28 years of extensive experience in project management and project controls. Responsible for overall Construction works, Quality control, HSE Management System, Retrofitting (UAE, USA and Pakistan) and excellent communication skills. Accepts new challenges.

Current location:  Abu Dhabi, United Arab Emirates - View on map
Nationality: Pakistan
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: english, Hindi, punjabi, Urdu
Location I am interested in working: Anywhere

Qualifications

B.Sc. Civil Engineering October 1986
University of Engineering and Technology Lahore.

Training and Certifications:

Project Management Professional

PMI-Risk Management Professional

PMI-Scheduling Professional

Construction Management.

Managing Safely by IOSH.

Career Summary

CH2MHILL VECO Engineering
Period: – Jan 2012-Present
Position: – Civil Specialist
Project: GAS Gathering Works, Shah Gas Development Program
Client: – Al Hosn Gas

Responsibilities:-

• Review Drawings, Specifications, Method of Statements, Material Submittals, ITP and work procedures in the proper implementation of construction work. Update relevant information with regards to the documents and to direct the guidelines, work procedures and status accordingly.

• Monitor, investigate and conduct control management systems on how resources been utilized and provided at site with regards to the manpower, equipment distribution and utilization.

• Review and implement procedures, sequences and methodology of construction as required in DGS, Method Statement, IFC Drawings Specifications and ITP in conformance to the Quality Assurance and Quality Control issues. And to develop strong guidelines and procedures on how to properly implement work of the project without compromising the Quality issues, HSE measures and the target completion in general.

• Analyze Trends: Analyze actual costs vs. plan costs, Develops financial forecasts, maintains work in progress figures

• Conducting the risk analysis meetings and develop the appropriate responses.

• Conducting risk audits at site and evaluating the effectiveness of risk responses.

Germanischer Lloyd, UAE
Period: – February 2011-Dec 2011
Position: – QA/QC Team Lead
Project: Early Works Package 9 Shah Gas Development Program.
Client: – Al Hosn Gas

Responsibilities:

• Responsible to supervise the Inspectors.

• Verify that the quality related site activities are in accordance with the applicable codes.

• To ensure that all execution and inspection are carried out as per inspection plan / drawings / codes & specifications.

• To certify all necessary inspections during various stages of site activities as per approved inspection and test plan.

• Control all nonconformance reports and undertake remedial action.

• To co- ordinate with client, suppliers and consultant for site activities.

TECHNO ENGINEERING SERVICES, UAE
Period: – August 2009- January 2011.
Position:-Construction Manager
Project: – Main Oil Terminal Fujairah, ADCOP
Client:- IPIC
Consultant: – ILF/ GL
Contract Value: – USD 240 Million.

The Project is in Fujairah (UAE). A Main Oil terminal (MOT) located on the Fujairah coastal plain with a working storage volume of 7 MMbbl (currently 7 storage tanks and 1 back up tank);

Responsibilities:-

• Plan, organize, direct, control and evaluate project according to schedule, specifications and budget.

• Review and approve construction schedules and milestones and monitor progress against established schedules.

• Review the program using Primavera P6, analysis of the logical relationships, durations and manpower & productivity rates.

• Critical Path Analysis.

• Prepare sub contracts and negotiate revisions, changes and additions to contractual agreements with consultants, clients, suppliers and subcontractors.

• Review and approve quality control programs.

• Participate in data gathering activities and risk identification and assessment studies.

• Identification of potential risks which might hinder the success of project.

• Identification of opportunities which might positively improve the project performance.

• Evaluation of the risk level and its manageability, setting up Risk Register.

• Timely update of Risk Management Plan and Risk Register.

• To take ownership and provide direction to engineers through ability to prepare and author full suite of project safety deliverables.

• Prepare progress reports and issue progress schedules to clients.

• Direct the purchase of building materials.

• Hire and supervise the activities of subcontractors and subordinate staff.

ATHENA, UAE
Period: – September 2007- July 2009
Position: – Construction Manage
Project: – Khor Fakkan Port Expansion
Client – Sharjah Ports Authority
Consultant: – Halcrow International Partnership
Contract Value: – DHS 320 Million.

The port expansion comprises the development of a 435-m long quay wall and reclamation of 13 hectares of land available for container storage. The scope includes excavation of the wall foundation, casting and installation of mass concrete blocks for quay wall, placement of fill material behind the wall, pilling and reinforced concrete works for crane beam, installation of crane rail, supply and installation of quay wall furniture, interlock block paving along apron and construction of substations.

Responsibilities:-

• Analyzes, evaluates, and forecasts current status against an established baseline schedule. Assesses the impact of design or construction changes and schedule slippages.

• Manages a team of Project Control Engineers who are qualified to analyze, evaluate, and forecast project costs, as well as performance against an established schedule with critical milestones.

• Preparation of method statements for the site activities in cooperation with the Section head Engineers.

• Negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.

• Hire and supervise the activities of subcontractors and subordinate staff.

• Requisition supplies and materials to complete construction project.

• Review the budget estimates, progress and cost tracking reports.

• Review and approve quality control programs.

• Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.

• Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.

• Manage a group of 980 construction personals.

Taameer Associates. Rawalpindi. Pakistan
Period: – September 2005-August 2007.
Position: – Project Manager
Project: – Construction of National Center for Physics Islamabad.
Client: – Govt. of Pakistan.
Consultant: – Nasir Saeed and Associates.
Contract Value: – 320 Million Pak rupee.

Special Features of the Project are Re- strengthening of existing facilities by retrofitting to make it Earthquake proof and to build the new facilities.

Responsibilities: –

• Get the work done according to the contract agreement, codes and specifications. Defining relationships.

• Ensure the health of the project.

• Manage the finances and execute the work to the satisfaction of client and company.

• Maintain the healthy working environment.

• Award the work to the subcontractors and negotiate the rates.

• Planning the work well in advance to make sure the timely completion of the project.

• Manage the resources, company’s staff and labor.

• Manage a group of 1300 construction personals.

The project was completed and handed over well in time according to specifications, drawings and within the allocated budget by the company.

S&K Construction Co. Inc. (USA)
Period: – October 2003-August 2005.
Position:-QA/QC Manager
Project: – Extension of Emergency Unit Nayak Hospital New York.
Consultant: – R&S Consultant.
Contract Value: – USD 205 Million

Responsibilities:-

• Responsible for maintaining the project assurance system for construction in accordance with project’s scope of work.

• Assuring compliance of Engineering, Procurement and Construction works to be done in accordance with the proposed PQP and ISO standards.

• Managing and performing the Internal Audit Program for the company, ensuring that the work is conformance to the Project Quality Plan ( PQP) and ISO standards.

• Implementation of field inspection procedure.

• Verification of effectiveness and adequacy of project quality system by monitoring the quality activities during the construction.

• Development of the execution PQP including Inspection Test Plan (ITP) and audit schedules.

• Maintain a project non –conformance register, follow up to close NCR.

• A direct line with the client Engineers and authorized to act on behalf of contractor on QA/QC matters.

• Managing Quality Control staff including technicians in the testing laboratory.

Brook Island Contracting Corp, (USA)
Period: – January 1994-September2003
Position: – Project Manager/Engineer:-

Worked on commercial buildings and recreational projects. Improvement of Brooklyn Beech New York.

Responsibilities:-

• Review and deliver Approved Drawings and Specifications, Method of Statements.

• Material Submittals, ITP and work procedures in the proper implementation of construction work.

• Update relevant information with regards to the documents and to direct the guidelines, work procedures and status accordingly.

• Supervising and guiding the site engineers and foremen.

• Coordination with state departments, Consultants,

• Preparing Daily schedule. Staff and labor management,

• Preparing purchase orders,

• Assuring quality and timely completion of work.

Shaheen Enterprises, Pakistan.
Period: – November 1988-December 1993
Position: – Project Manager

Construction of Government and Residential buildings, Water Supply Works. Worked on Industrial and commercial buildings.

Responsibilities: –

• Liaison with the Govt. Departments and consultants.

• Coordinate all the construction activities

• Monitoring and controlling the construction activities.

• Resource leveling.

• Ensure the health of the projects.

• Plan the work well in advance. Team Building.

• Manage the resources.

• Ensure implementation of safety procedure at every level of the construction

Naqvi & Saddiqui Architects and Engineers, Pakistan
Period: – November1986- October 1988
Position: – Assistant Engineer

Worked as consultant on government buildings, road projects, Industrial Buildings and private houses in Islamabad.

Responsibilities:-

• Structural designing of buildings, Mosques, Textile Mills.

• Preparing the tender documents, specifications,

• Prequalification of the Contractors and floating the tenders,

• Comparing the tenders and the rates quoted by the contractors.

• Liaison with government departments.

• Site visits and quality assurance.

 