CV, Philippines Based Civil Engineer Looking Globally

Available
Serial No: 35744
Skills keywords: civil engineer, resident engineer, site construction engineer, sr. civil engineer

Short Bio:

I am A Civil Engineer by profession, an innovative and diligent team player possessing interpersonal and problem solving skills, coordination and time management skills, with strong analytical mind-set to learn quickly and confidence to take up new challenges, ability to build effective working relationships, internally and externally,work cooperatively and seek relevant advice/information from appropriate people and sources.

Current location:  Vigan City Philippines - View on map
Nationality: Filipino
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: english, Tagalog
Location I am interested in working: Anywhere

Profile

A Civil Engineer by profession, an innovative and diligent team player possessing interpersonal, coordination, problem solving, and time management skills, with strong analytically mind-set to learn quickly and high confidence to draw estimation & take up new challenges, ability to build effective working relationships, internally and externally, work cooperatively and seek relevant advice/information from appropriate people and sources, contribute to the culture of working in partnership and delivering capacity through good quality, pioneering and decisive approach, able to work effectively and flexible within a team environment, with more than 22 years of experience in the engineering and construction field, particularly in the areas of site infrastructure, facilities, roads, Civil/Structural, including horizontal and vertical construction, Currently working as Civil/Structural Engineer @ Saudi Arabian Parsons Limited in Dammam, KSA. Previously worked as a Sr. QA/QC Civil Engineer for Doosan Heavy Industries and Construction Co. Ltd. in Yanbu, KSA, Civil Engineer for Technical Resources Ltd. in Amman, Jordan, worked as a QA/QC Civil Engineer of Doosan Heavy Industries and Construction Co. Ltd. for EPC Project in Abu Dhabi, UAE. Worked as a Field/Office Engineer involved in Estimate, Design and Construction and Part Time Instructor on the College of Engineering at the University of Northern Philippines. QA/QC Civil Engineer for the EPC Project on Great Man Made River Project of Dong Ah Consortium in Libya, Also worked as an Assistant Supervisor for Bin Jarallah in Najran, Saudi Arabia, involved in Road construction, Telephone line installation and Building Construction. Also experienced in Construction contract management and documentation. Computer Literate such as Microsoft Office, Adobe Acrobat & Auto cad.

Passed Civil Engineering Licensure Examination
July 05, 1995 Professional Regulation Commission, Manila, Philippines
Licensed Number 73136

 

Education

Primary
Cabaroan Community School June, 1972 to March, 1978
Vigan City, Philippines

Secondary
Ilocos Sur Nat’l. High School June, 1978 to March, 1982
Vigan City, Philippines

Tertiary
National University  June, 1982 to April, 1987
Manila, Philippines

Degree: B. S. In Civil Engineering
Access Computer Institute  Dec., 1987 to Feb., 1988
Quezon City, Philippines
Degree: Computer Aided Design

 

Professional Experience

August, 2014 to February, 2016
Saudi Arabian Parsons Ltd.

QA/QC/Civil Engineer Dammam , Saudi Arabia

• Oversee the design and construction aspects of assigned on all civil projects.

• Involve in groundwork and review of A & E and statement of work (SOW).

• Interact with civil engineers/other discipline for different projects.

• Attend Work Inspection Requests, witness and verify that construction activities and execution are in accordance with approved drawings, method statements / specifications and other material submittals, etc.

• Collaborate with senior consultants to execute risk analysis studies.

• Be aware of project progress and be able to discuss technical aspects of the role with the client if required.

• Execute risk management processes and construction frameworks.

• Lead and participate in various inspections of Infrastructures related projects such as Sewer, Storm, Drainage manholes, including house connections, Irrigation, Potable Tanks and other water retaining structures.

• Engage in the implementation associated with the development of Roads and Highways. Physical inspections including alignment setting out with level survey checks. Soil sampling and testing checks in formation, general fill, sub base and road base materials.

• Provide regular information to Engineers and Inspectors with regards to all site

Activities including work progress, quality and health and safety issues.

• Prepare defects lists for inspected works and issue non compliance reports for non

Compliant works.

• Monitor the assigned scope to ensure Contractor performs all work s to agreed standards for Safety, Health and Environment and demonstrate a commitment to attaining high levels of HSE (Health, Safety & Environment) performance.

Project Undertaken:

 Infrastructures
Description: Storm/Sewer/Road/Buildings/Housing/School etc.
Client/Owner: Ministry of Housing
Estimated Project Value: SAR 250 Billion

 

April, 2013 to April, 2014 Doosan Heavy Ind. & Construction Co.
Sr. QA/QC Civil Engineer Yanbu , Saudi Arabia

•Ensuring that construction procedures are included in the Site Quality System.

• Experienced of implementing quality procedures and documents as well as conducting internal audits producing quality manuals and implementing KPI’s.

• Ensuring that construction personnel are indoctrinated in and appropriately trained as specified in the QMS.

• Ensuring through auditing or surveillance activities that the site construction personnel comply with applicable inspection and testing procedures included in the Site Quality System.

• Review and verify quality assurance and quality control programs, inspection and test plans, installation, testing, and as built procedures for all civil engineering system and comments for transmittal for sub-contractor.

• Ensure that quality control inspections are constructed according to the contract, applicable codes, standards, approved drawings and specifications.

• Verify that adequate personnel are assigned to inspect or witness quality activities performed by contracted personnel.

• Review documentation produced by contracted personnel to ensure it is complete, accurate and being generated in a timely manner.

• Attending and providing for daily progress meetings with the consultants.

• Conduct inspections for safety, health, environmental and other activities on the projects.

• Arrange meetings between sub-contractors an concerned departments/organization to resolve interfacing problems during construction.

Project Undertaken

 Water Treatment Plant and Infrastructures
Description: Engineering Procurement and Construction
Client/Owner: Saline Water and Conversion Corporation
Estimated Project Value: SAR 3.82 Billion

Reason for Leaving: Looking for better opportunity

 

June, 2011 to March, 2012
Technical Resources Ltd.

QA/QC Civil Engineer Amman, Jordan

• Review and make a workable structural system including work plan from an architectural design plan.

• Coordinate with other designers, including architects to reach agreement about safe designs and how they may fit in with the aesthetic concept of the construction.

• Review the Structural drawings, reports and specifications at each stage of the Design to ensure completeness, correctness and compliance with the scope of work and agreement requirements.

• Carry out constructible review during the design and modification stages.

• Ensure to incorporate the comments raised from previous stages.

• Coordinate with Document Controller and Project Manager, QA/QC Manager to ensure that all Documents related to his discipline are properly controlled.

• Review any alternative to the Design concepts, prepare and submit a report including recommendation to the Engineering Manager highlighting advantages and disadvantages of each alternative.

• Also conduct inspections for safety, health, environmental and other activities on the projects, like construction of Evaporator Foundations, , Diaphragm Wall, Sea Water Intake Pumping Station, Deaerator , Brine Heater, Construction of Temporary Jetty and other offshore works such as Intake and Outfall structure. And also Buildings and Road constructions.

Project Undertaken:

 Water Treatment Plant and Infrastructures
Description: Design Industry.
Client/Owner: Ministry of Municipalities and Public Works (Republic of Iraq)
Funded by World Bank
Estimated Project Value: USD 50 Million

Reason for Leaving: Project Completion

February, 2009 to March, 2011
Doosan Heavy Ind. & Construction

QA/QC Civil Engineer Abu Dhabi, UAE

• Involves in assisting the QC Manager concerning the progress of the construction projects. Including the implementation of Project, Health, Safety and Environment Plan and procedures.

• Liaise with the consultants and sub contractors, maintaining all files associated like ITP’s, Change orders, NCR’s, CAR’s and RFI’s, and other concerns with the project of Desalination/ Industrial plant.

• Conduct inspections for safety, health, environmental and other activities on the projects, like Bored Piling, Pile Head Cutting, Construction of Evaporator Foundations, Deaerator , Brine Heater, Erection of Potable Water Tanks Foundations, Diaphragm Wall, Sea Water Intake Pumping Station, Paintings of buildings and Road construction.

• Also responsible for the inspection of corrosion protection application prior to backfilling. If problems arising during the execution of the job, find immediate solutions to ensure the continuity of work.

• Participate in tender process, as relevant.

• Focus on Quality including site visit.

• Review contractor’s Quality related project documentation.

• Review contractor’s implementation of Quality management and Quality Control plans including ensuring quality surveillance/ verification process is in place.

• Also plan and monitor tests and perform inspections to ensure that quality control analysis is conducted properly.

• Regularly document the procedures and findings, complete statistical evaluations to analyze trends, and write reports.

• Liaise with clients, EPC contractor and others to monitor, control to deliver a successful projects.

Project Undertaken:

 Independent Water & Power Project JV with Samsung Engineering & Construction
Description: Desalination Plant
Client/Owner: Ruwais Power Project
Estimated Project Value: USD 2.2 Billion

Reason for Leaving: Contract Completion

November, 2006 to January 2009
University of Northern Philippines

Field/Office Eng’r / Part Time Instructor Vigan City, Philippines

• Conduct design/estimate for structural projects of the university and to ensure that the available funds will be utilized for the projects.

• Supervised and conduct inspections for the activities on the projects of the university, so that if problems arising during the execution of the job, find immediate solutions to ensure the continuity of work.

• Check all quantities of work involved in the project, coordinate with the representative engineers and evaluate the change order being claimed by the contractor.

• Conduct teaching profession in the College of Engineering at the university.

Project Undertaken:

 Schools and Infrastructures
Description: Road/Buildings/Hospital/Dormitories etc.
Client/Owner: University
Estimated Project Value: PHP 34.6 Million

Reason for Leaving: Project Completion

April, 1996 to April 2002
Dong Ah Consortium

QA / QC Civil Engineer Tripoli, Libya

• Provide QA/QC activities in carrying out inspection on site as per company specifications.

• Monitor construction activities, Record in the inspection report for non- conformances identified, which can be brought to conformances by the used of approved procedures.

• Conduct inspection such as construction of Well Lateral, Overflow Vent structure, Air Valves, Forebay Tanks, Pumphouse, and other Hydraulic, Earth and Water retaining structures.

• Also conduct inspection for the application of corrosion protection to the Hydraulic and Earth retaining structures prior to backfilling.

• Participate in inspecting of Pre cast Concrete Cylinder, and Ductile iron pipe gaps, in core repairs if any, conduct air testing before welding commenced on the internal joint prior to internal grouting.

• Conduct final inspection on the pipes prior to conduct start hydro test.

• Preparing Field Change Request, As Built conditions, checklist and documents for P.C.S. (Process Control Sheets) to be submitted to the consultant for approval, prior to submit P.V.C. (Progress Verification Certificate).

• Liaise with clients, owner’s representative to monitor and deliver a successful projects.

Project Undertaken:

 Great Man Made River Project Phase II
Description: Water Supply for the people of Libya.
Client/Owner: Libyan Government
Estimated Project Value: USD 4.6 Billion

Reason for Leaving: Contract Completion

August, 1993 to February 1995
Dong Ah Consortium

QA / QC Inspector Tripoli, Libya

• Inspection for the excavation of trench and established control points for the bedding and invert elevation of the Pre cast Concrete Cylinder Pipes and Ductile Iron Pipes to be laid.

• Participate in inspecting site equipments including valves, piping system, and lifting equipment through out the site as per company specifications.

• Provide QA/QC activities in carrying out physical inspection of materials on site, at Company warehouse or at supplier premises such as Pre cast Concrete Cylinder Pipes, Ductile Iron Pipes, gaskets and check conformance with contractual specifications.

• Conduct inspection of Pre cast Concrete Cylinder Pipes and Ductile Iron pipes for repair, prior to execute pipe laying on site.

• Checking of pipe alignment, gaps, in core and out core repairs if any. Conduct external grouting and denso wrapping inspection prior to backfilling of the pipe.

• Prepare daily reports on field condition and construction activities.

Project Undertaken:

 Great Man Made River Project Phase II
Description: Water Supply for the people of Libya.
Client/Owner: Libyan Government
Estimated Project Value: USD 4.6 Billion

Reason for Leaving: Contract Completion

October, 1990 to November, 1992
Bin Jarallah
Assistant Supervisor Najran, Saudi Arabia

• Prepare construction activities, scheduling, utilization of manpower and equipment, so that problem arising during the execution of the job and find immediate solutions to ensure continuity of work.

• Supervised the excavation of trench for cable laying and termination of cables prior to continuity test for telephone cables.

• Supervised earthworks on road construction and the establishment of control points for the desired grade and elevation.

• Supervise the establishing of elevations on the drainage structure such as box culverts according to plans and specifications.

• Also supervise the quarrying, stockpiling of earth into the project site just to ensure that the materials to be used are acceptable based on laboratory testing.

• Assist the supervisor and participate in inspecting the construction workforce in the execution of the job according to plans and specifications, checking out construction programs

• Maintain instrument, tools and equipment in proper working condition to avoid delay in the job site.

• Organized, maintained necessary documents. Prepare site inspection report to the supervisor regarding findings and results.

• Check and evaluate all quantities of work involved.

Project Undertaken:

 Telephone and Road Construction Project
Description: Project for the people of Najran, KSA
Client/Owner: Ministry of Communication
Estimated Project Value: SR 89 Million

Reason for Leaving: Contract Completion

September 1987 to June, 1990
Morales Eng’g and Construction Co.

Civil Foreman Quezon City, Philippines

• Responsible in monitoring the works of the crew to ensure that the tasks are well carried out according to plan.

• Prepare construction activities, organized and supervised the construction team in the execution of the layout design, according to plans and specifications, checking out effecting construction programs.

• Scheduling and utilization of manpower and construction equipment. Assist the project engineer in the preparation of change order and price adjustment.

Coordinate with representative engineers of the client.

• Make sure that safety precautions will be followed as well.

• Report to the site engineer regarding findings and result.

Project Undertaken:
 Vertical Construction
Description: Building Construction
Client/Owner: St. Margaret Realty
Estimated Project Value: PHP 7 Million

Reason for Leaving: Contract Completion

December 1985 to April, 1987
Sn. Lorenzo Ruiz Builders & Dev. Group.

Draftsman / Survey Aide Quezon City, Philippines

• Assist the Survey Engineer in preparing technical descriptions, plans and computations of lot areas.

• Also assist the survey party in conducting field survey for lots and establishing the location of construction monuments, property monuments, section corners, curb and gutter, sidewalks and drainage structures.

• Take and records field information (notes and drawings) in the fields and then prepares rough drafts of said information as directed.

• Set up and operate level, transit, and distance meter.

• Drafting of location plans, estimate and preparing bill of materials.

• Prepare site inspection report.

Project Undertaken:

 Horizontal/Vertical Construction
Description: Road/Building Construction
Client/Owner: Owner/Developer
Estimated Project Value: PHP 12 Million

Reason for Leaving: Contract Completion

 

Seminars & Commendation

• Technical Research and Fire Safety Seminar
Philippine Inst. for Civil Engineer

• Seminar-Workshop on Teaching Learning Styles (Dunn & Dunn Method)
International Center For The Study Of Teaching-Learning Styles (ICSTLS)

• Thermo VAR Plumbing Seminar
Philippine Inst. for Civil Engineers

• Seminar on Accessibility
UAP Ilocos Ciudad Fernandina Chptr

• Seminar on Construction Safety
University of Northern Philippines

• Scientific Seminar in the  ‘Litsea Glutinosa “Sablot”Propagation
University of Northern Philippine

• In service Training and Workshop For Effective Teaching
University of Northern Philippine

• 7th Region I / Car West  Technical Seminar
Philippine Inst. for Civil Engineer

• Enhancing Faculty Capability Updates on Trend & Issues In The Disciplines & Professions
University of Northern Philippine

• Appreciation Seminar on Water Supply & Development
Philippine Water Works Association

• Letter of Commendation
Dong Ah Consortium

• Safety, Health and Environment Award
Ministry of Housing / S. A. Parsons Ltd.

 

 






popup-img