Highly Experienced Construction And Piping Engineer

Available
Serial No: 4188
Skills keywords: boilers, comminsing, fpso, gas oil petro, hidraliks, piping manager, refenary

Short Bio:

I have total 35 years of professional experience in the project engineering phase of onshore in HVACs, Hydraulics Oil and Gas, LNG, Refinery, Petrochemical,Fpso , gas processing plant,. Motors , Fabrication, Modification and Erection of Piping & Structural steel construction and Hydro test, Pre Mechanical commissioning Experience ranges from the fabrication, erection, line checking, Pressure testing, Hydraulics ,manaitance and the civil bidders’ Hse ,Motors .
Reinstatement and Pre commissioning of various process equipments, piping systems, equipments. And coordinating with various departments including Quality control, field engineering, Planning, fabrication and Erection site erection crew. Etc.
Plans & supervises the construction functions -Ensure the proper completion of the work on schedule with approved drawings, specifications, quality limitations. Monitor sub-contractors work to ensure proper compliance with all technical aspects. -Knowledge of ASTM/ASME/API standards.
Specialties
Site Manager , Representative / Construction, Piping Process and Hydro test Supervisor and Onshore Facilities,Fpso , Hydraulic , Havc and motors
Oil and Gas, Petrochemical, Power and Energy Projects
Fabrication, Installation & Hydro testing, Line check up to Pre-commissioning and commissioning activities , Manaitance Hall
PIPING Manager / MECHANICAL, Motors, SUPERVISOR /PIPING Q/C INSPECTOR. Hydraulics
Company’s
Fabricon gti , Jacob,s eng , Ol3 nuclear Areva , Ship yard’s ,Cni ,Cmi , Alstom , Shell , Man Diesel
A. ROBERTO

Current location:  Brazil - View on map
Preferred Sector of Employment:  accounting and finance

Feb . 23, 2012:    Oakwuell Ship yard Fpso

Position:   Sr. Manager / Construction  (Fugro marine )

Project:  Fugro  ASIA

Duties & Responsibilities:

  • Perform final inspections for piping, fabrications and constructions.
  • Responsible for final checking and inspections of the lines for punch list acceptance
  • Attend meeting and updates daily progress activities and results of daily inspections on sites and ship’s on yard
  • Responsible for final inspections such as line checking, punch listing, testing of spools.HSE
  • Perform the final inspection of hydro testing and pneumatic testing.
  • Review and apply the management procedures.
  • Perform system punch list and punch clearing,
  • Work Shoppe Manager and  P&IDs Data Sheets
January 2011: Cravtanlagen to Areva OL3  Finland

Position: Piping Superintendent ,shop

Awarded: Productivity Excellence Award HSE Excellence Performance

Award

Project: Ol3 Nuclear power station.

Duties & Responsibilities:
  • Planning and scheduling of daily activities of his discipline and area of responsibilities.
  • Assigned as Shift Superintendent construction shop
  • In-charge supervision for pre-commissioning works
  • Supervision for re-instatement, blinding and punch list clearing
  • Making good quality and comport to the standard
  • Responsible for the test package doing for partial blowing and flushing
  • Report directly to the chief or to department head.
  • Supervision of commissioning activities for newly erected plant.
  • Requesting of materials for BOM as per ISO pipe spools and drawing for fabrication as well as field installation.
  • Supervision for installation of branch supply pipes to CPF.
  • Supervision of punch list works, arranging of small bore connection, pipe support , ventilation and Hse
  • Have contact with the client, consultant and other sub-contractors related to their works in order to develop a smooth construction and safe works.
August 28, 2010: Jacob,s Engineering Construction Supervisor

Position: Piping Superintendent P&IDs Data  

Project: TPC Belgium, Terminal

Duties & Responsibilities:
  • Supervised and monitoring the work of sub-contractor if they are conforms to the requirements and design specification.
  • Supervision for piping works including of installation of pipe supports and re- routing. Carry out line checking, visual inspection of pipe, punch listing and coordinate with the design department for any interference wherein modification is need.
  • Counter check the material take-off to be used by the sub-contractor and monitoring the welders to make sure that they are following welding procedure specification.
  • Responsible in coordinating with the concerned personnel regarding the noted deficiency during erection to immediate action.
  • Direct supervision of the task force team to catch up the schedule of priority line.
  • Check daily work schedule of sub-contractor and implement safety of work.Hse
  • Conduct tool box meeting once a week.
  • Review, analyze and evaluate daily and monthly progress report
Julie 12, 2010: Shell Pernis

Position: Piping Supervisor/ Inspector

Awarded: Outstanding Performance

Project: Fabricon gty

Duties & Responsibilities:
  • Responsible to all test package and inserting test limits Boiler’s
  • Assigned for general arrangement of isometric drawing and line checking.
  • Responsible in coordinating with the concerned personnel regarding and noted deficiency during erection and immediate action.
  • Emphasis always safety measures and precaution to my subordinates when working to their respective areas. (done regularly)
  • Carry out line checking, visual inspection of pipe, punch listing and coordinate with the design department for any interference wherein modification is need.
  • Reviewed and approved the documents of fabricated spools prior to delivery at site and evaluate daily and monthly progress report.
  • Check daily work schedule of sub-contractor and implement safety of work.
January 2, 2010: Fabricom gty Amsterdam

Position: Piping Supervisor

Project: Recycle power stations 

Duties & Responsibilities:  P&IDs Data Sheets
  • Responsible for piping erection as per piping arrangement and elevation.
  • Assigned in installation and erection of pipe supports and spools.
  • Responsible for Punch list Clearing and constructions
  • Check daily work schedule and implement safety of work.Hse
  • Assigned in fabrication of spools and supports based on isometric drawings.
  • Review of regular status of works accomplishment, determine and unsolved problems or any condition when support s needed by my superior.
March 21, 2010: Fabricom gty

Position: Piping Supervisor/ Inspector

Project: Shell Pernin Boilers

Duties & Responsibilities:
  • Supervision of all punch list clearing and re-instatement bases on pre punch and post punch.
  • Counter check the material take-off to be used by the sub-contractor if it is conforms on the design specification.
  • Monitoring the welders to make sure that they are following welding procedure specification.
  • Coordinate construction procedure with client representatives and sub-contractor before starting new activity.
  • Supervision of system blowing and flushing.
  • Open coordination to the workers before and after the works was done.
  • Instructed craftsman on their scope of work in proper workmanship and proper proceedings.
Aug 11, 1998 to Feb 28, 2010: Hascom Energy Shout Africa

Position: piping supervisor

Project: Boiler’s Maintenance  

Duties & Responsibilities:
  • Assigned to works on test package and piping assemble
  • Responsible for test limits and test blinds which is done for hydro testing, pneumatic tests, flushing and air blowing ,piping assemble ,Hse
  • Responsible for the installation of (OF) flow orifice and (FE) flow elements.
Statoil Hidro Norway Mongstad Nem Company

Position: piping superintendent

Project: Boilers

Duties & Responsibilities:
  • Assigned to works on test package and piping assemble
  • Responsible for test limits and test blinds which is done for hydro testing, pneumatic tests, flushing and air blowing ,piping assemble and Hse
  • Responsible for the installation of (OF) flow orifice and (FE) flow elements.
  • Supervision of all punch list clearing and re-instatement bases on pre punch
  • Ensure that all pipes and supports were passed on the client approval, general arrangements, isometric drawings and line checking.
  • Prepare and submit progress report based on the percentage of the job competed.
  • Planning and scheduling of daily activities and his discipline and area of responsibilities.
Jan 1996 to January 19, 1998: Lloyd Ship Yard German

Position: Piping, Havac Superintendent - Motors ,Hse ,Hydraulics  

Duties & Responsibilities:
  • Responsible for the arrangement of test package, P&ID and isometric drawings
  • Assigned for pre-commissioning for partial blowing constructions. Piping , motor’s Assemble Man
  • Proper coordination to the QC inspector and QC department head.
  • Planning and scheduling of daily activities. And Fpso
  • Responsible for the loop of drawings used in fabrication.
  • Responsible for the drawings inserted to the test package
Nov 4, 1990 to July 15, 1996: U.S.A Hall America

Position: Mec Engineering Manaitance

Project: Naval (6 Ship’s cruise)

Duties & Responsibilities:
  • Line checking and Material take off.
  • Open coordination to the workers before and after the works was done.
  • Installation and erection of small jobs – maintenance.
  • Supervision of utility lines to Ship.
  • Assigned for underground Motor’s .and Turbines

Spoken languages: basic German, Engligh, French (Basic), italian, Portuguese and English, Spanish (intermediate)
Location I am interested in working: Anywhere





popup-img