CV, Operations manager looking for work

Available
Serial No: 41725
Skills keywords: 

Short Bio:

An Engineer with over 12 years experience in the field of QA/QC and Project Management in Oil and Gas, Engineering and Construction Industries. Possessing a wealth of Quality Inspection, Audit expertise and a proven ability of successful project completion, consistently achieving significant quality objectives for organisations in the area of Welding Inspection & NDT, Pipe Line/Piping Inspection, Plant Inspection/Asset integrity, Engineering and Construction, Coating/Painting, Document Control a

Current location:  Federal Capital Territory, Nigeria - View on map
Nationality: NIGERIA
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english, french
Location I am interested in working: Anywhere

EDUCATION

 

Bachelor of Engineering (B.Eng.) in Chemical Engineering                                            1998-2003                

Enugu State University of Science and Technology (ESUT) Enugu.


PROFESSIONAL EXPERIENCE

 

2013 – Date:     Enak Energy Services Ltd Eliada Rumuogba Port-Harcourt, Rivers State.

                         Head of Operation                       

 

Headed and managed a team of approximately 100 employees in a busy work environment in 7 different locations; EPC-Pipe flow lines, Storage Tank & Vessel construction, Facility piping &FPSO maintenance, 330 kVA Power Transmission Line, Bridge and Communication Tower constructions. Driving operational improvements, maximizing the value of the asset base while ensuring a tight control on operational costs

 

Activities and Achievements

Slashed project costs 5% by executed 68km, 24, 8, 6, & 3 inches pipes Oil, Gas and Water Injection flow lines Frontier/Septa Energy JV before the project Schedule deadline date.

Supervise rehabilitation of NNPC 70,000bbl crude storage tank at Port-Harcourt Refinery.

Supervised the construction of LBnerg 8,000bbl twin LMP fixed roof tank at Brawal yard FLT Onne.

Inspected start to finish the construction and installation of piping fittings at single deck floating roof tank at SEPTA ENERGY/MOBIL JV.

Supervised Construction & installation of GT-1, GT.-2 and GT-3 at Agip Site and attained zero accident.

Ensured that capacity and capability are continually planned.

Surpassed client demand by established and implemented more Policies, Standard, Objectives, and Procedures

Created, managed and analyzed performance data and other information during and after project execution.

Indentified, encouraged and developed best practice strategy on difficult project execution situations.

Ensured compliance to all Environmental Health & Safety goals & objectives.

Developed Operations Procedures/Plans/Method Statements which define how the business is to be run.

Worked closely with the Project Manager, QA/QC Manager, Facilities Manager, IT Manager & HR department.

 

2012 – 2013:   Largestone Resources Ltd Port-Harcourt, Rivers State.

                       QA/QC Coordinator                    

 

Activities and Achievements

Oversaw all quality control and quality assurance project related activities to minimize         NC’s.

Maintained Projects safety and integrity and follow up the Specifications and Standard.

Ensured that the construction yards are provided with required information in line with requirements.

Prepared and Submitted of daily, weekly and monthly progressive report to Client.

Retained and Coordinated contacts within and the local authorities for all matters related to the work execution.

Reviewed Suppliers, Sub-Contractors procedures and structural material certificates.

Inspected and Confirmed weld preparation, joint fit-up, and dimensions are acceptable and correct.

Performed Quality Audits & Resolution of (NC’s) observed during execution of work & quality audit.

Coordinated quality improvement activities and supporting the Project Team.

Moderated of institution and distribution of Quality and quality control procedures.

Developed, Updated, Administered project QA/QC Plan and NDT Supervision & Operations.

Represented Company on all matters pertinent to the Quality System and train of personnel.

 

 

2007 – 2012:    TOTAL E & P Port-Harcourt, Rivers State.

                         Integrity Engineer                    

 

Led and Supervised a team of 10 Integrity Engineers/Inspectors in different locations; Carried out statutory and non statutory inspections to ensure that the physical and functional integrity of production assets comply with company rules, standards and legislative requirements as they apply but not limited to Piping, FPSO, Vessels, PSV’s, Pipelines, Structures and Lifting, Equipment calibration and maintenance.

 

Activities and Achievements

Overhauled Underwater Inspection & Maintenance of FPSO Hull, Anchor Chains Subsea hoses.

Supervised OML 58 Vessel Inspection preparatory and MP Compressor /HP Turbine over Haul Isolation works.

Oversaw over Haul, Leak tests & Calibrated PSV’s at OML 99 & 100 and Painting Campaign at OML 99 & 100.

Administered OML 58 Facility piping Inspection to ensure reliability with intended function.

Coordinated Inspection & Maintenance of ODD1 Crane Hydraulic Unit at ODDI Crane Level 17 weather deck.

Directed Inspection of OML 58, 99 &100 Wellhead’s Valve

Assimilated reports into SAP, update test results, generate corrective work orders and other data as required.

Produced WSE for specific items and review and approve WSE’s when required.

Carried out Quality Audit of Contractors/Subcontractors and ensured that integrity business cycle is maintained.

Reviewed and followed all required testing and safety procedures while carrying out the work.

   Assisted in compilation and issue specific work packs consisting of marked up drawings and survey sheets.

Performed QC, Fabrication and Welding inspection during modification and repairs.

Developed Inspection plans for static equipment across the assets/ Maintenance System.

Defined the scope of work, budget and planning for job activities.

Provided Integrity/Inspection input to the field MMS system.

 

2005 – 2006:   Ministry of Utilities Yenagoa, Bayelsa State.

                        QA/QC Engineer/ Coating Inspector                   

 

Activities and Achievements

Supervised the construction and Installations of Water Pipelines and Tower Tanks.

Oversaw all QA/QC Painting/Coating related project activities and submit daily reports to my manager.

Maintained all HSE and Standard requirements during and after project execution.

 

2002 – 2005:  NNPC Port-Harcourt, Rivers State as QA/QC Engineer.

 

Activities and Achievements                

Performed general QA/QC Surveillance during; Pipe flow lines, Risers and Tanks Construction, Installation and Commission.

Maintained safety and integrity governing the Projects during and after project execution.


Certifications and Trainings

ASNT NDT Level 2 in UT, MT, VT & PT

Certified welding inspector AWS-CWI 3.1                                                                                                

SAS & HUET                                                                                                                                           

Safety, Risk and Reliability

Fire Fighting

Proficiency in Management-NIM

 

Areas of Expertise

Performance management

Integrity and Inspection

Financial control  and Customer satisfaction

Recruitment and Staff training

HS&E

 

Key Skills and Competencies

QA/QC Expert

Proficiency in SAP, Auto-Cad and Microsoft Office Suite.

High level of integrity, tact and reliability

Motivation, eloquent communication, skills innovation, transparency and quality achievement.

Capable of working under pressure meeting deadline

Capable of working without supervision and A team player

Like taking new challenges to cover fresh grounds

Ability to convert organization to integral operations.






popup-img