CV, Qatar based Process Engineer

Available
Serial No: 16852
Skills keywords: basic, detail, FEED, hazop

Short Bio:

I have more than 17 years of process design experience. Previously worked with Foster Wheeler, Technip, Qatar Kentz, Petrofac & Toyo Engineering consultancies.
Having experience of Basic, FEED, Detail & PMC in Oil&Gas, Refinery & Petrochemical projects.

Current location:  Doha, Qatar - View on map
Nationality: Indian
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: english
Location I am interested in working: Anywhere

Qualifications

D. E. Chemical Engineering
Board of Technical Education, Government of India
Passed with first class in 1996.

Member of Indian Institute of Chemical Engineers
(Membership Number: LM-45509)

 Career Summary

1) Company: Qatargas Operating Company Ltd, Doha Qatar
Period: Oct 2014 till present
Designation: Process Specialist

Projects Handled: Presently working on:

• Zekreet Project, Doha Qatar

Gasoline (75000 BPSD) Processing Facility

Preparation of Scope of Work for Licensor Bid

2) Company: Foster Wheeler International Corporation, Thailand
Period: April 2013 to May 2014
Designation: Sr. PMC Process Engineer

Projects Handled: Worked as Sr. PMC Process Engineer at home office (FW Thailand) for following units:

• Nghi Son Refinery and Petrochemical (NSRP), Vietnam

Overall Capacity: 200000 BPSD

Naptha & Aromatics Complex:

 Naphtha Hydrotreater

 Isomerization(PENEX)

 CCR

 Xylene Fractionation

 Parex

 Isomer

 Tatoray

 Sulfolane

 Benzene & Toluene Fractionation

Responsible for Review & Comment of following Process Deliverables received from EPC Contractor’s:

 PFD, H&MB, UFD, P&ID, Design Basis

 Design Philosophies: Isolation, Emergency Isolation, Overpressure Protection, Flare & Venting, Design Condition, P&ID Preparation etc.

 Process Equipment Datasheet

 Process Instrument Datasheet

 Relief & Blowdown Summary

 Utility & Catalyst – Chemical Summary

 Equipment List

 Plot Plan

• Star Petroleum Refining Public Co. Ltd (SPRC), Thailand

Preparation of P&ID Systemization work (including revamp project scope and turnaround scope markups).

Prepared P&ID Systemization Guidelines, procedures and reports.

3) Company: Technip, Abu Dhabi
Period: August 2012 to November 2012
Designation: Sr. Process Engineer

Projects Handled: Worked on the following project:

ADCO – Rumaitha North East CO2 Injection Project , Abu Dhabi

FEED Package preparation for CO2 Injection System (Package 3)

Updation of Process Description

Preparation of PFD, UFD, P&ID, Line Schedule, Tie-in Schedule & Isolation Philosophy. Process Input to Equipment List, Equipment Datasheet for Closed Drain Pump Closed Drain Drum

Markup of HAZOP nodes and participation in HAZOP

Preparation of PFS/PEFS Comment Resolution Sheet with reasons

Co-ordination & Inputs to downstream disciplines i.e. Piping, Mechanical Static, and Rotary, Electrical etc.

Participated in meetings with Client at various stages during FEED.

4) Company: QATAR KENTZ W.L.L, Doha , Qatar
Period: December 2009 to July 2012
Designation: Senior Process Engineer

Projects Handled: Worked on following proposals,

• ExxonMobil – Point Thomson CPF, Alaska

Design of 10,000 bbl/d Oil Production and Reinjection of 10200 psig gas to Injection Well.

Deputed to Singapore for 4 months to carry out Transition Engineering for the CPF (Central Processing Facilities) and associated Utilities.

HAZOP and HAZID study carried out.

Design of separators, Stabilizer and Injection Compressor’s.

Oil is transported to battery limits of plant and Tie-in to existing transport line. PW is treated and re-injected. Gas is also re-injected back to wells. Modularized equipment design to suit climatic conditions of Alaska. Design of all utility packages i.e. IA, N2, Diesel, FW, PW etc.

• Dijla Petroleum Company, Syria

Design of Khurbet East Field Central Processing Facilities (38000 BOPD)

The CPF project scope includes all design aspects associated with the development of a 38000 bbl/day Crude oil CPF, associated Crude Oil Export Line and re-routing of existing flow lines. Design of Inlet manifold, Test & Inlet Separator, Crude oil treater, Crude oil & Produced water storage tanks and associated utilities design. Responsible for making all process deliverables for proposal i.e. PFD, UFD, P&ID, Cause and Effect, Utility Summary, Instrument and Equipment Datasheet etc.

Storage and distribution of all associated Utilities for CPF

Instrument Air System, Fresh / Utility / Potable / DM Water Storage & Distribution System, Fire Water System, Fuel Gas

system, Fuel Gas Treatment Package, Process Flare, LP Tank Flare, Closed Drain & Open Drain, Diesel Storage and distribution system & 5 MW Power Generation using Reciprocating Gas Engines.

• ZADCO Produced Water Treatment Plant, Abu Dhabi

Worked as, Lead Process Engineer for this proposal, which consist of two Trains of 12,100BPD of Treated Produced Water. Treatment Package include design, procurement and construction of all equipments, technology to remove solids and dissolved H2S from inlet FEED Produced water.

Proposal scope also includes supply and design of utilities for new plant from existing utility headers.

• Nimr-G Development and Karim West Water Flood Project, PDO Oman

Worked as, Lead Process Engineer for this proposal, which consist of design, procurement and construction of new FWKO tank, MSV’s, CPI Separators and IGF vessels to cater increased produced water from additional wells from Nimr-G field.

5) Company: Petrofac Engineering India Ltd, Mumbai
Period: January 2009 to December 2009
Designation: Senior Process Engineer

Projects Handled: Worked on following project

• EL MERK CPF , Algeria

Design of Central Processing Facilities (99,000 BOPD)

Worked as Sr. Process Engineer and responsible for the oil section of the project. Work experience includes the process deliverables, interdisciplinary communication and clarification meetings with client for oil section of the project. Task includes finalization of P&ID’s, preparation of cause & effect diagram & preparation of safety valve datasheet etc.

Attended the P&ID clarification and design review meetings with client in Sharjah head office. Participated and represented the oil section in Hazop meeting in Sharjah head office. Prepared all the node markups, basic schemes for ready reference and given description of the node before start up of detailed analysis. Completed all the Hazop actions and issued the documents/drawings to client.

6) Company: TOYO ENGINEERING INDIA LTD, Mumbai
Period: 1997 to 2008
Designation: Senior Process Engineer

Projects Handled: Joined as Trainee Engineer in 1996.

Worked on various International projects such as Middle East, Brazil etc.

• Shell Eastern Petrochemical Company, Singapore

Ethylene Cracker Unit

Detail Engineering

Worked on the methaniser, ethaniser, propaniser and debutanizer section of the project. Responsible for the detailed engineering activities of the project. Also work includes interdisciplinary

Communication and communication with ABB Singapore and Netherland offices.

Worked on design and detailed engineering activities of ethylene storage tank of the same plant.

• Abu Dhabi National Oil Refining Company, Abu Dhabi

Flare Gas Recovery Project

Detail Engineering

• Propylene Recovery Unit, Vietnam

Sour Water Stripper Unit, Vietnam

Deputed to Japan (8 Months) for preparation of basic engineering package.

• Bharat Petroleum Corporation Ltd, Mumbai

Lube Oil Base Stock (LOBS Unit)

Detail Engineering

• JUEG, Saudi Arabia

Ethylene Oxide & Ethylene Glycol

Deputed to Japan (3 Months) for preparation of Precommissioning Manual.

• Gas Separation Plant-5, PTT Thailand

Ethane Treatment Unit

Deputed to Japan (3 Months) for preparation of basic engineering package.

• Petrobras Refinery, Brazil

Delayed Coking Unit

Detailed Engineering

 

 

 






popup-img