Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

CV, India based Welding and Coating Inspector

I am currently available for work
Serial No: 16062

List top 5 skills: coating inspection, quality control, welding inspection
Short Bio:

I have done diploma in mechanical engineering and I have more than 12 years experience in the field of inspection. I have completed AWS -CWI, NACE 1 certification, ASNT L-II RT, MPT, LPT, UT. Along with this Recently IELTS is completed with 7 bands.

Current location: 

Rajasthan, India - View on map

Nationality: 

INDIAN

Preferred Sector of Employment: 

Oil, Gas and Energy

Spoken languages: 

english, Hindi

Locations I am interested in working:

Anywhere



Qualifications

ACADEMIC QUALIFICATION:-

• Diploma in Mechanical Engineering from Board of technical Education, Jodhpur in the year 2001.
• MBA from ICFAI (Distance Learning Program) under study.
• IELTS – Overall 7 Band and 6 in each module – Nov 2014.

PROFESSIONAL QUALIFICATION:-

• CWI (Certified Welding Inspector) from American Welding Society (AWS) in 2006.Valid up to Dec 2015.
• NACE Coating Inspector – 1 in June 2014.(Cert No. 53439)
• ASNT LEVEL II in RT, UT, MPT & LPT.
• BARC level-II in RT.

Career Summary

1. Consolidated Contracting Company Australia Ltd 05 July 2013 to 21Dec 2013
Designation: QC Inspector – Welding
Project Undertaken:- QCLNG & APLNG project 42” Export pipeline LNG project, QLD.

Responsibilities:- Tie-in Crew

• Welder Qualification witnessing and recording parameters.

• Inspection of Material as per approved specification.

• Transferring the H No & Pipe No after pipe cutting.

• Welding Electrode Handling.

• Ensuring the required WPS & Welder List are available at site and welder is aware of the parameter of the WPS.

• Recording and verification the WPS parameter at Site like weather condition, Welding current, Amperage, travel speed, Polarity.

• Carrying out Visual Inspection of Weld joints as per acceptance criteria of the applicable code and in addition to acceptance criteria mentioned in relevant procedures/ specifications.

• Coordinating with NDT department for weld joint as per NDT matrix.

• Witnessing Weld joints Repair and submit NDT request.

2. Brunel India Pvt. Ltd. 13 Nov 10 to 24 June 13
Designation: QA QC Engineer ( Seconded to Cairn India Ltd.)

A) Project Undertaken: March 13 to 24 June 13

Bhogat Terminal Project (The terminal consist of facilities include Crude oil storage tanks, Export Booster pumps, Export Pumps, Light Flushing oil storage tanks, Power generation facilities for the pipeline SEHMS system, Steam Generation package for tank heating, Utility Air systems, Fire protection system, STP and all associated buildings, Terminal Infrastructure and Utilities. Team Size-14 ABS Inspector

Responsibilities include:

• Review of Project Procedures and Formats.

• Review of WPS and NDT procedures.

• Witness of Procedure Qualification and Mechanical Test.

• Monitoring TPI for Inspection works.

• Second Party Audit of Contractor as per Project ITP/ QAP.

• Issuing and close out of NCR.

• Representing Weekly Project meeting with Contractors as well as TPI.

• Reviewing the weekly KPI of contractors.

• Preparing weekly Repair Analysis report.

• Controlling the Project repair rate less the 2% by Training & Award o Welders and supervisors.

• Visual inspection and coating inspection.

• Conduct test to determine prevailing weather condition ( RH, Dew point, Substrate temperature and ambient temperature).

• Ensuring degree of cleanliness of as per specification requirement.

• Verify surface profile and check as per specification.

• Holiday Test of coating.

• Test Pack review for Hydro test.

• Ensuring all outstanding works is mentioned in Punch list if any.

• Witness of Hydro test of Piping and tanks.

• Verification of Petro IT of all project Documentation .

• Witnessing of Flushing & drying activities in compliance to procedure.

• Assisting with Pre-commissioning activities.

• Final Document Hand over to commissioning.

B) Project Undertaken: 13th Nov 10 to March 12

Bhagyam Trunk Pipe Line project (Construction, installation, testing, pre-commissioning and commissioning of the 24” production fluid pipeline, 24” water injection pipeline, 8” HDPE pipeline, SEHMS including tie-in to the facility at the Well Pad 15 & MPT). (Contractor: Punjlloyd & TPI: ABS inspection) Team Size – 7 ABS Inspector)

Responsibilities include:

• Review of Project Procedures and Formats.

• Review of WPS and NDT procedures.

• Witness of Procedure Qualification and Mechanical Test.

• Witness of Coating procedure, Cold field bending of Pipe.

• Monitoring TPI for Inspection works.

• Second Party Audit of Contractor as per Project ITP/ QAP.

• Issuing and close out of NCR.

• Representing Weekly Project meeting with Contractors as well as TPI.

• Reviewing the weekly KPI of contractors.

• Preparing weekly Repair Analysis report.

• Controlling the Project repair rate by Training & Award o Welders and supervisors.

• Weld Visual inspection and coating inspection.

• Conduct test to determine prevailing weather condition ( RH, Dew point, Substrate temperature and ambient temperature).

• Ensuring degree of cleanliness of as per specification requirement.

• Verify surface profile and check as per specification.

• During painting, conduct WFT check, conduct visual inspection to check Sag and other paint film imperfections.

• Conduct Holiday and Adhesion test and conduct repairs prior Lower in and backfilling of pipeline

• Test Pack review for Hydro test.

• Ensuring all outstanding works is mentioned in Punch list if any.

• Witness of Hydro test of Pipelines.

• Verification of Petro IT of all project Documentation .

• Witnessing of Cleaning, Gauging, Flushing & drying activities in compliance to procedure.

• Assisting with Pre-commissioning activities.

• Final Document Hand over to commissioning.

3. J P Kenny (Wood Group India Pty Ltd.) 16 June 08 to 11 Sept 10
Designation: Welding Inspector ( Seconded to Cairn India Ltd.)

Project Undertaken:
Barmer – Salaya pipeline Project (24 “Pipeline for Crude Oil line with 1” pipe line for SEHMS to maintain operational temp. and 8 “Gas Pipeline for Heat Generation with Three Terminals and Thirty Eight Above Ground Installations). Location: Storage Terminal at Viramgam near Ahmedabad. (Contractor: Indian Oil tanking Ltd).

Responsibilities include:

• Review of Project Procedures and Formats.

• Review of WPS.

• Witness of Procedure Qualification and Mechanical Test.

• Witness of Welder Performance Qualification test

• Electrode Qualification test.

• Issuing and close out of NCR.

• Reviewing the weekly KPI of contractors.

• Preparing weekly Repair Analysis report.

• Controlling the Project repair rate less the 2% by Training & Award o Welders and supervisors.

• Weld Visual inspection.

• Incoming material inspection as per QAP and specification.

• Test Pack review and mechanical clearance for Hydro test.

• Ensuring all outstanding works is mentioned in Punch list if any.

• Witness of Hydro test of Piping and tanks.

• Verification of Petro IT of all project Documentation .

• Witnessing of Flushing & drying activities in compliance to procedure.

• Assisting with Pre-commissioning activities.

• Final Document Hand over to commissioning.

• Follow up with EPC Contractor for Engineering, Procurement and Construction of Tank and Piping Works.

• Reviewing the Inspection and Progress reports.

• Interaction with Contractors for smooth running of the Project.

• Erection, Assembly (Mechanical) & Commissioning of MLP, Solar GTG 4 MW Capacity (3 Nos).

• Pre-commissioning & commissioning of Packages.

4. Reliance Engg. Associate Ltd. Jan 07 – June 08
Designation: Consultant

Projects Undertaken: – East – West Gas pipeline from Kakinada to Bharuch (48” dia line, working pressure 98 bar and test pressure 130 bar) project. (Contractor: China Petroleum Pipeline Bureau).

Responsibilities include:

• Witness of Procedure Qualification and Mechanical Test.

• Witness of Coating procedure, Cold field bending of Pipe.

• Issuing and close out of NCR.

• Representing Weekly Project meeting with Contractors.

• Reviewing the weekly KPI of contractors.

• Preparing weekly Repair Analysis report.

• Controlling the Project repair rate by Training & Award to Welders and supervisors.

• Weld Visual inspection and coating inspection.

• Test Pack review for Hydro test.

• Ensuring all outstanding works is mentioned in Punch list if any.

• Witness of Hydro test of Pipelines.

• Verification of Petro IT of all project Documentation .

• Witnessing of Cleaning, Gauging, Flushing & drying activities in compliance to procedure.

• Assisting with Pre-commissioning activities.

• Final Document Hand over to commissioning.

• NDT Interpretation (Radiography, DPT & MPT).

• Reviewing the Inspection and Progress reports.

• Interaction with Client and Contractors for smooth running of the Project.

• Field joint coating & Bending of pipes.

• Conduct test to determine prevailing weather condition ( RH, Dew point, Substrate temperature and ambient temperature).

• Ensuring degree of cleanliness of as per specification requirement.

• Verify surface profile and check as per specification.

• During painting, conduct WFT check, conduct visual inspection to check Sag and other paint film imperfections.

• Conduct Holiday and Adhesion test and conduct repairs prior Lower in and backfilling of pipeline.

• Handover of RT Films.

5. Indian Oiltanking Limited April 06 – Jan 07
Designation :- QA QC Engineer

Indian Oil tanking Ltd is one of the leading Piping & Pipeline EPC Contractor undertaking and executing projects of Oil, Gas & Petrochemical Companies like HPCL, IOCL, BPCL, GAIL and NRL etc.

Projects Undertaken:
Composite work for Siliguri Marketing Terminal of M/s NRL (Tanks & Piping works).

Responsibilities included:

• Preparing Project Procedures and Formats.

• Preparing WPS and NDT procedures.

• Welder Qualification test.

• Witness of Procedure Qualification and Mechanical Test.

• Preparing Weekly KPI and submission to client.

• Preparing weekly Repair Analysis report.

• Controlling the Project repair rate less the 2% by Training to Welders and supervisors.

• Incoming material inspection report preparation and verification as per QAP/ specification.

• Preparing Consumable record and ensuring proper handling, proper storage and identification.

• Ensuring First In First Out procedure followed for consumables.

• Visual inspection of Weld Joints.

• Interpretation of NDT.

• Vacuum box testing.

• Peaking and Bending of Tank.

• Dimensional check of shell and roof.

• Oil chalk test.

• PWHT of Weld joints.

• Ensuring the required WPS & Welder List are available at site and welder is aware of the parameter of the WPS.

• Recording and verification the WPS parameter at Site like weather condition, Welding current, Amperage, travel speed, Polarity.

• Conduct test to determine prevailing weather condition ( RH, Dew point, Substrate temperature and ambient temperature).

• Ensuring degree of cleanliness of as per specification requirement.

• Verify surface profile and check as per specification.

• Determine DFT as per specs and check for paint imperfections.

• Conduct Holiday and Adhesion test.

• Preparing Calibration list of Instruments.

5. AVASARALA AUTOMATION LTD. Sept 05 – April 06
Designation :- QA QC Engineer

Project Undertaken:
Handling, Installation, Alignment of End-shield Calandria Assembly, CS Liner FM Vault, CV Top Hatch Beam & Associated components, Reactivity Mechanism & Coolant channel installation in RAPP-6.

Responsibilities included:

• Preparing Project Procedures and Formats.

• Preparing WPS and NDT procedures.

• Welder Qualification test.

• Witness of Procedure Qualification and Mechanical Test.

• Preparing Weekly KPI and submission to client.

• Preparing weekly Repair Analysis report.

• Incoming material inspection report preparation and verification as per QAP/ specification.

• Preparing Consumable record and ensuring proper handling, proper storage and identification.

• Ensuring First In First Out procedure followed for consumables.

• Visual inspection of Weld Joints.

• Interpretation of NDT.

• Vacuum box testing.

• Ensuring the required WPS & Welder List are available at site and welder is aware of the parameter of the WPS.

• Verification the WPS parameter at Site like weather condition, Welding current, Amperage, travel speed, Polarity.

• Conduct test to determine prevailing weather condition ( RH, Dew point, Substrate temperature and ambient temperature).

• Ensuring degree of cleanliness of as per specification requirement.

• Verify surface profile and check as per specification.

• Determine DFT as per specs and check for paint imperfections.

• Conduct Holiday and Adhesion test.

• Preparing Calibration list of Instruments.

6. L & T, HED Oct 04 – Aug 05
Designation :- QA QC Engineer

Project Undertaken:
Handling, Installation, Alignment of End-shield Calandria Assembly, CS Liner FM Vault, CV Top Hatch Beam & Associated components, Reactivity Mechanism & Coolant channel installation in RAPP-5.

Responsibilities included:

• Preparing Project Procedures and Formats.

• Preparing WPS and NDT procedures.

• Welder Qualification test.

• Witness of Procedure Qualification and Mechanical Test.

• Preparing Weekly KPI and submission to client.

• Preparing weekly Repair Analysis report.

• Incoming material inspection report preparation and verification as per QAP/ specification.

• Preparing Consumable record and ensuring proper handling, proper storage and identification.

• Ensuring First In First Out procedure followed for consumables.

• Visual inspection of Weld Joints.

• Interpretation of NDT.

• Vacuum box testing.

• Ensuring the required WPS & Welder List are available at site and welder is aware of the parameter of the WPS.

• Verification the WPS parameter at Site like weather condition, Welding current, Amperage, travel speed, Polarity.

• Conduct test to determine prevailing weather condition ( RH, Dew point, Substrate temperature and ambient temperature).

• Ensuring degree of cleanliness of as per specification requirement.

• Verify surface profile and check as per specification.

• Determine DFT as per specs and check for paint imperfections.

• Conduct Holiday and Adhesion test.

• Preparing Calibration list of Instruments.

• Final Document Hand over

7. D K INDUSTRIAL SERVICES April 04 – Sept 04
Designation :- RT Interpreter

Project Undertaken:
RT interpretation of Piping and components at RAPS 3&4 for shut down work.

Responsibilities included:

• Carry out RT work of Piping and casting.

• Developing the RT films.

• Preparing and reviewing RT films

.8. Isotope Teknica Ltd Dec 02 – Mar 04
Designation : NDT Inspector/ Site In charge

Project Undertaken:
KCP Ltd at Aarkonam, Chennai.

• Shut down work at NRL, Guwahati.

• Offsite piping at MRL, Chennai.

• Work shop at L&T Powai, Mumbai.

• Shut down work at IGPL Nagothane, Mumbai.

Responsibilities included:

• Carry out RT work of different type of Piping and casting.

• Developing the RT films.

• Preparing and reviewing RT films.

• MPI of weld joints.

• LPT of various types of jobs.

9. TECHNO ENGINEERS Sep 01 – Dec 02
Designation : Trainee Engineer NDT
Project Undertaken:
Operation work at RAPS- 3&4 in QA Section.

Responsibilities included:

• NDT Assistance

 

Languages :