CV, Italy based Electrical and Instrument Superintendant

I am currently available for work
Serial No: 16161

List top 5 skills: 
Short Bio:

As per my CV

Current location: Lazio, Italy - View on map
Nationality: Italian
Preferred Sector of Employment:  , Oil, Gas and Energy, General Management
Spoken languages: english
In what location are you searching for employment: Anywhere


Qualifications

Year: 1985
Institution Electrical Engineering (Diploma Elettrotecnico)

Career Summary

CONSTRUCTION OPERATION MANAGER in charge of multiple projects for a total of around 12 million man-hours +, in charge of all feed and multiple requirements to execute the projects which includes logistic planning, Equipment, Site facilities, Site personnel selection till the construction and site management positions of the various projects, coordination of Site organizational system management for site best performance of interdisciplinary and interdepartmental coordination aimed to achieve the best work done in time and best in quality and observing as first all applicable HSE rules, HSE Campaigns regularly organized in various projects sites, etc.. Actively participate in the proposals of new bids suggesting improvements and manners to introduce for better and key efficiency factor to bare the tough competition of the present market for this field of Operation, mainly these duty is involving areas of Middle East. This Also included works related to Piping and Mechanical works for some of the projects, but of Small size. In my last duty as Construction Operation Manager I had to get directly involved in to a project among others under my supervision, with particular previous unorganized issues , risking the lost of the contract itself which could generate heavy loss from the commercial and economical impact , in this Project, where the client was SATORP( Joint venture between SAUDI ARAMCO AND TOTAL)I had to officiate directly as the Project Manager , Being the previous Site and Project Management failed to deliver ,till completion and satisfaction of the final Client minimizing the previous Impact and able to provide the Units/Plant Handed over to Client within their rescheduled commissioning and start up Targets, where of course even from Main Contractor Side considerable delay in Engineering, Procurement and Mechanical works had affected and considerably delayed the E&I Works, portion of MY direct supervision and scope of work.

PRESENT POSITION (CONSTRUCTION OPERATION MANAGER) (late 2012 till August 2014)
( Bonatti S.P.A.) SAUDI ARABIA

2009-2012 Bonatti S.p.a Site Manager Bonatti for E&I Works (Consortium BMSS)

2008-2009 Tecnimont S.p.a Construction Manager Tecnimont for E&I Works( Bouruge)(II) Ruwais

2006-2008 Tecnimont S.p.a Site Manager (TICB) Tecnimont India for E&I Works

2004-2006 Tecnimont S.p.a. Electrical-instrumentation Superintendent

2001-2004 Tecnimont S.p. Electrical and Instrument Superintendent

2000-2001 Snam Progetti Electrical and instrumentation Superintendent

1999-2000 Isoctane Electrical and Instrumentation Superintendent

1997-1999 Ansaldo Electrical and Instrumentation Supervisor (Site In charge)

1989-1996 Jacorossi(Petrochemical) Electrical Supervisor

1987-1989 Iacorossi (Petrochemical) Electrical Supervisor

 

2009-2012
Bonetti Spa
ESKENE Project Bolashak ,Oil Gas and Sulhur Plant ,AGIPKCO/ENI Kazakhstan
Site Manager for Electrical & Instrumentation works

In charge of the all works related with electrical and instrumentation works activities cumulating values of the project 250000000 Euro value for 5000000 man-hours.

The task given was to manage the whole project needs in coordination with Project Manager Interfacing the client and in charge of planning, QA/QC and all related local certification, all of activities in line with project targets and task within the budgeted given resources and enforcing the local content as first priority resulting in a successful achievement for both Company and client satisfaction. Organizing HSE courses for employees and follow up on the day-to-day HSE performance during the execution of the project. In a Team Spirit making as One the local and expatriate resources achieving very challenging targets within the project execution with major amazed satisfaction of client and unexpected completion dates even with adverse weather and environmental conditions

This was including recruiting of manpower/transportation, etc. From local agencies as well as per the projects needs.

All this was Within a Consortium created Between Bonatti and MSS, local major oil and gas Construction Company

2008-2009
PPE /HDPE in Bouruge2 , Ruwais Abu Dhabi, Phase 2,Tecnimont,
Construction Manager Tecnimont for E&I Works

Directing subcontractor activities for his discipline, ensuring that Plant Construction works are performed according to the erection schedules and Project documents, within the assigned cost budget, and according to Quality & Safety procedures, as well as according to the terms and conditions of the subcontract.

2006-2008
Tecnimont S.P.A(TICB) Site Manager for Electrical and Instrumentation works
Petro Rabigh Project –Saudi Arabia (Petro Rabigh)
EPPE/ELDPE/HDPE&BUTANE – PLANTS

In charge of the all works related with electrical and instrumentation works activities cumulating values of the project 23000000 $ value for 1700000 man-hours .

The task given was to manage the whole project needs with the inclusion of the arrangements of Accommodation (Camp at Rabigh) self build and related offices.

This was including recruiting of manpower/transportation, etc. from local agencies as well as per the projects needs.

Responsible and sole authority for all financials and budgeting related to this project.

2003-2004
Tecnimont S.p.a. Electrical and Instrument Superintendent
HDPE, Wesseling, –

Directing subcontractor activities for his discipline, ensuring that Plant Construction works are performed according to the erection schedules and Project documents, within the assigned cost budget, and according to Quality & Safety procedures, as well as according to the terms and conditions of the subcontract.

2004-2006 Tecnimont S.P.A Electrical and Instrumentation Superintendent
Nahnai project –China-EPC
PP/HDPE/LDPE – PLANTS

In charge and directing (Two different subcontractors) for all construction works related to the electrical and instrumentation of the three plants part of this project, ensuring that Plant Construction works are performed according to the erection schedules and Project documents, within the assigned cost budget, and according to Quality & Safety procedures, as well as according to the terms and conditions of the subcontract.

In charge of precommissioning activities for the electrical and instrumentation of the three plants, which included all the certifications of the various electrical and control equipments checks and tests.

Assisted client for the commissioning activities.

Basell Plant, Germany Directing subcontractor activities for his discipline, ensuring that Plant Construction works are performed according to the erection schedules and Project documents, within the assigned cost budget, and according to Quality & Safety procedures, as well as according to the terms and conditions of the subcontract.

2001-2003 Tecnimont S.p.a. Electrical and Instrumentation Superintendent
Granulation Plant PH. 1 – PIC – Kuwait
Granulation Plant PH. 2 – PIC – Kuwait

Directing of personnel and activities, ensuring that Plant Construction works are performed according to the erection schedules , Budget and Project documentations, and according to Quality & Safety procedures, as well as according to the terms and conditions of the subcontract.

2000-2001
SnamProgetti Electrical and Instrumentation Superintendent

Kharafi National – Koc Sea water injection plant – Kuwait Responsible of the electrical and instrumentation works, in charge of all the works concerning the above plant including precommissioning works and commissioning/start up.

1999-2000
Isoctane(Kharafi National) Electrical and Instrument Superintendent
Gasoline Plant – Dubai Responsible of the electrical and instrumentation works, in charge of all the works concerning the above plant including precommissioning works and commissioning/start up.

1997-1999
Ansaldo( Jacorossi Imprese – Petrochemical) Electrical and Instrumentation Supervision

Recarbonation Plant – Kuwait( Two Trains) At first as E&I in charge for the works related to this projects which counted for a total of 800000 Mhrs, for the construction works , successively,Deputed as construction and commissioning manager with whole responsibility for the various works including punch list and built drawings.

1989-1996
Jacorossi Imprese()Petrochecmial) Electrical Supervisor( Training Engineer)

Various Projects Kuwait, .Mainly Maintenance and small revamping works in old Refineries of Mina Al Ahmadi, Shuaiba, etc. Involved in day-to-day maintenance activities given by client and mostly emergency trouble shooting works.

1987-1989
Jacorossi Imprese()Petrochecmial) Electrical Supervisor
Cartiera Di Monfalcone, Paper industry of Monfalcone

( Italy) Supervising of Portuguese personnel for the Electrical Construction Works related to the installation and Testing of Lighting and small Power , UPS, Motor Control Center, Medium Voltage Switchgear and Related small Power Plant of 25 MW. And all related cabling and termination

In the scope there was assistance to the Commissioning as well