Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

CV, Indian International Welding Inspector looking worldwide

I am currently available for work
Serial No: 16398

List top 5 skills: cswip3.1, iso 9001, ndt l-ii
Short Bio:

i have total 11 years of experince in ndt

Current location: 

India - View on map

Nationality: 

indian

Preferred Sector of Employment: 

Oil, Gas and Energy, other

Spoken languages: 

english, gujarati, Hindi

Locations I am interested in working:

Anywhere



Work Experience

Dec 2012 to Mar 2014 Samsung Engineering Co. Ltd. Basra , Iraq, as Welding inspector –Luk Oil Middle East ltd’s West Qurna Phase#2 Project Site.

Key Deliverables:

 Arrange training program(Tool Box talk) of welders, fitters and helpers about joint design, types of materials, use of different type of welding consumable, cause of welding defects & method of control welding defects during welding etc for achieve better quality without delay of progress .

 Discuss with construction team supervisor regarding work with related standard and code.

 Responsible for closing of NCR and QAR.

 Inspection & Monitoring of day-to-day fabrication activities , Recording all results of inspection and make written report of daily inspection activates.

 Review the entire applicable document before welding. Ensue that quality plan is authorized and endorsed with signature, date and stamp. Carry out check on calibration certificate, material test certificate (MTC) and welding consumable certificate to determine their availability and validity.

 Receiving material inspections, material identification & TC verification, establishment of approved QAP & selection of Electrodes and other consumables as per approved WPS/PQR.

 Non-Destructive testing of welds, interpretation of Radiographic films as per codes and technical specifications.

 Tracing and repair of welded joints in accordance with the nature of defects occurred.

 Witness of welder qualification test based On ASME Section IX, AWS D 1.1 & Preparation of PQR.

 Approve WPS And ITP from Client.

 Verification of welding equipments calibrations according to project specifications.

 Verification of Consumable storage, treatment & handling according to approved procedures.

 Surveillance Inspection for the consumable control by welders.

 Surveillance/witness inspection of PWHT activities and sign off the PWHT chart and reports.

 Witness & Review of all documents prior to Pneumatic testing & Hydro testing,& documentation of the same.

 Conducting weekly review meetings with construction team ,other inspectors and giving the feedback to QA/QC Manager.

 Daily reporting to QA/QC Manager in written regarding daily site work activates.

 Coordinating with client inspection department at various stages of fabrication activities and getting approval.

 Installation and alignment of static and rotary Equipment.

Significant Highlights:

 Instrumental in finishing the work with safe standards & Quality Standards within the timelines.

 March 2012 to June 2012 JCC , Abudhabi , UAE ,(Borouge -unit 3) Project as Welding inspector ,

Ruwais , Site.

Key Deliverables:

 Visual & stage inspection of welding joints

 Providing daily reporting about work progress report to QA/QC Manager.

 Inspection Document Preparation.

 Arrange training program(Tool Box talk) of welders, fitters and helpers about joint design, types of materials, use of different type of welding consumable, cause of welding defects & method of control welding defects during welding etc for achieve better quality without delay of progress .

 Ensure to PMC /OWNER that job is going on as per project requirement specification/code /standards for satisfaction.

 Inspection of each and every job activity (like fit-up, weld visual etc.)as per the requirement of inspection & test plan in underground & above ground piping.

April 2011 to March 2012 Samsung Engineering Company Ltd., Dahej , Bharuch as QC Inspector-(Welding) – ONGC Petro Addition Ltd ’s Project at Dahej Site.

Key Deliverables:

 Visual & stage inspection of welding joints

 Witness of welder qualification test.

 Providing daily reporting about work progress report to QA/QC Manager.

 Inspection Document Preparation.

 Arrange training program(Tool Box talk) of welders, fitters and helpers about joint design, types of materials, use of different type of welding consumable, cause of welding defects & method of control welding defects during welding etc for achieve better quality without delay of progress .

 Ensure to PMC /OWNER that job is going on as per project requirement specification/code /standards for satisfaction.

 Inspection of each and every job activity (like fit-up, weld visual etc.)as per the requirement of inspection & test plan in underground & above ground piping.

 Review test package files & verify that package is mechanically completed and take clearance from PMC.

 Overseeing all safety related arrangements.

Mar 2009 to Aug 2009 Galfar Engineering & Contracting Company S.A.O.G, Muscat, Oman as Mechanical Engineer – Petroleum Development Oman (PDO)’s Project Development of Harweel Cluster Phase 2 Facilities at Harweel Site

Key Deliverables:

 Handling of PDO station BVS1 & BVS18 activities.

 Overseeing workshop activities like fabrication of pipeline, spool and structural support and Equipment Alignment..

 Providing daily reporting about work progress report to Senior Inspector.

 Managing the Man Power.

 Overseeing all safety related arrangements.

Significant Highlights:

 Instrumental in finishing the work with safe standards & within the timelines.

Jun 2007 to Dec 2008 M/S General Engineering Works, Bharuch as QC Supervisor

Key Deliverables:

 Sending NDT request to Third Party.

 See all welding related activities.

 Analysing and handling worked related problems.

 Daily Reporting About Work Progress Report to Company Engineer.

Sep 2006 to Apr 2007 AL-BALAGH Trading & Contracting Co. W.L.L., Doha Qatar as QC Supervisor

Key Deliverables:

 Working as QA/ QC (NDT L-II) Supervisor and PTW Holder (L-I) of Qatar Petroleum.

 See all welding related jobs .

 Working in Pipe Line Project for repair & replacement of PWI & Oil Pipe Lines of Qatar Petroleum in Dukhan Fields.

 Sending NDT request to Third Party.

 Daily Reporting to Qatar Petroleum Job Officer & the Company Engineer.

Significant Highlights:

 Gained knowledge & understanding about the different work permits like hot, cold, confine space, etc.

 Coordinated with Qatar Petroleum Permit applicant for work permit and daily work.

May 2002 to June 2006 Videocon Narmada Glass (A Division of Videocon Int. Ltd.) in Mould Shop Department, in CMM Section as Supervisor.

Key Deliverables:

 Operating CNC M/C.

 Manufacturing T.V. Picture Tube’s Glass Panel & Funnel Parts like Mould, Shell, Bushing, Distributors, Plunger, and Pedestal.

 Reporting to the Engineer.

 Operating CMM (co-ordinating measuring machine) M/C. Measuring on this M/C panel & funnel glass, and all other activities that are used in the manufacturing of panel & funnel glass like plunger, mould, Shell,

 Visual Inspection Of fixture, pedestal, bushing, distributors by verniar calliper & Micrometer .

Education

 B.tech In Mechanical engineering continue from KSOU , Karnataka.

 Diploma in Mechanical Engineering from Shri K.J. Polytechnic, Bharuch, Gujarat Technical Education Board, Gandhinagar, Gujarat in OCT-2001 with 72.16% marks.

 S.S.C from G.S.E.B., Gandhinagar in MAR-1998 with 73.44% marks.

 

TRAINING UNDERGONE

 Completed Basic Fire Watch Training from Qatar International Safety Center W.L.L. Qatar in 2007.

 Trained on PTW System.

 

IT SKILLS

 Well versed with Ms-Office and Autocad-2000.