CV, Oil And Gas E & I Engineer Targets Africa And Middle East

Available
Serial No: 31468
Skills keywords: commissioning engineer, electrical engineer, instrument engineer, maintenance engineer, project engineer

Short Bio:

Significant experience in Oil&Gas industry as E&I construction and maintenance engineer.
Currently attentive to the market for new challenges and other interesting international opportunities.

Current location:  Sfax, Tunisia - View on map
Nationality: Tunisian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: Arabic, english, french, german, Potuguese
Location I am interested in working: Anywhere

Profile

E&I Engineer qualified graduate with a number of years’ experience working in the oil & gas sector. My training, together with my background of working as Project & Maintenance Engineer closely with diverse oil & gas companies would allow me to make a valuable contribution to your company.

Academic Record

2005 -2008 National Diploma of Engineer National School of Engineering of Sfax Speciality : Electrical Engineering

2003 -2005 Scientific Preparatory Cycle Sfax Preparatory Engineering Institute Maths-Physics

2003 Baccalaureate degree 9 Avril 1938 Secondary School – Sfax Maths – Grade : High Honors

 

Professional Training

October 2012 Programmable Logic Controllers “GE FANUC S 90-30” – Level 3 (2 days)

September 2012 Programmable Logic Controllers “GE FANUC S 90-30” – Level 2 (2 days)

September 2012 Programmable Logic Controllers “GE FANUC S 90-30” – Level 1 (2 days)

September 2012 PTW training with SEREPT

June 2012 DeltaV Hardware & Troubleshooting (EMERSON Process Management Italy – 5 days)

May 2012 FISHER control valve maintenance (3 days)

April 2012 H2S/Site survey (APAVE CONGO – 1 day)

May 2011 Project Management (three days)

February 2011 Process in oil & gas fields: the genesis of petroleum (four days)

July 2010 Process Equipment: Generalities (three days)

July 2010 Process in oil & gas fields: Generalities (four days)

June 2009 Perfection in regulation Level 2 – STIR training center (two weeks)

April 2009 Practices of the instrumentation Level 1 – STIR training center (two weeks)

April 2009 Safety in Low Voltage installations & Explosive Atmosphere ATEX (three days)

January 2009 Electrical enabling: UTE Standards C18-510 (one week)

January 2009 Pneumatic Regulation (one weeks)

January 2009 Installations Security (one week)

 

Skills Summary

LANGUAGES:
• Arabic : Mother tongue

• French : Spoken, written and read

• English : Spoken, written and read

• German & Portuguese: Basic

COMPUTER SKILLS:
• Microsoft Office, MS Project, AutoCAD, AsProjet 5.0

• XLPro2, HELOC 7, DIALux, Calculux, Maple, MATLAB, C+, Eagle, ISIS, SISpro building, Legrand Chantier Chrono, Ecodial

• LV/HV Electrical calculation tools: ETAP 7.0, Caneco, SEE Electrical

• Automation and programming tools: DeltaV (EMERSON), VersaPro 2.04, Proficy Machine Edition 7.0, Cimplicity HMI SCADA 7.5

PERSONAL QUALITIES:
• Have experience as E&I project engineer in all project phases: Engineering and design, procurement, construction, pre-commissioning, commissioning and start-up

• Upstream Offshore/Onshore project and maintenance experience

• Have experience in Review & approval of Vendor drawings/documents and witnessing of Factory Acceptance Tests

• Good knowledge of relevant engineering codes and standards

• Able to comply with HSE principles, policies, and procedures

• Good coordination and communication skills

• Able to live in compact living quarters with a wide range of people

Professional Experience

FEBRUARY 2014 – Till Today
Work with HORIZON COMPANY SARL – Tunisia

Technical And Sales Manager (Freelance)

OCTOBER 2014 – JANUARY 2015
Work with CERI – Tunisia

Project Manager Elec/Instrum: leading electrical & instrumentation construction activities for the vertical “Heat Recovery Steam Generator (HRSG)” in the “Sousse Section D, 400MW Combined Cycle Power Plant” Project (Tunisia).

• Power and Lighting system installation

• Instrumentation system installation

MAY 2014 – SEPTEMBER 2014
Work with EPPM SA. – SOMOIL Angola

Maintenance Instrument Supervisor: achieving maintenance activities in different Oil & Gas sites in Soyo located at the north of Republic of Angola with SOMOIL.

• Preventive and curative maintenance activities on main process stations: Pangala Tank Farm, Quinguila Tank farm, Quinfuquena Tank farm, Cabeça Da Cobra Flow station…

• Electro-pneumatic and pneumatic-pneumatic instrumentation

• Waukesha-Dresser Gas compressor, Water injection pump and power oil pump including MURPHY control system installation, troubleshooting and programming

• Arrow gas motor / Beam pumps Weatherford-Ampscott

• Well head instrumentation / Oil Metering prove at Quinfuquena Terminal

• Pneumatic chemical injection pumps (WESTERN and CheckPoint)

NOVEMBER 2013 – APRIL 2014
Work with SNC-Lavalin International inc. – Tunisia

Instrument & Control Commissioning Engineer: achieving pre-commissioning, commissioning and start-up activities for the new 450 MVA Combined Cycle Power Station in Tunisia with STEG (Tunisian Company of Electricity and Gas).

• Firefighting system commissioning and start up

• Instrument and control system commissioning and start up

SEPTEMBER 2012 – OCTOBER 2013
Work with TUNISIAN COMPANY FOR OIL RESEARCH AND EXPLOITATION (SEREPT) – Tunisia (PSI contracting)

Electrical & Instrument Project Engineer: working as support and project engineer for offshore team with the I&E Maintenance department SEREPT, leading engineering, maintenance, commissioning and startup operations in Ashtart field production facilities that consist of: (5) platforms and (1) FSPO (named IFRIKIA II).

Main Accomplishment:

• Ashtart ESD system revamping project in coordination with GE Fanuc expert: engineering, design, procurement, installation, pre-commissioning, commissioning and start up.

• Preparation of presentation for the Ashtart ESD system: philosophy, performance standards (IEC 61508/ 61511, ISA 84.00, ISA S84.01), architecture, way forward to ensure integrity…

• Ashtart ESD system audit with GE Fanuc expert: system architecture (PLCs, Genius Blocks, GBIs, communication with Quick Panels and supervision station) , programs situation (VersaPro, Machine Edition and Cimplicity)

• New H2S detection and signaling system: engineering, procurement, construction, wiring, programs preparation and uploading, precommissioning, commissioning and startup of the hole installed system. This system concerns the (4) four platforms ASPP2/ASPP1/ASPF1/ASPF2.

• Upgrade of DIRTY WATER BALLAST PUMP at IFR II: installation of new temperature detection loops

• Engineering and design of Cargo Oil Pump vibration monitoring system upgrade (IFR II)

• Upgrade of SIEMENS Gas Turbine Pump TB-1006B (Ruston TB4000 Gas Turbine dual fuel): engineering, construction, precommissioning, commissioning and start up with assistance of SIEMENS

• Revamping of FORAID unit (debutanization unit): migration from pneumatic to electric instrumented control system

• Diagnostic of accruing problems in the TB-1006A SIEMENS Gas Turbine Pump: coordination with SIEMENS representatives for the calibration of STAR gas fuel system

• Prepare Precommissionig, commissioning and Startup documents:

 Conformity ChecK Sheet (CCK)

 Prepare and develop OTP (Operational Test Procedure)

 Prepare and develop FTS (Functional Test Sheet)

 Prepare Subsystem Precomm & Commissioning Dossiers

 Identify and Organize all required Temporaries

 Arrange Vendor/Specialist assistance as required

 Ready For Commissioning Certificate (RFC) / Ready For Start-Up Certificate (RFSU) / Punch list

• Ensure all relevant documentation, inspection certificates, drawings and P&IDs are updated for integration into the Company Document Control Center

• Plan, schedule, conduct and coordinate program of methods department work and projects

• Carry out installation, calibration, maintenance and commissioning activities for all field-based instrumentation, associated cabling and tubing etc.

• Carry out modifications on DCS, PLCs programs, safety logic diagrams and ESD Cause & Effect matrix

• Contractors follows-up and work packs mark-up

• MOC’s cost and planning estimation

JANUARY 2012 – AUGUST 2012
Work with BEENDER LTD (PSI contracting)

M’BOUNDI field development Project – ENI Congo

Project E&I Engineer: This project is about two major parts;

• Upgrade of the Offshore Water Intake System at Djeno (Jack-up) to meet M’Boundi New Water Injection Requirements of salty water through two 16” sea lines.

• Installation of the Gas Injection Network from M’boundi plant to 5 well-heads: Basic engineering, value engineering, detail engineering, construction, commissioning and start up.

During this project, I was responsible of:

• All engineering activities including preparation of standard required documents for client, lighting and earthing calculation notes, endorsement of routing layouts, transformer & MCC & HV cell design and purchase, all instruments wiring & connection & calibration.

• Supervising all electrical & instrumentation activities:

 an electrical room, a 630KVA transformer with HV Cubicle equipped with circuit breaker, a TGBT/MCC for LV distribution and soft-starter Altistart, water injection pumps, Electrochlorinator package, Coarse Strainers and other materials shall be installed on the juck up.

 5 well heads, 2 pig launcher, 2 pig receiver, 4 cluster and electrical and all instrumentation activities

• Pre-commissioning, Commissioning and start up

• Final Documents

FEBRUARY 2010 – DECEMBER 2011
Work with SACNA ENGINEERING (PSI contracting)

South Gas project Ph2: New Compression Unit – ENI Tunisia

Project E&I Engineer: During this project I was in charge of:

• Detail engineering

• Preparing all material’s RQFs, review and approval of vendor documents

• Construction supervisor (all electrical & instrumentation works):

 2 New Gas Compressors (LP 402 & HP 502)

 UCP, MCC, pneumatic control panels, instrument control loops

 ABB HV circuit breakers, HV motors, HV cables terminations

 lighting and earthing systems

• Pre-commissioning, Commissioning and start up

• Preparing As-Built Documents

South Gas project Ph2: Chilling Unit – ENI Tunisia

Project E&I Engineer: Preparing technical & commercial bid. During 10 months, I was in charge of the detail engineering, construction, commissioning, assistance to the field start up and preparation of As-built documents of: 2 refrigeration compressors, 6 air coolers, a liquid receiver with vertical filters, a raw gas cooler, an economizer and a suction scrubber.

Fire & Gas Detection System Project – ENI Tunisia

Project E&I Engineer: Technical & commercial proposal preparation, Engineering and design of all electrical, instrumentation and mechanical works of a complete F&G detection system for Oued Zar field.

Three Phase Inlet Separator package – PIONEER Tunisia

Project E&I Engineer: Preparing technical & commercial bid. The scope of project is the design, procurement, construction, commissioning, start-up and as-built documents of a skid mounted three phase separator MBD-295 to be installed in the Waha Production Facility.

South Gas project Ph2: Dehydration and Glycol Regeneration Units – ENI Tunisia

Project E&I Engineer: Engineering and design of all E&I and mechanical works for units interconnecting and study of the project cost and planning estimation.

DECEMBER 2008 – JANUARY 2010
Work with PETROLE SERVICES INDUSTRIEL (PSI)

Main achievements as Project & Technical-Sales Engineer:

• Light Crude Metering Skid – THYNA PETROLEUM SERVICES “TPS”

• Supply and Prefabrication of Interconnecting Piping Lines – GASCO UNITED ARAB ENIRATES

• Fire fighting system at CPF Perenco – PERENCO Tunisia

• Water Injection Units For Rom & Zea Fields Project – Groupement Sonatrach-Agip Alger

• Low Voltage Distribution Panel (TGBT) at Elfranig plant -PERENCO Tunisia

• Electric Tracing and Thermal Insulation of pipelines at CPF-Perenco – PERENCO Tunisia

• Chargui 3 Tie Back Flowline at Kerkennah onshore -PETROFAC Tunisia

• Technical & commercial proposal preparation , Engineering and design of all electrical, instrumentation and mechanical works

• Djebel Grouz Project Ph2: Oil Center Relocation – ENI Tunisia

• SCSSV and SSV control panels of TSIENGUI and OBANGUE field wells – ADDAX Gabon

• Gas Expansion Skids for the control panels of TSIENGUI and OBANGUE field wells – ADDAX Gabon

• Niungo Upgrade Phase 3 Project: Chemical Injection Skids – PERENCO Gabon

• Custody Transfer Metering Skid Project at the Maamoura and Baraka plant – ENI Tunisia

 

 

 






popup-img