsible for managing Staff/Labors/Subcontractors in the project.

2-Determine all Project requirements (Technical and General).

3-Ensure a successful completion of the Project within the budget and on time.

4-Review the general contract and contract documents, prepare &confirm the budget breakdown.

5-Ensure the timely submittal of all project submittals and obtaining approvals. (Samples, Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules, Programs etc.).

6- Attend all project related meeting with Client/Main Contractor.

7- Evaluate the requirement of all project resources (materials, tools, manpower).

2-From 22th September 2005 up to 4th September 2010 :
Working in Umm AlQura University in Makkah ALMukarrammah, as Electrical Design & Supervision Engineer.

My responsibilities are included to study the project & design criteria as per contract documentation provided by University, and control the Design and Site Supervision for

Electrical Dept. Including production of shop drawing with material submittals & supervision of site works.

Moreover, coordination with main contractor & consultants, with a large flow of correspondence with manufacturers, suppliers, subcontractors, and every one related to the project.

The project contains from this buildings:

1- Teaching hospital (400 beds).

Finish complete shop drawings for all systems coordinated with system’s suppliers.

2- Computer center.

3- Student activity center.

4- Allied deans.

5- Medical labs.

6- Parking deck (4 floors).

7- Academic court.

8- Multipurpose Service tunnel. (800m) coordinated with all buildings connected to tunnel.

From 15th June 2003 up to 20th September 2005:
I worked with Ammoun Maintenances & Contracting Co.(JORDAN) as a Electrical site Engineer.

My responsibilities are included monitiring ,planing supervising work on site ,prucuring material on site, installatino and commissioning and startup of various electrical systems on site such as lighting dimming,building manegment systems, ups,fire alarm system,generator,lightning and grounding ,etc..

Moreover ,Issuing electrical Bills and variation orders.and prepare as Built drawings handling over of projects.

I was working in these projects:

1-privat villa in Dabooq/Amman

3 floors ,swimming pool,land scap and security system

2-The Royal court offices/Amman

3-private palace for Royal court/Amman.

4-private palace for royal court/Ajloon

From 20th June 2002 up to 14th June 2003:
Worked with Palestine Engineering Company(JORDAN) as a lift installation engineer, for DONG YANG & SABIEM lifts.

My responsibilities are included monitoring mechanical installation for rails, cabin and counter weight, after that make termination for controller, doors and cabin, then startup lifts after calibrations.

 

 

 

 






popup-img