I have a bachelor’s degree in Mechanical Engineering and certification in CSWIP 3.2 Senior Welding Inspector, NACE Coating Inspector - CIP Level 2(Marine), API 653 Aboveground Storage Tank Inspector, API 570 Piping Inspector, API 580 Risk- Based Inspector (RBI) and API 510 Pressure Vessel Inspector. I have completed OPITO approved BOSIET training. I have more than 20 years of experience in OIL & GAS field.
EDUCATIONAL QUALIFICATION
Bachelor of Engineering (Mechanical)
I.R.T.T., Erode / Bharathiar University, Coimbatore / India.
CERTIFICATIONS
ASNT Level – II in UT, RT, MT & PT
CSWIP 3.2.2 Certified Senior Welding Inspector (# 40718)
NACE Level 2 Certified Coating Inspector ( # 26013 )
IRCA Certified ISO 9001:2000 Lead Auditor
API 653 Above Ground Storage Tank Inspector ( # 40248 )
API 570 Piping Inspector ( # 45807)
API 580 Risk- Based Inspector (# 48396)
API 510 Pressure Vessel Inspector (# 48621)
OPITO approved Basic Offshore Safety Induction and Emergency Training(BOSIET)(#64765700100713796)
COMPUTER KNOWLEDGE
Post Graduate Diploma in Computer Application (PGDCA)
DETAIL OF EXPERIENCE
1. Employer : Tecnicas Reunidas SA, Volgograd, Russia
Position : QA QC Engineer
Duration : July 2011 to November 2014
Client : Lukoil, Russia
Project : Vacuum Gas Oil Deep Conversion Complex (1st Stage)
Client : Al Hosn Gas, UAE
Project : SHAH Gas Development Project
Client : ADCO, UAE
Project : SAHIL & SHAH Full Fields Development Project
Duties : Preparing project quality documents. Inspecting incoming materials of Pipeline, Piping and Tanks. Inspecting/monitoring daily welding and painting/coating activities. Reviewing NDT and other inspection reports.
2. Employer : Germanischer Lloyd (GL), UAE
Position : Inspection Engineer
Duration : May 2010 to May 2011
Client : GASCO, UAE
PMC : Worley Parsons
Project : ASAB Lean Gas Pipeline Project –
95 Km, Ø 36”/ 20”/ 12” Gas Pipeline
Client : IPIC(International Petroleum Investment Company)
EPC Contractor : China Petroleum Engineering & Construction company
Project : Abu Dhabi Crude Oil Pipeline Project (ADCOP) –
370 Km, Ø 48” Habshan to Fujairah Pipeline
3. Employer : Punj Lloyd, Qatar
Position : QA/QC Engineer
Duration : February 2009 to December 2009
Client : Qatar Petroleum
Project : Strategic Gas Transmission Pipeline Project (SGTP)–
220 Km, Ø 36” Ras Laffan to Mesaieed Pipeline
4. Employer : Mun Siong Engineering Pte Ltd, Singapore
Position : QA/QC Engineer
Duration : March 2007 to January 2009
Owner : Shell Eastern Petroleum (Pte) Ltd
Client : Chiyoda Singapore (Pte) Ltd
Project : New & Improved Sour Water Stripper 1& 2
Client : Foster Wheeler Asia Pacific (Pte) Ltd
Project : Bukom Refinery Modifications Project
5. Employer : Wong Hing Long Technologies Pte Ltd, Singapore
Position : QA Engineer
Duration : January 2007 to March 2007
Client : Singapore Defense Service
Duties : Preparing Quality Assurance related documents for shop
Fabrication
6. Employer : Industrial Engineering and Inspection Services,
Chennai, India
Position : Inspection Engineer
Duration : June 2006 to December 2006
Client : Andra Pradesh Paper Mill, Rajahmundry
Project : APPM-Mill Development Plan (Single Digester Paper
Project – ANDRITZ, Finland technology)
7. Employer : Jeckson Engineers & Fabricators, Surat, India
Position : QA/QC Engineer
Duration : August 2002 to February 2006
Client : Gas Authority of India Limited (GAIL)
Project : Jamnagar – Loni Pipeline Project Phase II –
63 Km, Ø 12” / 8” Kandla – Samaikhyali LPG Pipeline
Client : Gas Authority of India Limited
Project : Dahej (Gujarat) – Vijaipur (MP) Gas Pipeline Project–
610 Km, Ø 42” Gas Pipeline
Client : Reliance Petroleum Limited
Project : Jamnagar Refinery Project
8. Employer : Hindustan Engineers, Surat, India
Position : Piping Engineer
Duration : February 1999 to June 2002
Client : Indian Oil Corporation of India Limited, Baroda
Project : Gujarat Refinery Expansion Project
Client : Reliance Petroleum Limited
Project : Jamnagar Refinery Project
Duties : Fabrication, Erection and Testing– Piping and
Related facilities
9. Employer : Suyog Engineers Pvt. Ltd., Mumbai, India
Position : Fabrication Engineer
Duration : November 1996 to December 1998
Client : Gujarat Alkalies and Chemical Limited (GACL)
Activities : Fabrication of Surface condenser & Deaerator
@ L& T, Hazira
Client : Indian Petrochemicals Corporation Limited (IPCL)
Activities : Fabrication of Demethaniser, Surface condenser
& Column for Vinyl chloride monomer @ L&T, Hazira
Client : Reliance Industrial Limited, Hazira
Project : Polypropylene Plant
Duties : Fabrication, Erection and Testing – Tanks and
Pressure Vessels
10. Employer : Kanaka Durga Engineering, Rajahmundry, India
Position : Engineer
Duration : May 1992 to October 1996
Client : Gas Authority of India Limited
Project : Tatipaka – Kakinada Gas Pipeline Project –
90 Km, Ø 18” / 12” Gas Pipeline
Client : Gas Authority of India Limited
Project : KG Basin Gas Pipeline Project –
19 Km, Ø 18” Kakinada – NFCL Gas Pipeline
Duties : Fabrication, Erection and Testing -Pipelines, Tanks and
Pressure Vessels
PROFESSIONAL SKILLS
Preparation of Project Quality Plans, Quality Management Procedures, Quality Control Procedures, Inspection and Test Plans and all other documents according to company QMS and Client Specifications
Involving in Internal/External Quality Auditing. Raise NCRs in case of non-compliance and ensure timely execution of corrective and preventive actions
Evaluation and approving contractors Quality Control Procedures, Inspection and Test Plan, WPS/PQRs and other documents.
Coordinating with Material Controller for Incoming material Inspection. Monitoring MRIR preparation and proper material storage as per requirement.
Preparation and qualification of various WPS/PQRs’ as per Client Specifications & applicable codes.
Performing Welder Qualification Tests for various welding procedure specifications as per Client specifications and Codes. Preparing and monitoring weld rejection rates for each welders and initiate necessary corrective action.
Stage wise Inspection of aboveground steel Tanks construction and witnessing various tests conducted as per Code API 650.
Review and approval of contractors’ Painting/Coating Procedures, Inspection &Test Plan and all other documents as required for project specification requirements.
Checking/monitoring weather conditions before and during the coating process, surface preparation, paint mixture, DFT measurement, destructive tests such as adhesion test, visual inspection & holiday test on finished product for various type of paints and coating like FBE, PE, PP, PUT etc.
Coordinating and Monitoring of various activities such as stringing, cold bending, welding, NDT, coating, painting, lowering, pigging & hydro test.
Coordination and control of QA/QC inspectors and NDT crews to carry out inspection and test requirements as per the contracts. Liaise with Client and Third Party Inspectors in pursuance of and compliance with contractual obligations.
Conversant with International codes like API 1104, API 5L, API653, API650, ASME Section II, V, VIII, IX, B31.3, B31.4, B31.8, ASTM, ISO and NACE standards.