CV, KSA Based Construction Project Director, Proposal Manager

Available
Serial No: 23726
Skills keywords: project management

Short Bio:

The Project Management Specialist supports the administration of daily project management. Coordinates team members on the implementation and effective usage of project management methodologies. Plans and coordinates project scheduling, budgeting, and administrative tasks. Supports the project staff by facilitating project logistics such as meetings, conference rooms, conference calls, etc. Takes meeting minutes and action items during meetings and performs basic follow-up.

Current location:  Riyadh Province, Saudi Arabia - View on map
Nationality: Syrian
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: english
Location I am interested in working: Anywhere

Profile

Lead structural project management with over 25 years construction operation experience including regional and international projects ,highly developed technical expertise with full range of project management software, creation a system in the activities, highly motivated, meeting deadlines.

Area of Expertise

The Project Management Specialist supports the administration of daily project management. Coordinates team members on the implementation and effective usage of project management methodologies. Plans and coordinates project scheduling, budgeting, and administrative tasks. Supports the project staff by facilitating project logistics such as meetings, conference rooms, conference calls, etc. Takes meeting minutes and action items during meetings and performs basic follow-up. Assists in development of presentations. Familiar with a variety of the field’s concepts, practices, and procedures. Relies on experience and judgment to plan and accomplish goals. Performs a variety of tasks. Typically reports, Civil Engineering Drawing and Introduction to Design, Geology, Materials, Civil Engineering Systems, Environmental Engineering ,Transportation Engineering, Hydraulics, Water Resources Engineering ,Civil Engineering Design Project, Soil Mechanics, Foundation Design, Advanced Geotechnical Engineering, Computer Applications in Civil Engineering Practice, Design of Reinforced Concrete Structures, Design of Steel Structures , Environmental Impact Assessment, , Waste Management Geo-Environmental Engineering, Highway and Pavement Design, Transportation Planning and Design , Hydrology, Hydraulic Engineering, Capstone Building information modelling Introduction to the Construction Management Construction Project Planning and Scheduling ,Construction Cost Estimating and Budgeting , Behaviour of Materials, Building Systems ,Construction Accounting and Cost Control , Construction Contact Administration, Construction Safety and Risk Management, Construction Site Operations ,Construction Safety ,

Career Objective

Action oriented project manager experience in the construction field ready to offer outstanding skills in bidding, value engineering, cost saving, cost avoidance, budget management, team building consensus and projects management.

Career Summary

Project Director
SEIF Engineering & Contracting -Riyadh
May 2013 – June 2015

Brief Scope: Mega Project responsible for the preparation of bids technical and financial proposals, clearly define SOW in a timely manner to comply with client requirements, monitoring the progress of complete operational control over the proposal plan collaborates capture proposal collaborates with client executives to advise appropriate resources required to support proposal development, for the following but not limited to  bids:

• King Abdullah Medical City Makah -MOH

• Military Complex Medical City Riyadh- MOD

• Housing -South Region- MOI

• Riyadh Metro Project ADA

• Al Waseel Hills Residential Project SABIC

Projects Manager
Jaber Energy Services (AJES) -Abu Dhabi
May 2011 – June 2013

• Ruwais Refinery Expansion, (Marine Facilities Packages) (RRE2)

Brief Scope: early civil , enabling , precast, steel structure works, trenches, roads and under passes, helipads, precast retaining walls, shelters, telecom towers, ,racks support pipes (Marine Transportation), power cables and instrument in petrochemical, power plants, ,support mechanical equipment, vessels ,valve access platforms and underground Piping Network, at contract value of USD$ 340 Million .

Clients:
Abu Dhabi Oil Refining Company (TAKREER)
PMC: JACOBS Engineering Group Inc.

Medinat Zayed Terminal Pipeline and Storage facilities Packages (IRP2)

Brief Scope: 16 gas oil storage tanks in 16 to36 meters in diameter, oil gas pipeline network 10 to 28 inches in diameter, control building, substation, and the project is estimated , at contact value of USD$ 92 Million .

Client: Abu Dhabi National Oil Company (ADNOC)
PMC: TEBODIN Consultants & Engineers

Construction Project Manager
Arabian Construction Co. Abu Dhabi
Apr 2006 – May 2011

Shams Abu Dhabi Development, Gate Distinct Towers Project – Al Reem Island,

Fast Track Project involves construction of 8 towers comprising 60 to 75 stories, provides 1.1 Million Square meters of office space and 3, 533 residential units, underground parking and an environmental terrace on top 6 stories podium, the development includes the two tallest buildings – the 74 stories Sky Tower and 65 floor Sun Tower, the design of Project has considered a minimal impact on the environment through energy and water conservation, waste minimization and recycling and no greenhouse gas emissions. The contract value of USD $ 2.4 Billion.

Developer: Sorouh Real Estate, RW Armstrong Khatib & Alami

PMC: Hill International

TOWER 4, 3 basements, 6 stories podium& 65 stories 1016 units residential units varying from apartments (studios, 1, 2, 3 & 4 bedrooms) topped by hat structure over with 8 penthouses, TOWER 4 has a total structural height of 262 m, this building was at a Cost of USD$ 235 Million, The project has exceeded 20 Million MH without a lost time accident (LTA).

SUN TOWER 3 basements,6 stories podium & 65 floors 680 units residential units varying from apartments (1, 2, 3, & 4 bedrooms), stories topped by 10 penthouses, SUN TOWER has a total structural height of 247 m, this building was at contract value of USD$ 183 Million.

Project Manager –Nov 1999-Apr 2006
ANC Contracting LLC -Dubai
Nov 1999 – Apr 2006

HORIZON TOWER 3 Basements ( car park), 45 stories circular residential & 3 double height penthouses stories, on the roof is a helicopter pad .the tower has a total structural height of 190 m & 156 residential units comprising of 4 bedroom units and 8 deluxe duplex apartments only four apartments the contact value was at of USD$ 55 Million.

Developer: Gulf Investment Corporation Designer & Consultant: ARENCO

FOUR POINTS BY SHERATON Downtown Dubai
Stands seven stories tall, 250 oversized guest rooms, suites, a fully Equipped recreation floor and rooftop swimming pool, this Building was at a cost of USD$ 23 Million.
ARENCO Real Estate Engineer

Project Engineer Sep 1993-Oct 1999
Gulf Span Contracting -Sharjah
Sept 1993 – Oct 1999

ROYAL FAMILY HOUSE architecture building In traditional Arabic décor, the property includes the finest of interior design and its own bunged swimming pool, private separate servant’s quarters as well as a lounge Quarters nearby a PRIVATE MOSQUE has interior design is modern and artistic atmosphere.

Client HH Sheikh Abdulla Bin Ali Al-Than,

Designer & Consultant: Katib & Alami

SITE ENGINEER: KHAN SAHEB MOSQUE public mosque that has a plain interior design for 1000 Prayers

Client Hussein Khansaheb, Designer & Consultant: Emirates Engineer,

Union of Charity Org.
Client Representative (Voluntary work)
July 1989 – Sept 1993

Orphanage house 450 children, built up area is equal9500 m2 consists of Basement, GF. & 4F topped by service floor, the structures had to be easily replicable and be constructed of locally available materials.

Qualifications

University of Alep Bachelor of Science in Civil Engineering major Construction Management , 1993,
The degree has been verified by Integra Screen FZ, NY US

Professional Certifications

Project Management Specialist, Colorado Technical University 2005, CO, US

Project Manager Professional, Project Management Institute (PMI) 2005, NY, US

Green Building Design and Construction Industry LEED 2.0 Accredited Professional, 2007

The practice use of the 1999 FIDIC Conditions of Contract, MODERN Consulting 2012 Turkey

The Risk Management Specialist, Institute of Fraud Risk Management 2008 NV, US

Managing Safety in Construction, Institute of Occupational Safety and Health (IOSH) 2008 London UK

Introduction to Safety Management, Occupational Safety and Healthy Training 2010, London UK

Health & Safety for Director and Senior Management, British Safety Council 2012 London, UK

Construction Claims Intensive Training Course, CLAIMS CLASS 2013, London, UK

 

 

 

 

 

 

 

 

 

 

 






popup-img