To oversee and implement QA/QC management for the day to day civil / structural activities ( site preparation/ excavation /backfilling and compaction, roads, fence & gates, underground utilities/ culverts/ manholes/ duct banks/ pipe lines, electrical and instrument/ telecom lines, parks, installation of cabins, substation buildings/power structures, recreation and office buildings, sewerage treatment plant foundations, evaporation pond, and some other building facilities ) in the entire Khazz

Current location:  Calabarzon, Philippines - View on map
Nationality: Philippines
Preferred Sector of Employment:  Oil, Gas and Energy, Oil, Gas and Energy
Spoken languages: english
Location I am interested in working: Anywhere

Profile

A registered Civil Engineer having 14 years of experience in quality control & inspection, testing, documentation, supervision and monitoring in construction / oil and gas industries in compliance with the established inspection & test plan (ITP), approved design drawings (IFC), project & vendor specification requirements, safety rules & some other applicable codes and standards as Third Party Inspector (TPI) / Q.C. Inspector / Supervisor under PMC/ PMT and EPC/ Sub Con organizations in various mega exploration/ construction projects like:

(a) Oil Refinery and Gas Processing Plants/ Facilities

(b) Petrochemicals

(c) Fertilizer Plant

(d) Cement Plants

(e) Aromatics Plant

(f) Pipeline

(g) Preparation of well pads/platforms intended for the wells/ rigs as well as building on its facilities.

(h) Site preparation prior to build structures / housing / industrial facilities, plants, tank storage/ tank farm.

(k) Roads and buildings.

 

Professional Experience / Project Completed:

1.0 February 2015 – October 2015
QC Inspector Civil
Role: Quality Control
Arabian Industries Project LLC
Sultanate of Oman

Company Industry: Engineering, Design, Procurement, Manufacturing, Maintenance, Fabrication, Construction and Services.

Khazzan Consolidated Camp ( KCC ) for Gathering Wells Export System – Jacobs / British Petroleum Project at Block 61 Khazzan, Sultanate of Oman

Assignments / Duties & Responsibilities:

• To oversee and implement QA/QC management for the day to day civil / structural activities ( site preparation/ excavation /backfilling and compaction, roads, fence & gates, underground utilities/ culverts/ manholes/ duct banks/ pipe lines, electrical and instrument/ telecom lines, parks, installation of cabins, substation buildings/power structures, recreation and office buildings, sewerage treatment plant foundations, evaporation pond, and some other building facilities ) in the entire Khazzan Consolidated Camp ( KCC ) Project for the mega Gas Exploration Onshore Project ( Gathering Well Export System ) to be built within 30 years contract between the British Petroleum ( BP) and the Oman Government.

• Reports directly to the assigned Lead QA/ QC.

• Review of project technical specifications, drawings etc. to identify and determine quality and engineering criteria for materials, workmanship and testing requirements related to civil /structural works.

• Perform inspections and verifications during construction activities in accordance with requirements of the Inspection and Test Plans and take constant monitoring and surveillance in everyday’s construction routine.

• Attends all Client / final inspection and tests in the area of assigned responsibility.

• Witnesses and reviews of work being undertaken by a 3rd Party Testing /Inspection

related to civil works.

• Monitor / check sub-contractor and Suppliers’ quality assurance and quality control activities

• Steward non-conformances within scope of responsibility

• Brings matters concerning non-conforming work to the attention of the Lead QA/ QC and or Project Manager.

• Provide early warning by assisting construction personnel to identify problems and potential or actual non- conformances related to civil works.

• Participates in on site receiving Inspection of civil materials.

• Raises punch lists / reports for incomplete civil works or defective civil materials.

• Prepares files, maintains and retrieves test/inspection records and any other quality records as per quality plan.

• Ensures that any measurement & testing instrument to be used related to civil works are functional and calibrated.

• Participate in partial and final handover activities. Review submittal documents as directed.

• Check / review all survey reports requirements related to civil works as well as third party/ laboratory test agency reports.

• Performs any other related duties as assigned.

 

2.0 November 2013 – January 2015
In My hometown Philippines put up for a small business.

 

3.0 April 2012 – October 2013
Third Party Inspector (Civil / Structural) – Worked together with CH2MHILL as part of the Project Management Team / Company
Role: Civil Site Inspector
Moody Intertek International (mother company)
Abu Dhabi, United Arab Emirates

Company Industry: Providing tools and expertise for Quality Inspection and Assurance, Health, Safety and Environmental. Helping clients to move forward with confidence.

Shah Gas Development Program /Shah Gas Gathering Program/Project (Package 1), Abu Dhabi Gas Development Company (Al- Hosn Gas), Shah, Abu Dhabi, U.A.E.

Assignments / Duties & Responsibilities:

• Provide overall services for TPI works in the entire Shah Gas Gathering / Package 1 which starts from

(a) Well pad’s preparation (Earth moving / cut, fill and compaction) followed by:

(b) The individual excavation, backfilling and compaction, concreting works ( re-bars & form works),precast, post pour activities for several concrete foundations and misc supports, structural steel erection and roofing / metal cladding for several structures, architectural finishes inside Electrical – Instrument building at each pad / platform, fencing, etc. until final inspection prior to handover.

(c) Trenching and backfilling for the long pipelines

(d) Building the right of way (ROW) / maintenance road access along the pipelines from the wellheads and manifold area at each pad / platform going down to the central gas processing plant.

(e) Berm activities over the pipe lines from the well pads down to the processing plants.

• Review of project technical specifications, drawings etc. to identify and determine quality and engineering criteria for materials, workmanship and testing requirements related to civil works.

• Participate site inspection after kick off meeting prior to execute/ start the project.

• Surveillance and monitor all ongoing site activities by the EPC contractor / sub-contractors to ensure in compliance according to project specifications, drawings, contract and safety requirements.

• Perform inspection (check / witness ) for all the activities related to civil, structural steel erection, earth works, masonry, cladding/ roofing system, tile works etc. based on the ITP, procedures, drawings and specifications including material receiving, soil sampling collection at the borrow pit & testing ( lab. test ). Pointed out comments or punch points if any.

• Constant coordination with my colleague on site (PMC/PMT, EPC and the Sub Con etc.). Be fair and firm in dealings with them, consider the alternatives and consequences carefully before making decisions

• Participate in reviewing EPC contractor Method Statement, Inspection Test Plan (ITP), drawings etc. as well as incorporate any comments for PMC/ PMT approval.

• Report questionable methods of operations by the EPC to the PMC/PMT.

• Identifying and reporting to the QA/QC manager any non- conformances, raise surveillance report / non-conformance report (NCR) subject to PMC/ PMT QA/QC manager’s permission and approval. Coordinate and participate/ contribute corrective actions with the PMC/ PMT in-charge, const. manager or superintendent and the EPC for immediate solution.

• Attend weekly coordination meetings with PMC/ PMT,EPC contractor etc. Participate important discussion in relation with the construction, quality and safety matters.

• Keeping records everyday of  manpower, equipment and activities at site.

• Review all contractor documents prior to sign against project specifications and contract requirements.

• Adhere to safe working methods and reporting procedure.

• Prepare daily and weekly technical report to be submitted to PMC/PMT QA/QC in relation of the daily activities on site.

 

4.0 April 2008 – March 2012
Civil Inspector
Role: Quality Control
Al Jaber Energy Services
Mussafa, Abu Dhabi, United Arab Emirates

Company Industry: Engineering, Procurement, Construction contractor, Maintenance, Fabrication. Equipment and Transport Service provider, Manufacture and galvanizing. Multi – discipline expertise in Civil, Mechanical, Electrical Instrumentation and Pipeline works. Dedicated to Oil and Gas, Petrochemical, Pipelines, Water, Power, Industrial and Infrastructure sectors.

Ruwais Refinery Expansion Project (RRE), Abu-Dhabi Refining Oil Co. / TAKREER – SK Engineering & Construction Co. Ltd; (Civil & Building Facilities at Process, utilities and off site), Ruwais, Abu Dhabi, U.A.E.

Borouge – 2, Abu Dhabi Polymers – Tecnicas Reunidas (Civil at Utilities & Interconnection), Ruwais, Abu Dhabi, U.A.E.

Assignments, Duties & Responsibilities:

• Implementing the quality according to QA/QC plan for the overall project activities at the process, utilities & off site like:

(a) Civil work for several pipe rack foundations, circular tank foundations, equipment ( pump and vessel foundations ), flare foundations, sea water structures, paving, underground utilities etc.

(b) Bored pile activities prior for base preparation for foundations.

(c) Roads works.

(d) Fireproofing works for the different structural steel members (cast in situ).

• Perform preliminary field inspections/ surveillance and testing related to civil activities to ensure in compliance according to the established Inspection and Test Plan ( ITP), design drawings ( IFC), specifications and project safety program prior to raise inspection notification / request for inspection ( RFI) for client inspection and final approval it’s either backfilling & compaction test, reinforcing bar and form works, concreting ( fresh concrete testing, concrete temp. slump, workable time, air entrapment test etc.); post pour activities (curing; concrete surface preparation prior to application of concrete protective coating or final coating); grouting; leak test for underground utilities; material inspection as well as collection of soil / soil sampling & testing for lab. test.

• Prepare & issue notification for inspection and sign-off work inspection records after the completion of the joint inspection or test at site and filing / compiling all documents / reports for QA/QC records.

• Ensure that Quality Control requirements are fully and properly implemented on site.

• Day to day management of the works Quality Verification Files

• Monitoring Control of Inspection, Measuring, and Test Equipment and Calibration

• Control & monitor the quality of workmanship as per the specification and approved mock-up or sample

• Undertake Surveillance and follow up in area of responsibility.

• Identifying and reporting to the QA/QC manager any non-conformances.

• Control non conforming product, open, investigate and initiate any remedial action and/or mitigation measures to rectify and resolve non-compliance/ non-conformance.

• Follow-up corrective and preventive action

• Review and submission of test results of materials

• Ensure all inspections and tests undertaken are performed as planned/scheduled.

• Any other duties that are commensurate with role and project requirements.

• Coordinate third party testing agency activities

• Participate and recommend for necessary amendments of quality assurance and quality control procedures and other work instructions suit to actual site condition after thorough evaluations with some facts

• Participate in preparing ITP for each scope of work.

• Participate in the site internal and external audits

• Participate in the final handover of document against quality product.

• Adhere to safe working methods and participate in reporting.

 

5.0 October 2007 – February 2008
Third Party Inspector (TPI) . Work together with Foster Wheeler as part of the Project Management Company / Team –
Role: Quality Control
Bureau Veritas (mother company)
Abu Dhabi, United Arab Emirates

Company Industry: Quality Assurance, Health, Safety and Environmental (GHHE).Social Responsibility Industry providing tools and expertise to minimize risk, helping clients to move forward with confidence.

Onshore Gas Development III (OGD III), Process area , Abu Dhabi Gas Co. Industries (GASCO), Habshan Complex, Habshan, Abu Dhabi.

Assignments / Duties & Responsibilities:

• Implement & provide overall services for TPI works in the entire Onshore gas Development ( OGD ) III project at process and flare area for several pipe rack foundations; tank & vessel foundations; boiler & pump foundations; compressor & blower foundations; bund walls; evaporation pond; plant access roads; paving and underground utilities and pipe line in compliance with the IFC drawings, project specifications and safety program as well as other applicable codes and standards.

• Surveillance and monitor all ongoing site activities by the EPC contractor to ensure in compliance according to IFC drawings, project specification, safety and other project requirements.

• Perform inspection (check / witness ) according to EPC/contractor’s notification time request for civil/ structural and any related activities on site, material receiving, soil sampling collection at the borrow pit & testing ( lab. test ). Pointed out comments or punch points if any .

• Check / witness for backfilling & compaction test, reinforcing bar and form works prior to proceed for concreting, fresh concrete testing ( concrete temp. slump, workable time, air entrapment etc.), grouting, concrete surface preparation prior for coating, coating activities, leak test for underground utilities, material receiving / storage and handling as well as material sampling & testing ( lab. test ).

• Constant coordination with my colleague on site (PMC/PMT, EPC and the Sub Con etc.). Be fair and firm in dealings with them, consider the alternatives and consequences carefully before making decisions.

• Report questionable methods of operations by the EPC contractor to the TPI Team leader.

• Identifying and report directly to the TPI Team Leader and coordinate with EPC in-charge whenever problem, discrepancy / nonconformance in relation with the activities on site, assist and contribute remedial actions for immediate solution.

• Review all contractor documents for signature against project specifications and contract requirements.

• Adhere to safe working methods and adopt reporting procedures.

• Prepare daily and weekly technical report to be submitted to the TPI Team Leader in relation of the daily quality and other related activities at site.

 

6.0 March 2007 – September 2007
(At home for constructing 3 storey building owned by my brother in law).

 

7.0 December 2002 – February 2007
Q.C. Inspector (Civil / Structural )
Role: Q.C. Civil / Structural
Mohd Al-Mojil Group (MMG)
Dammam, Kingdom of Saudi Arabia

Company Industry: Engineering, Construction contractor and Maintenance at Onshore and Offshore in the Oil and Gas, Petrochemical, Water, Power and Industrial Sectors. Fabrication of Pipe works, Structural Steel works and Plate works.

Yanbu National Petrochemical Complex (YANSAB), Port site preparation, Fluor Arabia , Yanbu, K.S.A.

Saudi Arabian Fertilizer IV Exp. (SAFCO IV), Process area, Uhde Arabia Ltd., Jubail, K.S.A.

Jubail United Petrochemical Complex (JUPC), Utilities and offsite, Fluor Arabia, Jubail, K.S.A.

Assignments / Duties & Responsibilities:

• One of the inspectors employed by the company to oversee & implement the QA/QC management for the three projects mentioned above particularly in the process, utility, off site and tank farm at port area which involve different scope/contract like:

(a) Early works / Site preparation including access roads ( asphalt ), fence & gates, underground utilities temporary site offices within the plant compound

(b) Main process plants which involves civil works & concreting for the different foundations/structures like: turbine foundation, compressor, tank & vessel foundations, boiler and heater foundations, Ammonia & Urea structures. pipe racks, containment or bund walls, pump foundations, underground utilities, paving etc.

(c) Structural steel erection, plumb / alignment, bolt tightening activities in ammonia, urea building, compressor, flare structure, incinerator, pipe racks, boiler structures / frames etc.

(c) Concrete fireproofing for different vessels, inside heater equipment

(d) Metal cladding for the different structures.

• Conduct surveillance and preliminary inspection on the day to day activities on site in compliance according to the established Inspection and Test Plan ( ITP), design drawings ( IFC), specifications and project safety program.

• Raise notification for inspection or Request For Inspection ( RFI) for client inspection for any of the activities done on site, take client signature after joint inspection and compiling all documents for QA/QC records.

• Identifying and reporting to the site QA/QC manager any non-conformances / discrepancy in relation with the quality products and activities on site, Control / investigate and coordinate / contribute corrective actions with the site personnel as a result of quality systems in order to close non-conformances.

• Obtain client signature on various forms and verifying documents right after completion of the joint inspection or test at site and filing / compiling all reports for QA/QC records.

• To coordinate the activities of the third party testing laboratories to conduct in process testing and analysis to ensure that construction activities are in conformance with the project quality requirements.

• Keep all QA/QC records and ensure all quality control documentation is completed and competed for as built hand over through the QC turnover engineer.

• Participate in partial and final handover activities against project quality requirements. Review submittal documents as directed by QA/QC manager

• Participate in the site internal and external audits

• Adhere to safe working methods and report to the management / EPC contractor any accidents and any other activities related to safety on site.

• Prepare weekly technical reports to be submitted to the QA/QC supervisor in relation with the quality and other related activities on site.

 

8.0 January 1999 – November 2002
(At home for the both couples intention),

 

9.0 December 1996 – December 1998
Civil Engineer Jr.
Role: Site Engineer / Supervisor for Structural Steel Erection and Fireproofing
M.S. AL- Suwaidi Contracting
Rastanura, Kingdom of Saudi Arabia

Company Industry: Engineering, Construction contractor and Maintenance at Onshore and Offshore in the Oil and Gas, Petrochemical, Water, Power and Industrial Sectors. Heavy Equipment Services.

Yanbu Petrochemical Exp. Project (YANPET), Process and offsite/ utilities, Fluor Arabia, Yanbu, K.S.A.

IBN Rushd PTA Aromatics Plant, Process area, Chiyoda Petrostar Ltd, Yanbu, K.S.A

Assignments / Duties & Responsibilities:

• Carry out the overall site supervision for the daily work production of the structural steel erection and fireproofing (pre-cast & cast in situ) activities in compliance with the IFC drawings, safety rules & established procedures, ITP’s and as per project plan and schedule.

• Check / Ensure permit to work (PTW) has obtained prior to execute any activities on site.

• Check and monitor all the daily work productions, ensure all construction, safety and quality aspects are completely done ( to avoid or minimize rejection during inspection).

• Coordinate with my superintendent and submit inspection notification/ request to the QA/QC and third party testing agency whenever inspection or test to at site one day before the inspection / test schedule.

• Conduct daily tool box meeting with my team and superintendent at site in relation with the daily production, safety and quality aspects including some other site plan anticipation program.

• Immediate reporting to my superintendent whenever problems or discrepancy encountered related to the work activities at site. Take immediate action / resolution in compliance with the project requirements to enable to close out the issue.

• Prepare a week look ahead schedule/program as well as daily production/ technical reports to be submitted to my superintendent.

• Participate in the site internal and external audits.

• Participate on safety walkthrough/ walk down

• Maintain a detailed diary of the days work activities, issues, work approved or rejected, hours of operation, labor and equipment used, day works or site additional works and obtained signature to the main EPC in charge,

• Assigned in Engineering in a short period of time in the pipe spooling in every isometric drawings being issued at site.

• Conduct site inspection whenever site problems or queries to be resolved by site engineering services and give immediate report with the site engineering manager.

• Check actual pipe weld joints in one random pipe or one full length pipe at fabrication shop that will be reflected or marked up at the isometric drawings.

• Assigned as one of the line checkers prior to release for any tests ( hydro / pneumatic test )

 

10.0 May 1996 – November 1996
(in the Philippines still seeking for an overseas job)

 

11.0 June 1993 – April 1996
Civil Inspector
Role: Site Engineer/ Inspector
Cement Management (CEMA)
Paranaque, Metro, Manila, Philippines

Company Industry: Cement Plant Operation and Construction Management

Fortune Cement Plant Exp Project under Project Management Team, Batangas, Philippines

Bacnotan Cement Exp. Project under Project Management Team, Davao city,Philippines.

Assignments / Duties & Responsibilities:

• One of the client inspectors/ representatives to oversee the entire civil & structural steel erection and earthwork activities of the entire Fortune and Bacnotan Cement Expansion projects by main contractor as to ensure they shall perform in accordance with the project contract requirements, design drawings & specifications.

• Monitor, Inspect and record the works carried out by contractor on site and resolve all generated queries.

• Coordinate / review contractor’s one week look ahead schedule.

• Full review and sign off contractor’s QA/QC forms/records against project

• specification requirements.

• Participate / review contractor’s Method Statement, Inspection Test Plan etc. and incorporate comments for management final approval.

• Maintain records of site resources, daily progress of work, inspections, construction and workshop drawings, method statements and ITPs (Inspection test Plans).

• Review and takes any special note on the contract activities document submitted by the contractor for claims or billings to be submitted to my immediate superintendent for review.

• Monitor and resolve all punch points / lists through contractors.

• Prepare daily production and technical report to be submitted to my superintendent in relation of the daily activities at site.

• Participate in reviewing contractor’s drawings as well as their rebar cutting list.

• Check daily contractor’s work permit and safety requirements in every scope of works including material preservations.

• Participate on safety walkthrough/ walk down.

 

Seminars / Training:

Al Hosn Gas Hydrogen Sulfide (H2S) Training Standard Conducted by Gulf Human Resource Development. Est. at Al Hosn Gas main Office, Abu Dhabi, U.A.E. on June 22, 2012

Quality Awareness Training Course as per ISO 9001-2008 conducted by Al Jaber Energy QA/QC management at RRE/SK&EC Project, Ruwais, Abu Dhabi, U.A.E. at 14 of

 






popup-img