Management position with over 22 years experience in the field of construction as QA and QC.

Current location:  Central Luzon, Philippines - View on map
Nationality: Philippines
Preferred Sector of Employment:  , Oil, Gas and Energy, Transport and Logistics
Spoken languages: english
Location I am interested in working: Anywhere

PERSONAL PROFILE

Seeking  for a management position with over 22 years of success in quality assurance and quality control engineering for civil and structural construction. Ability to lead a team, performed and directed a variety of activities, meet deadline, attention to detail, guided inspection, examination, testing procedure to the structure inspected and demonstrate capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations. I have contributed, managed and completed large scale greenfield and brownfield project on time, on budget and with high quality standard. I have worked in FEED, EPC, EPCM, EPIC and PMC companies. These include the never ending promotion of total quality management program and ISO 900X standard implementation. Excellent working knowledge of company safety standard policies, auditing, procedures, codes and standard and specification. Productive, multi-task oriented, adapt well to change, good work ethics and meticulous. Excellent troubleshooting, problem-solving, and decision -making skills. Trained as multi-discipline inspector with broad knowledge in welding, piping, MEPS and architectural works. Working knowledge of Word, Excel, Windows, E-mail and Internet.

 

EDUCATION

Western Mindanao State University, Philippines                                          Key Skills: TQM, ISO, Audit, QA, QC

 B. S. Civil Engineering, 1988                                                                                                  Inspection, Testing, Code,

                                                                                                                                                                 Standard & Specification

 

 

PROFESSIONAL EXPERIENCE                                                                    

SRK Consulting (PTY) Ltd, Blantyre, Malawi, Africa                                                                                                 Jul 2013-Present

Quality Manager

Project Handle:140 + 90 km. Nacala Corridor Railway Project

SRK Consulting is a South African founded Group of consulting engineers and scientists providing a comprehensive range of services to the natural resource industries. Our professional team provides environmental management consulting services to stakeholders in the sustainable utilisation of human and natural resources. Environmental, economic and social assessments and systems. Sustainability management, assessment and reporting. Auditing, monitoring and evaluation. Environmental and social costing. Multi-stakeholder management and needs analysis. Facilitation. Public involvement and conflict management. Training and capacity building. Mine closure planning. Organisational development. Social and labour planning.

  • Particular responsibility for reviewing and researching the procurement documents, quality manual, project technical specifications, drawings, reference codes, standards, applicable procedure, and instruction requirement of the organization.
  • Reviewed and implemented Quality Control Inspection Plan (QCIP), Inspection Test Plan (ITP) and checklist to ensure work flow compliance is met accordingly.
  • Conducted in-process and final inspection, examination, testing procedure to the item inspected and demonstrate capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
  • Audited construction site proper documentations if present before and during construction work.
  • Provided quality matters interpretations, technical and administrative assistance to project management.
  • Audited calibration records of equipments, measuring devices and inspection gages.
  • Generated audit inspection report (AIF) and/or nonconformance reports to the findings, give recommendations, corrective action and preventive measures to avoid reoccurrence.
  • Inspected and monitored on-going construction stages of the drainage system (precast & cast-in-situ culvert), 28 no. of 400 to 600 meter length railway bridges (cast-in-situ piles, pile cap, column pier, pier cap, precast pre-stress girder, abutment, precast deck slab, cast-in-situ slab & wall, rail track foundation (grading, leveling, sloping), sleeper concrete precast fabrication and installation (spacing, alignment & fastening), rail fabrication (flush butt & exothermic weld) and installation (horizontal & vertical alignment, fastening), ballast installation (gradation) and compaction (profiling).

 

 

Shimizu Corporation, Donggi Senoro, Sulawesi, Indonesia                                                                                   April 2012-May 2013

QA/QC Manager

Project Handle: Donggi Senoro LNG Greenfield Project

Shimizu Corporation is a leading architectural, civil engineering and general contracting firm, offering an integrated, comprehensive planning, design and build solutions for a broad range of construction and engineering projects worldwide.

  • Particular responsibility for reviewing and researching the procurement documents, quality manual, project technical specifications, drawings, reference codes, standards, applicable procedure, and instruction requirement of the organization.
  • Managed Quality Management System.
  • Developed and implemented Project Quality Plan identifying key procedures and monitor implementation.
  • Developed and implemented Quality Control Inspection Plan (QCIP), Inspection Test Plan (ITP) and Checklist to ensure work flow compliance is met accordingly.
  • Convened pre-inspection meeting (PIM) commented and approved ITP’s prior to project start up.
  • Monitored and analyzed in-process and final inspection, examination, testing procedure to the item inspected and demonstrated capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
  • Recruit, trained, developed and managed a team of 20 QA/QC personnel to oversee, inspect the quality activities of the project.
  • Attended client project productivity, quality and safety management meeting.
  • Responded all scheduled internal and external audit in compliance with the project requirements and submitted results for management review action.
  • Provided quality matters interpretations, technical and administrative assistance to project management.
  • Audited QA/QC documentations, calibration records of equipments, measuring devices and inspection gages.
  • Generated nonconformance reports to the findings, give recommendations, corrective action and preventive measures to avoid reoccurrence.
  • Analyzed and resolved quality information and issues like client complained, non-conformities and site audit results.
  • Furnished and reported Key Performance Indicator (KPI) ensuring the project is defined, measured,    monitored and actions taken for any identified gap.
  • Monitored, checked and compiled all quality documentations and successfully handover to the client.
  • Inspected and monitored on-going construction stages of 800mm thick wall by 90m circumference and 40 m height LNG Cryogenic Pre-stressed Tank using DOKA formworks, Combined Concrete & Steel Pipe Racks, Equipments and Utility Foundations.

 

PRODECO (Property Development Company) Ltd

Onne Port Area, Oil & Gas Free Zone, River State, Nigeria                                                                                           Oct 2008-Feb 2012

QA/QC Engineer (Lead)

Project Handle: Residential Bldg, 750m Jetty Berth(offshore), 7 Storey Bldg., Warehouses, Water Treatment Plant, 3×6 Storey Bldg. at Heliconia Park, NLNG Road Construction and other various projects. Client: Nigerian Port Authority, Total, Chevron, Exxon Mobil, Baker Hughes and Intels.

PRODECO operates in Nigeria with two companies: Prodeco (Property Development Company) operating within the main territory of Nigeria and Prodeco International operating in Oil & Gas Free Zones. The first company was incorporated in March 1996 as a property development company. Over the years, PRODECO has engaged in building, marine, and infrastructural construction for various clients in the oil and gas industry. The excellence of its pre-fabricated concrete technology has been recognized across the industry and its experience and achievements have grown year by year. PRODECO is considered a leader in the commercial build-to-suit construction sector on the grounds of its exceptional expertise and knowledge across every phase of a project. With this underlying strength, PRODECO strives to establish a business approach in tune with the times. PRODECO’S commitment to quality, schedule and budget has made it the most reliable of construction companies for its clients.

  • Particular responsibility for reviewing and researching the procurement documents, quality manual, project technical specifications, FEED, drawings, reference codes, standards, applicable procedure, and instruction requirement of the organization.
  • Developed and implemented Quality Control Inspection Plan (QCIP), Inspection Test Plan (ITP) and Checklist to ensure work flow compliance is met accordingly.
  • Monitored and analyzed in-process and final inspection, examination, testing procedure to the item inspected and demonstrated capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
  • Recruit, trained, developed and managed a team of 34 QA/QC personnel to oversee the project quality activities.
  • Provided quality matters interpretations, technical and administrative assistance to project management.
  • Audited QA/QC documentations, calibration records of equipments, measuring devices and inspection gages.
  • Generated nonconformance reports to the findings, give recommendations, corrective action and preventive measures to avoid reoccurrence.
  • Furnished trend analysis report to all major deficiency to prevent reoccurrence, save time and accumulated cost.
  • Inspected construction of bentonite slurry pond, guide wall, pile caps, tie rod installation, sand cement stabilization, vibro concrete column, bollard/fender installation and slabs for 850 meter Jetty/Pier
  • Inspected piling subcontractor in excavation of 25 meter depth front and back diaphragm wall foundation using Kelly guide and grab crane with bucket sizes of 1.2m x 2.0m. Installation of pre-fabricated reinforcement and concrete pouring using 0.2m diameter submerged steel pipes. Soil cement drilling/soil boring pile by using drilling/rotating crane injecting cement grout to prevent underground soil pressure.
  • Conducted inspection on asphalt plant by verifying the type and amount of materials in used, acceptance test of materials, proportions (mix design), batching and mixing, check accuracy of batching devices, and all equipment working condition.
  • Inspected construction of major asphalt roads from sub grade preparation (line & grade, grade leveling, compaction & test), 300mm thick sand cement stabilization sub base course (leveling, compaction, curing & test), 100mm thick base course (leveling & compaction), bitumen primer (even spraying & uniformity), 60mm thick asphalt base course (temperature, alignment, grade, texture, leveling & compaction), bitumen tack coat (even spraying) and 40mm thick asphalt wearing course (temperature, alignment, grade, texture, leveling & compaction). Checked for final level if within tolerance, take core samples to verify the density, thickness and marshal stability of the asphalt laid.
  • Inspected construction of rebar and formwork for pile caps and slabs, precast concrete element fabrication, anchor bolt installation, erection of steel structure, metal decking and stud bolt installation, block work installation and plastering, tiling work, MEPS activities and all associated architectural finishes for buildings and warehouse.

 

Samsung Corporation, Yas Island, Abu Dhabi, UAE                                                                                                  Feb 2008-Sept 2008

QA/QC Manager

Project Handle: Tabreed District Cooling Scheme-01 & 02 New Plant Room

The Samsung Group’s principal activities are international trading and investment, engineering and construction. Trading and Investment includes Energy natural resources development, plant supply and operation, manufacture sale of electronic materials, brand merchandising for textile and basic materials, trading and investment of chemicals, iron and steel. Engineering and Construction includes construction of skycrapers, high-tech factory facilities, roads and bridges, port, power plants and housing. The Group operates in 42 countries.

  • Managed Quality Management System
  • Developed and implemented project quality plan, inspection test plan (ITP) and checklist as per standard specification and project requirement with code A client approved status.
  • Prepared and reviewed method of statement and procedure
  • Provided quality matters interpretations, technical and administrative assistance to the project management.
  • Monitored and analyzed in-process and final inspection, examination, testing procedure to the item inspected and demonstrated capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
  • Chaired QA/QC site weekly meeting with the subcontractor.
  • Audited project quality management system, calibration records of equipments, measuring devices and inspection gages.
  • Generated nonconformance reports to the findings, give recommendations, corrective action and preventive measures to avoid reoccurrence.
  • Evaluated contractors and suppliers performance for future reference to QA programs
  • Confirmed piling system, method of driving, testing and documentations. Around 250 piles were successfully completed.
  • Inspected bars, embedment and formworks for building foundation.
  • Witnessed actual mass concreting and check actual slump and temperature at site prior to pouring.

 

Dar Al Handasah Consultants, Dubai, UAE                                                                                                                           May 2004-Jan 2008

Site Inspection Engineer

Project Handle: Car Park A and B, Curb side and Terminal 1 Expansion; Elevated Metro Rail Transit Terminal 1 Station, Dubai International Airport

The Dar Group is a global network of distinguished consulting firm which are provided services in architecture, engineering (FEED), planning and project management for civil, industrial and building works.

  • Reviewed and implemented approved inspection test plan to ensure documentation and inspection requirements are included in the work packages.
  • Analyzed final design and shop drawing, planning and execution.
  • Provided quality engineering support to ensure implementation and compliance standard are met.
  • Ensured health and safety management system is adhered at site.
  • Conducted visual and dimensional inspection for in-process and final inspection for all site activities.
  • Inspected pre-cast pre-stressed beams and hollow core slab.
  • Confirmed piling system, method of driving, testing and documentations. Around 500 piles were successfully completed.
  • Inspected bars, formworks for pile caps, columns, beams, slabs for roads, bridges and buildings. Witnessed actual concreting and check actual slump and temperature at site prior to pouring.
  • Witnessed, inspected concrete surface, bitumen paint application, protection board installation, backfilling and compaction test of dune sand and marl soil.
  • Conducted inspection on batching plant (Concrete and Asphalt) by verifying the type and amount of materials in used, acceptance test of materials, proportions (mix design), batching and mixing, check accuracy of batching devices, and all equipment working condition.
  • Inspected construction of major asphalt roads from sub grade preparation (line & grade, grade leveling, compaction & test), 200mm thick sub base course(leveling, compaction& test), 70mm thick base course (leveling & compaction), bitumen primer (even spraying & uniformity), 65mm thick asphalt base course (temperature, alignment, grade, texture, leveling & compaction), bitumen tack coat (even spraying) and 55mm thick asphalt wearing course (temperature, alignment, grade, texture, leveling & compaction). Checked for final level if within tolerance, take core samples to verify the density, thickness and marshal stability of the asphalt laid.
  • Monitored and witnessed erection of steel structures, check actual alignment and plumbness.
  • Supervised  architectural and MEPS works.

 

EEI Corporation, Philippines                                                                                                                                         Feb 1991-Mar 2004

Is an YGC group of companies with ISO 9001 certification, concentrating in construction of refineries, power plants and high rise buildings locally and other countries.

List of project are:

QC Civil Inspector, Berri Gas Plant, AMEC/Saudi Aramco, KSA, 2001-2004 (Brownfield Project)

Sr. QCE, 4 Storey Two Northgate Cyberzone Building, Filinvest, Phils. 2000-2001

Sr. QCE, PBR Expansion, Sulfur and New Flare System, Kawasaki, Phils. 1999-2000

Sr. QCE, 55 Storey Pacific Plaza Twin Towers, DCI, Phils. 1998-1999

Sr. QCE, 2 x 300 MW Masinloc Coal Fired Thermal Power Plant, TOA/MHI/NPC, Phils. 1995-1998 (Greenfield Project)

QCE,  PNOC-EDC Geothermal Redundant Re-injection Line, Phils. 1994-1995 (Brownfield Project)

QCE,  CADP-Proposed Refinery Plant Structure, Phils. 1993-1994

QCE,  PNOC-EDC Geothermal Bacman II FCDS Associated Works, Phils. 1992-1993 (Brownfield Project)

QCE,  LST Bin and Conveying System, Hi- Cement Corporation, Phils. 1991-1992

  • Particular responsibility for reviewing and researching the procurement documents, quality manual, project technical specifications, drawings, reference codes, standards, applicable procedure, and instruction requirement of the organization.
  • Developed and implemented Quality Control Inspection Plan (QCIP), Inspection Test Plan (ITP) and Checklist to ensure work flow compliance is met accordingly.
  • Conducted in-process and final inspection, examination, testing procedure to the item inspected and demonstrate capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
  • Recruit, trained and developed QC personnel who will contribute to the productivity and profitability of the organization.
  • Provided quality matters interpretations, technical and administrative assistance to project management.
  • Audited project quality management system, calibration records of equipments, measuring devices and inspection gages.
  • Generated nonconformance reports to the findings, give recommendations, corrective action and preventive measures to avoid reoccurrence.
  • Furnished trend analysis report to all major deficiency to prevent reoccurrence, save time and accumulated cost.
  • Attended client project productivity, quality, safety and sour gas(H2S) management meeting
  • Inspected deformed bars and formworks for different structures like pipe racks, equipment, vessel and flare foundations, core or shear wall(using 50mm diameter coupler type bars and steel forms), slabs(using steel table forms), service and passenger elevators, boiler, turbine and generator foundations, smoke stack(250 meter high concreting using slip forming), columns, slabs, beams, walls, manholes, roads and buildings. Witnessed actual concreting.
  • Conducted and witnessed material testing like plate bearing, penetrometer and compaction test (using conventional and radioactive equipment that can detect the degree of compaction within 15 seconds) for soil, grading analysis, specific gravity, moisture content, absorption, unit weight, fineness modulus, organic impurities, abrasion and soundness of aggregates, compression, rebound hammer, core and probe penetration test for concrete.
  • Furnished and verified design mix computation and data based on aggregates test results and codes. Conducted and witnessed trial mix of high strength concrete ranges from 2,000 psi (14 MPa) to 10,000 psi (69 MPa) and check actual slump, unit weight and temperature.
  • Conducted inspection on batching plant (concrete and asphalt) by verifying the type and amount of materials in used, acceptance test of materials, proportions (mix design), batching and mixing, check accuracy of batching devices, and all equipment working condition.
  • Inspected construction of major asphalt roads from sub grade preparation (line & grade, grade leveling, compaction & test), 250mm thick granular base course (leveling, compaction & test), bitumen primer (even spraying & uniformity), 80mm thick asphalt base course (temperature, alignment, grade, texture, leveling & compaction), bitumen tack coat (even spraying) and 60mm thick asphalt wearing course (temperature, alignment, grade, texture, leveling & compaction). Checked for final level if within tolerance, take core samples to verify the density, thickness and marshal stability of the asphalt laid.
  • Conducted inspection on various steel structures like fabrication (surface cleaning, cutting & machining, punching &drilling, straightening, bending & rolling, fit-up & reaming, fastening-bolting, riveting & welding, finishing, QC & NDT, surface treatment and transporting), erection (location, position & orientation), installation(alignment, plumbness & levelness) of columns, girders, beams, gratings, stairs, handrails, trusses, other structural members and bolt tightening of high strength bolts.
  • Inspected architectural and finishing works like tiling, partition, fixtures and curtain walls.

 

Department of Public Works and Highways, Philippines                                                                                       May 1990-Dec 1990

QC Inspector, a government independent construction operating in rural and urban areas with common projects like school buildings, roads, drainage system and basketball courts.

  • Verified all site activities like checking of bars and formworks for floor slabs and beams, laying of hollow blocks, plastering and finishing, sub base and base coarse preparation for roads and asphalt laying.
  • Checked reinforced concrete pipe laying and invert elevation. Conducted random load test on the concrete pipe.

 

ACE Construction Company, Philippines                                                                                                                    Jun 1989-Mar 1990

QC Inspector, a private construction dealing in roads and bridges project.

  • Inspected bars and formworks for columns, beams and slabs for bridges
  • Checked preparation of sub base and base coarse prior to laying of asphalt for major roads. Conducted test and submit result for evaluation.

 

CERTIFICATES

Diploma in Six Sigma

Diploma in Business Management and Entrepreneurship

Diploma in Project Management

Fundamentals of Project Management

Introduction to ISO 9001:2008

Introduction to Six Sigma

Internal Auditor Course

Aramco Certification for QC Civil Inspector

1st TQM Advance Development Course Seminar

Total Quality Management & Company Rules and Regulation and Orientation

Nuclear Gage Training Humboldt Scientific, Inc.

Concrete Inspection & Material Quality Control Seminar

Trouble Shooting Fresh Concrete Problems Encountered

Technical Report Writing Seminar Class III

Road & Bridges Construction Seminar

Safety, Quality and Productivity

Total Quality Management

Introduction to ISO 9000 and Basic of Quality

Civil Inspection

Design Mix Preparation and Evaluation