A Graduate in Mechanical Engineering with 3 years experience and proven background in Oil & Gas Construction. Technically professional and experienced in Mechanical Construction as per the international standard codes & specification under Oil/Gas Petrochemical & Treatment Plants.

Most recently worked for Al-Khafji Joint Operations (KJO), Construction of water Treatment Facilities Phase-III Project, with a PIC contracting company at Saudi Arabia.

Current location:  Uttarakhand, India - View on map
Nationality: Indian
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: Arabic, english, Hindi
Location I am interested in working: Anywhere

Qualifications

 Pursuing Executive- MBA in Oil & Gas Management (2014-2017) from University Of Petroleum Energy & Studies, Dehradun, India (www.cce.upes.ac.in)

 B.Tech in Mechanical Engineering (2007-2011), first class with distinction, from Sree Buddha College Of Engineering (www.sbce.ac.in) affiliated to University of Kerala.

Career Summary

 Piping -Piping & Support Pre-Fabrication & Field Erections AG/UG Installation & Test, Vendor Piping (Static / Rotary equipment).

 Mechanical -Equipment fabrication, Steel structure Pre-fabrication and Field Erection.

 PIC construction of Storage tanks as per API conformance, Power Piping & Process Plant Piping as per ASME B31.1, 31.3

 Test Package -Test Package Preparation Review Approval & Testing Monitor/Control.

 Testing -Hydro, Service, Pneumatics & Others (Field Valve, Visual & Gravity).

 As built P&ID Mark-up as per Service & System.

June 2012- April 2014
Al Hammam Company, Saudi Arabia (www.alhammam.com)
An ISO 9002 Company working consistently for more than 20 years to manage projects to completion such as specialized mechanical, process piping, electrical and instrumentation work.

Project -Water Treatment Facilities-Phase III JGC Gulf will perform EPC for new water-treatment facilities for treating produced water (170,000 bbl./d), with KJO’s crude processing facilities. The contract is valued at more than $150 million.

Designation- Mechanical Engineer- Projects

Responsibilities:

 In charge of setting up of Fabrication shop for pre fabrication works for KJO and JGC approval as per Saudi Aramco Standards.

 Witnessing material receiving inspection for pipes, fittings and consumables.

 Responsible for piping prefabrication work in compliance in accordance with ASME 31.3

 Coordinating various construction crews, Quality Persons and Painting Personals and Transport activities of prefabricated spools and supports to Project Site.

 Responsible for installation and erection of mechanical equipment, piping system, structural steel fabrication, platforms and pipe racks at site.

 Preparation of construction drawings and schedules and ensure preparation of “as built” drawings and other job plans and coordinates with lead Piping Engineer on technical data

 Participation in HAZOP / HAZID studies.

 Preparing project reports and attending project meetings with KJO and JGC.

 Focal point to project manager for all mechanical activities from bid to completion.

 Accurately estimate material, construction and labor costs as well as project timescales.

April 25, 2011 – May 19, 2012
Bhavani Erectors Pvt Ltd, India (www.bhavanierectors.com)
BEPL specifically satisfy the requirements to undertake fabrication, Erection, Testing and Commissioning of Power plants and related fields in India and abroad.

Project – Unit #2 2X600 MW, Dhanik Bhasker power Ltd – Collection of materials from BHEL Storage, Erection, Testing & Commissioning, trail operation and handling over of boiler and its auxiliaries, air preheaters, ducts and dampers, fuel piping, boiler integral piping, Lining and Insulation and Final painting for Unit 2 of 2 X 600 MW DBPL Project.

Designation – Mechanical Engineer- Field Piping Execution

Responsibilities:

 Review fabricated erected or installed lines as per latest isometric drawing for construction.

 Monitoring the routing of piping and preparing as built drawing.

 Preparation, checking and review of as-built drawings and getting approved.  Perform line-check, hydro testing and pre-commissioning.