Experienced International TIG, GTAW, SMAW Welder

Available
Serial No: 5704
Skills keywords: 
Current location:  Indonesia - View on map
Nationality: Indonesia
Preferred Sector of Employment:  accounting and finance

  • Qualified to make plate or pipe welds of any size on all base material, all thickness and pipe diameter of any size and all position
  • Performs skilled supervisory work in directing the work of subordinate craftsmen involved in welding
  • Responsible for assigning tasks among subordinates and personally participating in the more difficult tasks
  • Work assignments are received in the form of instructions,
  • Responsibility for deciding work methods and other technical matters, Prepares cost estimates and estimates of labor and material. Work is performed under general direction of an administrative superior and is reviewed during and at the completion of projects.
  • Plans, assigns, schedules, and supervises the work of skilled and trades helper subordinates on welding,
  • Maintains and makes repairs to welding equipment.
  • Prepares routine work and time reports and maintains standard records.
  • Establishes safety and work performance standards, Performs related work as required in welding department
  • Welding in 6 G / all positions
  • Ability to read and interpret WPS - Welding Procedure Specification
WELDING CERTIFICATION
  • SPECIAL METALS INCONEL 622 – AWS A5.14 ERNiCrMo-10
  • SPECIAL METALS INCONEL 112 – AWS A5.11 ERNiCrMo-3
  • ASME IX, material specification F-No.6/4,SA 106 P91/All of P5B,(ER 90 S - B9 / E9015 – B9)
  • LLOYD’S REGISTER QUALITY ASSURANCE – ISO 9001
  • U K A S Quality Management
  • MIGAS
  • SNI -13-3032-2002, material specification A790 UNS S32760 as QW.423 (ASME SEC IX)
  • SNI – QW – 404 - QW- 350 - (ASME SEC IX) Boiler
  • ASME – QW 144/QW 302.4, QW 191/QW302.2, ASME - 03 R1
  • AWS D 1.1
  • ASME IX Single VEE Spec: A106 GR. B (Uphill 6G/QW 461.9)
  • BLKI Indonesia / Standard SNI
WELDING TALENT
  • TIG/GTAW – 5G – 6G & All Position
  • Duplex:  A790 UNS S32760 (QW.423) SFA 5.9 & SFA 5.4 Filler Metal ER 2594 & E-2594-15
  • Carbon Steel:  SA 106 Gr. B Filler Metal ER70S G & E 7016
  • SA 516 Gr. 70 Filler Metal ER70S G & E 7016
  • Alloy Steel: A 335 Gr. P12 Filler Metal ER. 80S – G & E 8016
  • Stainless Steel: SA 312 Filler Metal ER – 316 L
  • A358 – TP 321H (QW 423) Filler Metal ER 347 (QW 433)
  • ARC / SMAW – 5 G – 6 G & All Position
  • SMAW – 6G All Position Down hill : 6010 - 7010
  • FCAW – GS: Carbon Steel, Stainless Steel 316
Start Date: January 25, 2013

Position: Welder GTAW - SMAW (INCONEL 622 – 122)

Company: PT. Nippon Steel & SUMIKIN Engineering CO.LTD (NSENGI Singapore) and its subsidiary Nippon Steel & SUMIKIN Construction Malaysia SDN.BHD ( NISCOMA ) Oil & Gas Project Division

Industry: Steel Plants, Environmental Solutions, Marine Engineering & Construction, Pipeline (Energy Pipelines), Building Construction and Steel Structures, Technical Development and Business Development,OFFSHORE SERVICE, Engineering, Fabrication base for Oil & Gas Business in Indonesia and Mooring base for KUROSHIO (Derrick and Lay Barge)

Location: DLB KUROSHIO-1, (CARIGALI HESS – NISCOMA – NSENGI ) Involved in BULAN-B Wellhead Platform Installation Project owned by CARIGALI HESS Operating Company SDN.BHD Executed Installation of three Legged BULAN-B WELLHEAD PLATFORM (BLB WHP) BLB to BLA 16” CRA PIPELINE & RISER Installation for BULAN-B and BULAN-A Wellhead Platform

Department:Welding

   DUTIES AND RESPONSIBILITIES:
  • follow medical tests, Must pass drug screen & criminal background check
  • Pass by Visual & NDT for WPQT Pipe 12” GTAW-SMAW(6G)
  • Pass Training Sea Survival
  • following the morning gymnastics
  • actively follow safety toolbox meeting
  • comply with all regulations the derrick / lay barges KUROSHIO 1
  • Perform  welding in accordance orders based welding procedure
  • reported the results of work to Supervisor
  • Offshore Crew
PERTAMINA Refinery RU II Dumai (24 may, 2012 until 20 June, 2012) as Welder GTAW-SMAW

Job Location: (Shutdown) Area – 211 HCC PERTAMINA RU II, Dumai – Indonesia

Job Detail: Follow medical tests & Safety induction, Must pass drug screen & criminal background check welding pipe 36 " on ring bottom - 347 duplex, in welding using GTAW and SMAW processes made more ER347 and E347. Ensure clean the surface of the part to be welded with a grinding machine, grinding disc should match the material to be welded, welding accordance welding procedure by owner (PERTAMINA)

Ensure welding equipment feasible to use, with a check and prepare before welding
each welding inspection by inspector from PERTAMINA and NDT tests with 100% penetrant process

Report to superiors about the work that has been completed or if there is a problem

AZURA TECHINDO UTAMA (15 April, 2012 until 15 may, 2012) as Welder FCAW-GS

Job Location:  AZURA fabrication shop trades & manufacturing, Cikarang – Indonesia

Job Detail: welding in a workshop in PT. AZURA, roller punch diameter 30", stainless 316.

Ensure clean the surface of the part to be welded with a grinding machine, grinding disc should match the material to be welded, welding accordance welding procedure by PT.AZURA

Ensure welding equipment feasible to use, with a check and prepare before welding

In welding with FCAW process using CO2 shielding gas, with Test NDT UT 100%

Welding is done gradually over on rotator machines that have been prepared by PT.AZURA

Report to superiors about the work that has been completed or if there is a problem

SPIECAPAG - PNG - LNG BRISBANE (20 October, 2011– 20 December, 2011) as Manual Welder

Job Location: Pipeline PNG ExxonMobil Project, Papua New Guinea

Job Detail: follow medical tests, Must pass drug screen & criminal background check.

Safety induction and introduction of natural and cultural state of Papua New Guinea from SPIECAPAG safety officer

Following the welder qualification test and welder-stamp collection, with the test material pipe 32 "position 6G uphill, SMAW process using welding consumable 6010 -7010 / 7016-9018 Pipe 2 "with a full GTAW process using welding consumable ER80S-G(all-welded must pass visual, x-ray and UT)

Ensure clean the surface of the part to be welded with a grinding machine, grinding disc should match the material to be welded, welding accordance welding procedure by owner (Exxon Mobil)

Ensure welding equipment feasible to use, with a check and prepare before welding

Actively following toolbox safety meeting each morning, welding on pipe spool fabrication work shop-Kopi Station

Report to superiors about the work that has been completed or if there is a problem

PT. JURONG ENGINEERING LESTARI (May, 2011 – 15, October 2011) as Welder / Welder Foreman

Job Location: MUARA TAWAR Power Plant Expansion Project

CHANDRA ASRI PETROCHEMICAL - Shutdown

Job Detail: Follow safety induction required by the owner, following the record of welding qualification for welding pipes 2 "- 6G uphill with full process using the GTAW welding consumable ER70S-G/TGS 50, provisions pass visual and X RAY

Performs skilled supervisory work in directing the work of subordinate craftsmen involved in welding

Responsible for assigning tasks among subordinates and personally participating in the more difficult tasks

Work assignments are received in the form of instructions,

Responsibility for deciding work methods and other technical matters, Prepares cost estimates and estimates of labor and material. Work is performed under general direction of an administrative superior and is reviewed during and at the completion of projects.

Plans, assigns, schedules, and supervises the work of skilled and trades helper subordinates on welding,

Maintains and makes repairs to welding equipment.

Prepares cost estimates of labor and material; orders supplies, material, and equipment.

Prepares routine work and time reports and maintains standard records.

Establishes safety and work performance standards, Performs related work as required in welding department

PT. TRUBA JAYA. (22, September 2010 until 24, March 2011) as Welder Boiler

Job Completed: PAITON#3, 1 x 815 MW CFPP PROBOLINGGO - INDONESIA

Job Detail: Medical checkup by company, drug screen & criminal background check.

Pass company’s weld test, using GTAW/SMAW process, in 6G position on 6” & (2”-full TIG) schedule 180 pipe (5/8 " thick), with an ER70S-G/TGS50 root pass and a 7018 filler and cap. ASME code: TIG & SMAW

Work in confined & elevated areas. Ensure clean the surface of the part to be welded with a grinding machine, grinding disc should match the material to be welded, Ensure welding equipment feasible to use, with a check and prepare before welding.

Weld panel of tube boiler at plant and fabrication in lay down follow safe work standards set by the company for at altitude. Perform welding accordance welding procedure by owner MBK (Mitsui Bussan Kaisha)

Report to superiors about the work that has been completed or if there is a problem

PT. INWHA INDONESIA (21 March 2010 to 10 Sept 2010) as Welder GTAW - SMAW
Project Completed: JAMBI MERANG Development Gas Production Facilities

Job Detail: Medical checkup by company, drug screen & criminal background check.

Pass company’s weld test, using GTAW/SMAW process, in 6G position on 6” with an ER2594 root pass and an E-2594-15 filler and cap. ASME IX: TIG & SMAW

Ensure clean the surface of the part to be welded with a grinding machine, grinding disc should match the material to be welded, Ensure welding equipment feasible to use, with a check and prepare before welding.

Weld pipe in fabrication spool shop at INWHA workshop, follow safe work standards set by the company for at altitude. Perform welding accordance welding procedure by MIGAS

Report to superiors about the work that has been completed or if there is a problem

PT. REKAYASA INDUSTRIES (01 August 2009 until 01 November 2009) as Welder GTAW - SMAW

Project Completed: BRUNEI METHANOL Project. Kuala Belait, Brunei Darussalam

Job Detail: Medical checkup by company, drug screen & criminal background check.

Pass company’s weld test, using GTAW/SMAW process, in 6G position on 6” with an ER80S-G root pass and an E7018 filler and cap.

Ensure clean the surface of the part to be welded with a grinding machine, grinding disc should match the material to be welded, Ensure welding equipment feasible to use, with a check and prepare before welding.

Weld pipe in fabrication spool shop at PT.REKAYA workshop, follow safe work standards set by the company for at altitude. Perform welding accordance welding procedure by Owner (Mitsubishi)

Report to superiors about the work that has been completed or if there is a problem

PT. APECO.(06 June 2009 until 25 June 2009)

Project Completed: PLTU SURALAYA Unit 3 – INDONESIA POWER (SHUTDOWN) Suralaya

DAEWOO NIG. LTD - Nigeria (Oct 16, 2008 until January 2009)

Project Completed: GBARAN UBIE OIL & GAS Project. Bayelsa – NIGERIA

PT. J. Ray McDermott Indonesia (August 18, 2006 until April 23, 2008)

Project Completed: PTTEP ARTHIT Project, Central processing Platform, BATAM Fabrication, and Thailand Offshore field

PT. Nippon Steel (May 23, 2006 until August 07, 2006)

Project Completed: TOTAL SISI NUBI project, Central processing Platform. BATAM – INDONESIA

PT. J. Ray McDermott Indonesia (January 18, 2006 until April 24, 2006)

Project Completed:

-WOODSIDE LNG PHASE V EXPANSION (R-2706) Australia.

-SU TU VANG PROJECT CENTRAL PROCESSING PLATFORM (R-2837) CUU LONG JOINT OPERATION VIETNAM.

-PTTEP ARTHIT CENTRAL PROCESSING PLATFORM BATAM, Indonesia & ARTHIT   PLATFORM OFFSHORE field Songkla, Thailand.

PT. TRUBA JURONG. Eng. (February 28, 2005 until December 28, 2005)

Project Completed: CILACAP 2 X 300 MW T.3104 Coal Fired Steam Power Plant Project, Cilacap - INDONESIA

PT. J. Ray Mcdermott Indonesia (December 05, 2003 until January 29, 2004)

Project Completed: FPSO CONOCO project, JVPC CPP VIETNAM Project. BATAM – INDONESIA

PT. PROFAB Indonesia (July 30, 2002 until January 29, 2003)

Project Completed: Vessel Fabrication of CONOCO Project, Heavy fabrication for onshore and offshore facilities, BATAM

FORMOSA HEAVY INDUSTRIES, TAIWAN R.O.C (February 05, 1998 until February 25, 2000)

Project Completed: MAILIAO Power Plant Project, MAILIAO - TAIWAN ROC

PT. TRUBA JURONG. Eng. (March 15, 1996 until February 03, 1997)

Project Completed: TAMBAK LOROK Power Plant Project, Semarang – INDONESIA

ADDITIONAL SKILLS & ATTRIBUTES


  • First Aid & Fire Fighter (MSTS Sea Survival)
  • Full Drivers license: Class (A) Vehicle (B) Motorbike.

AWARDS AND ACHIEVEMENTS


  • Best Welder at PT. Mc. Dermott 2007
  • Best Welder at PT. Mc. Dermott 2008

Spoken languages: english, indonesia, melayu
Location I am interested in working: Anywhere





popup-img