Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

CV, Mechanical Engineer With CAD Capability Looking Globally

I am currently available for work
Serial No: 6196
(25/06/1968, male)
List top 5 skills: construction, engineer mechanical, machine installation, machine shop supervisor, mechanical design, project management
Short Bio:

I will try to growth up my new company with my capability and experience to catch company goal with good corporation , responsible , honest and loyal to management .
In mechanical my expertise i will give my capability in mechanical including , design mechanical , installation mechanical equipment .
As mechanical engineer , I will do as engineer for planning , study with team in work area also keep safety role if work in the field.
As mechanical Supervisor , I will keep work schedule on time without delay and keep budget not be over.

Current location: 

Jakarta, Indonesia - View on map

Spoken languages: 

english

Locations I am interested in working:

Mauritania, Netherlands, nigeria, Norway, Oman, saudi arabia, South Korea, United Arab Emirates



Education

BS Mechanical Engineering, University of Malang , Indonesia (1992)

Professional Experience

Site Manager , PT. GAMINDO Gresik , February 2013 – up to Now

  •  Keep progress work on schedule.
  • Keep and Implementation safety rule in work area.
  • Keep budget on project assignment.
  • Weekly progress meeting in office.
  • Good coorporate with the client
  • Participate in meeting with client.
  • Approved daily attendance sheet
  • Approved for material requisation
  • Participate and Advice in tool box meeting.
  • Material and manpower control in project site.

 Staff Principal Mechanical Engineer , PETRONAS RESOURCES, KUALA LUMPUR July 2012 – January 2013

  • Demonstrate Safety in Design technical knowledge and Identify with Malaysia, Client and other standards.
  • Show strong, effective pro-active leadership and support to direct reports ensuring team members receive continual feedback, development opportunities and mentoring as required.
  • Actively participate in the planning and initiation of a project in conjunction with the Project Engineering team.
  • Check and Review drawings for content accuracy.
  • Perform engineering design and calculations.
  • Offer guidance on design and specification of supporting infrastructure.
  • Adhere and assist with technical support for the procurement and contracting process.
  • Demonstrate strong communication skills and ability to establish good working relationships with vendors and project team members across all disciplines.

Operation Supervisor , STX Korea , Iraq June 2012 – July 2012

With project H.F.O Engine Diesel Iraq Power Plant Project

  • Review DCS actual parameter data with setting parameter data.
  • Spare parts selection for maintenance.
  • Re-organization with maintenance crew for maintenance scheduling
  • Sampling Check for condition run time engine.
  • Review of vendor test commissioning.
  • Involvement in kick of meeting.
  • Interface and coordination with all concerned.

Lead Mechanical Engineer, PT. ALDABERTA INDONESIA , Jakarta

December 2011– June 2012

With project PMC at PERTAMINA UBEB LIMAU – Palembang

  • Review engineering document from subordinate or from contractor.
  • Review and selection of rotating equipment.
  • Review document of equipment specification and equipment data sheet.
  • Review document of strength calculation of equipment.
  • Review of vendor bid.
  • Review of technical bid evaluation and preparation of technical queries.
  • Involvement in kick of meeting.
  • Review of vendor document.
  • Participation in Factory Acceptance Test
  • Interface and coordination with all concerned department and all diciplin.

Mechanical Supervisor, PT. SOUTH PASIFIC VISCOSE , PURWAKARTA

August 2011 –  December 2011

  • Review attendance sheet of contractors.
  • Review progress report of contractors.
  • Review the Detail Engineering documents with respect to scope of work and Bid document, involve in raising RFQ and preparation of MR.
  • Undertook the design and construction of resource development projects.
  • Supervised the operation of manufacturing process plants such as  production plants, coal handling installations, power stations and sewerage and water supply pumping stations.
  • Specified, selected, installed and managed the maintenance of factory production and machinery.
  • Set up work control systems, e.g. testing of equipment to make sure that standards of performance, quality, cost and safety are met.
  • Acted as client, carrying out studies about possible changes or improvements and estimating costs of products for clients.
  • Ensure all customer claims existing corrective action-PICA.
  • Ensuring new project, modification and product development go as planned.
  • Leading resolve the problems related to Quality Product.
  • Serve as Quality Representative on a project.

Mechanical Equipment Supervisor, PT. Trilink Indonesia supply to TECHINT CIMIMONTUBI , ITALY   2009 – 2011
With site project Escravos Gas to Liquid CHEVRON NIGERIA LIMITED

  •  Involved in erection/ pre commissioning/ commissioning of Pumps, Steam Turbine , Gas Turbin and Gas Compressors.
  •  Review and recommend Spares for Rotating Equipments.
    •  Data collection and analysis.
    • Problem logging with management to closure.
      • Leading resolve the problems related to Quality Product.
        • Partisipati for QA / QC do the jobs.
        •  Test status, data, analysis, and conclusions generation.
        •  Technical risk assessment based on data.
        •  Recommendations on how to proceed based on testing    conclusions.
          •  Presentation and documentation of product evaluation    activity, test status, data, problem log, and conclusions.
            • Project status meeting management.

Mechanical Equipment Superintendent, MOHAMMAD ALMOJIL GROUP  , SAUDI ARABIA   2007 – 2009
With site project Juamah Gas Plant Expantion SAUDI ARAMCO

  • To check daily attendant report .
  • To prepared daily progress report .
    •  To attendance daily tool box meeting .
    • To supervision of CAT engine Generator installation .
    • To do pre commissioning .
      • To do  commissioning  , test run and preservation before start   up.
        • To supervision of Sulzer pump installation and alignments.
        •  To supervision of MAN Turbo Oxygen compressor  installation and

alignments.

  •  To supervision for installation and alignment of Generator Turbine sole plate.
  • To supervision of Vessel and heat exchanger installation and alignment .
  •  To supervision of GE generator turbine installation and alignment.
  •  To supervision of air cooler installation and alignment.
  •  To supervision of bearing turbine inspection and lubrication and  follow of    safety rule on work area.
    •  As Work responsible Person for keep safety on work area.
    •  To prepare permit to work before start working.
    •  AS IIF coordinator on job location for implementation safety work our culture.

 

Mechanical Supervisor / Site Manager , PT. TAIYO SINAR RAYA TEKNIK , Jakarta 2005-2007

With project site HM Sampoerna PP1 New Line Project , Panasonic Lighting Indonesia ,AT Indonesia Project ,Easterntex Power Plant Project and Nippon Ring Piston Manufacture Project.

 

  • Distribute work order to sub contractor
  • Give advise to work problem
  • Keep safety in the work area
  • Conducted tool box meeting
  • Approved material order
  • Conducted weekly progress meeting
  • Attending meeting with client.
  • Attendance monthly meeting with head office.
  • Inspection of equipment with client together with sub contractor.
  • Approved inspection equipment report from sub contractor.
  • Prepared material and tool before project start.
  • Survey project before project start.
  • Budget alocation for each project.

 

Chief Mechanic , PT KARYADIBYA MAHARDIKA member of Cigarette manufacture PT. Gudang Garan tbk , Pandaan 2003 -2005

  •  Give decision of rebuild packer machine
  • Make design for modification spare part
  • Installation , aligment new packer machine
  • Modification and re-setting as requirement product
  • Aligment of rotating equipment such as pump , gear box , mixer and compressor

Barge Master / Superintendent and or Assistant HSE, CGG – PT.ALICO Seismic Oil & Gas , Gresik 2002 – 2003

With project Amerada Hess Ujung Pangkah Shallow Water

  •  Control and Approved stock material
  • Approved for spare part order list
  • Approved for received or send spare part or equipment
  • Conducted Induction training for new employee in the barge
  • Conducted swimming test for new employee
  • Indentification or check safety equipment

Machinist , PT. INAMCO VARIA JASA , Sumbawa 2000 – 2002

With job site Gold and Copper Mine PT. Newmont Nusa Tenggara  at Process Maintenance Department Machine Shop Section.

  •  Make spare part with manufacture machine such as Lathe Machine ,Milling Machine , Radial Drilling Machine etct.
  • Make drawing spare part

Mechanical Designer, PT. MK PRIMA INDONESIA , Gresik 1993-2000

  •  Make drawing dies with CAD as production requirement
  • Check drawing dies from drafter
  • Make CNC program with CAD CAM TOOL for CNC manufacture machine
  • Make order material list for structure dies
  • Conducted training for employee or new employee
  • Follow QA / QC for product implementation

Mechanical Draftsman , PT INDOPRIMA GEMILANG , Surabaya 1992-1993

  •  Design machine as production request for new machine or modification using Auto Cad Release14 or with conventinal drafting.

 

Computer Skills

Windows, PowerPoint, Word, CAD, CAD CAM, SAP, PDMS, Excel and proficiency in Auto Cad.

Training or Course
Programmer CAD CAM TOOL in Graphic Product Inc Tokyo Japan for 4 months, Slinging and Lifting in PT. Newmont Nusa Tenggara for 3 days, Hazard identification in Southern Gas Construction, Confine space training in Southern Gas Construction, IIF our Culture in Chevron Nigeria Limited, SAP program in South Pacific Viscose, PDMS operator training in Oil Institute