Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

Senior Pipeline Engineer Seeking Work Anywhere

I am currently available for work
Serial No: 5559
(05/09/1968, male)
List top 5 skills: auto-cad, CESAR II, microstation, ms office, PDMS
Qualifications and Skills:

As a skilled graduate Civil Engineer regular study from Pune University and degree is acredited by Saudi Council of Engineers in the year of 1993.

Previous Employment Details:

As a skilled graduate Civil Engineer with extensive (oil & gas pipeline project) experience of 24 years and at present in Saudi Aramco Project in Saudi Arabia involved in the field of planning, engineering, construction management, operation & maintenance of high valued projects,from pre-feasibility studies upto commissioning and handling over to Company,scope planning, budgeting and resource administration in Oil / Gas sector for renowned EPC organizations,i.e. JGC, Samsung, Dodsal , Petronet, HPCL-Mittal .

Current location: 

Uttar Pradesh, India - View on map

Nationality: 

India

Preferred Sector of Employment: 

Oil, Gas and Energy

Jan 2013 to Till Date: An Engineering Contracting Company, UAE/KSA.

Designation: Project Manager

Functional Area: Explore the bidding process, set up a dedicated team and project deliverable to the client in Oil and Gas and associates companies.

Achievements: 1.Review of pipeline detailed drawings, Data Sheet, De-tour corridor of pipeline alignment sheet with Main Line Contractor at Abu Dhabi for short term.

2. Assignment of P&ID, PFD and GAD Drawing for Sulphur Recovery Unit: Cooling Water Refrigeration and Cooling Water Expansion Drum for South Par Gas Field Development Phases 20&21 ASSALUYEH-IRAN Offshore Facilities at Dubai Head Office.

3. Site Inspection under Oil and Sector with Aramco approved EPC contractor under

Pipeline-maintenance job for plant and pipeline rectification, CP, Electro-Mechanical Works at Al-Kobhar.

 

 Jan 2012 to Jan 2013: BYUCKSAN India Pvt. Limited, Gurgaon.

Profile: BEC provides comprehensive professional engineering & construction services in all engineering sectors.

Designation: Chief Technical Officer

Functional Area: Inception of Foreign based subsidiary engineering Company in Indian operation, concurrently focused on three major verticals 1.Infrastructure 2.Environmental 3.Oil and Gas.

Achievements : 1.Preparation of P&ID,GAD,Pipeline Compressor Stations and Terminals-                     ,Site Supervision  at Various Locations of GAIL,ONGC,OIL India Ltd. 2.Project  Management Consultancy Services for City Gas Pipeline Project at NCR and various location of India.



3. Consultancy Services for ROB at Various Locations of Faridabad-Mathura Route. 4. Preparation of Detailed Project Report of existing Industrial area of Delhi-Cluster-I&III.5.Preparation of Feasibility Report & DPR –Fly Over at Various locations of North-East Regions.6.Empanelment of approved multidisciplinary   Drawings ,consultant-MNC under local Government authorities –Gujarat, Haryana, Punjab, Goa, Kerala and Tamil-Nadu.


20 Sep 2011 to 31 Dec 2011: ABSG Consulting Company –Risk Management Company, Abu Dhabi. (Short Term Contract)

Profile: ABS Consulting is a global safety, risk and integrity management company serving the oil and gas, chemical and petrochemical, nuclear, government, maritime.

Designation:   Consultant- Client Inspection Oil & Gas Project. GASCO, Abu Dhabi.


Occupation or position held   Sulphur Handling Project-II- Client Inspection Oil & Gas Projects.GASCO Abu Dhabi.

Civil Inspection and related activity of Engineering, Procurement, Construction and Commissioning (EPC) works for the SHR Granulated Sulphur Transportation and Management Project on Lump Sum Turnkey Basis. Ruwais Sulphur Handling Project , Civil QA/QC ,Bored Piling(800MM Dia,14.05m depth-Pile Toe 8.05m,Pile Cut Off 5.30m,1150 Nos), Rail Car Building(Single Pour 950 Cum), Conveyor, Marine & Dredging Construction, Trial Mix-Concrete Mix Design C-50 ,Nuclear Density Test, Pile Integrity Test.-300Tonne,Slope and Scour Protection for Causeway and Ship loading area of --2.9m.Inspection of the Vibro compaction works of the fill material 463mx38 m of the Causeway between the land and ship loading area.

20 July 2009 to 20 Sep 2011 - MP Birla Group Company, New Delhi

To formulate strategy for accelerated growth of the business in City Gas. The Birla Group is one of the largest Industrial House in India.The Group owns over 500 factories in a wide range of industries such as textiles, manmade fibers, cables,Woolens, automobiles, industrial and textiles machines, sugar, paper, shipping, cement,jute, aluminum, copper, fertilizers, chemicals, power plants, non-ferrous semis, etc. The Group also has over 40 joint ventures and management contracts in several countries. Countries such as Nigeria, Kenya, England, Philippines, Indonesia, Thailand, Uganda, Ethiopia, Egypt, etc.

Occupation or position held business head (GM) City Gas Development Projects.

Main activities and responsibilities
  1. GSPC Gas Company Limited: 150 Km Gas Pipeline Project.
  2. Bhagya Nagar Gas Limited: 220 Km Gas Pipeline Project.
  3. CGS Construction under Haryana State for Gail Gas Limited.
  4. Gujarat Gas Company: MDPE Laying and Maintenance.
  • To scout for new business opportunities in Contracting in the Oil & Gas sector.
  • To advise the Management on commercial / technical viabilities of identified opportunities.
  • Single point responsibility for all the pre bid, bidding and post bid activities for acquiring new Business.
  • Develop relationship with key decision influencers in target organizations for business development & interfacing with clients at various levels.
  • Identify JV partners for eligibility & technology and negotiate.
  • Identify, negotiate and close deals with sub-contractors for execution of the pipeline projects.
  • Develop framework and guidelines for sub- contractors.
  • Establish detailed operational / deliverable milestone for pipeline projects.
HPCL MITTAL ENERGY LIMITED NOIDA - June 08 – July 09

Joint Venture with HPCL and Mittal Investments Pte. Ltd. An L.N. Mittal Group Company for Implementation of Guru Govind Singh Refinery. A Green field refinery project State of art refinery.  With an initial capacity of 9 MMTPA costing of Rs.18000 Cr. located at Bhatinda.

Occupation or position held Pipeline Manager

Main activities and responsibilities

To scrutinize bid-offer, reply of the technical queries, the project-tender finalization and contract award; Review the award documents of followings:
  1. The Crude Oil Terminal of over 8,00,000 KL capacity at Mundra Port, Gujarat
  2. The 1,014 Km long Crude Oil Pipeline from KOT at Mundra, Gujarat to Guru Gobind Singh Refinery at Bathinda, Punjab along with associated facilities.
  3. One pumping cum Intermediate Pigging (IP) Station at Dhansa. 2 IP stations, 17 SV stations and one
  4. Dispatch station at Kot which involves all Civil, Electrical, and Piping. Mechanical and Instrumentation work.
Petronet MHB Ltd.,(ISO-9001:2001,ISO-14001 :2004 &OHSAS-18001:1999 accredited mulity-product Petroleum transport pipeline Company, Bangalore, (India).  JULY 2004 to JUNE-2008.

Profile: PMHBL is a company promoted by Oil & Natural Gas Corporation Limited, Hindustan Petroleum Corporation Limited and Petronet India Limited with 28.77%&7.89% equity shares by each company. Apart from this the leading banks are having 34.57% stake, after restructuring.

Occupation or position held Station-In-Charge {Hassan Pumping & Receiving Station}

Main activities and responsibilities.
  • Overall responsibility of operation, maintenance, inspection, major equipment & station facilities, mainline & ROW
  • Patrolling, safety & fire- fighting system, environmental impact assessment.
Basic/routine functions:
  1. Pipeline Operations at Hassan for delivering the product to HPCL-Mktg terminal & flow diversion to Bangalore end.
  2. Monitoring of all equipment’s & Mainline stations
  3. ROU Inspection & CP Check.
  4. To upkeep original licenses of CCOE, Factory NOC, Excise Dept, Joint Directors-Legal/Statutory cases,
  5. Compliance of Third Party Audit Reports.
  6. Prepare Preventive Maintenance Plan for Pump, Motors, Valves, Fire Fighting Pump, etc,
  7. To comply with all statutory and Government regulations on HSE.
  8. General Correspondence on Pipeline, M&R, and P&A matters, statutory approvals.
Petronet VK Ltd., Reliance (MTF), Sikka, Jamnagar (India) - MAY 2001 to JULY 2004:

Profile: A Joint Venture Company of Petronet India Ltd., (PIL), Indian Oil Corporation Ltd. (IOCL) & Reliance Industries Limited (RIL) to construct a pipeline between Vadinar to Kandla (117Km) to transport petroleum products manufactured by RIL Refinery, the pipeline is having operating capacity of 7.5 MMTPA (24”OD 17 KmX0.281”-24”ODX56KmX0.438” (Offshore)-24” ODX44Km 0.406” API5L52 Grade).

Occupation or position held: Station-In-Charge {SIKKA Pumping & RIL Marine Tank Farm}

Functional area: Tank farm and terminal station jobs from inlet manifold to delivery manifold through different tank hook-ups, tank fabrication, erection, civil works from excavation to dyke wall formation, mass concreting, brick masonry, structural works etc, civil rehabilitation jobs during quake effected terminal station building done under strict guidelines of CBR Code, application grouting materials on damaged portions – control room buildings, township buildings at both locations done by inserting holes of 16 mm dia. Drill inserting to BRASS nozzle by putting 1:1 mix of epoxy, resin hardener by applying the required compressed air pressure, VHF tower installation and erection, to provide supports the projects of tank from construction, control room buildings, in which maintaining a Resource Planning Allocation System, Customer & Vendor Change Order Management and Customer Bids & Proposals. Reviews existing project related procedures and policy and also support in Smooth & safe operation of product pipeline PLC-SCADA, updating of daily throughput, oil-accounting & monthly reconciliation report, manual tank gauging, coordinating and integrating with IOC for day to day pumping as per SPM. checking of dip-memo, shift production optimization, ensure proper entry & upkeep of the log-books, checking the monthly reconciliation report, coordinating with other location-in charges in respect to arrival of parcel/Delivery of product at mouth/interface quantities, review and modify standard operation procedures when required & conduct related training to subordinates, delegation of tasks to subordinates and close monitoring also, attending the monthly meeting with others PSU' s to decide the next month SPM.

SEPT 2000 to APRIL 2001: Dodsal Ltd., Bangalore.

Worked as: Spread-In Charge.

Client: Bangalore Water Supply & Sewerage board (BWSSB).

Contract no. W-4C. Const. of Clean Water Transmission

Name of project: Bangalore water supply (l.9m OD X Plate thickness 11mmX12.5mm internal lining, + 30mm gunniting).

Functional area: Project Planning & Scheduling for laying of pipeline, from the river Cauvery, which was 98km from the city, under the four stages head, water is pumped in stage against total head of 545metres, Construction of VALVE CHAMBERS, THRUST-BLOCKS, RAFT INVERT-LEVEL, SADDLES, SCOUR-VALVES, MAN HOLES, KINETIC AIR-VALVES, BUTTERFLY VALVES, ENCASED CONCRETE, PIPE SPECIAL BENDS, TEES, REDUCERS, EXPANDERS etc. along the route road/rail crossing etc., gunniting for bare-pipes, bedding (Class A,S&N), bends as per angles, horizontal & vertical upward, downward vertical for transmission main. Contract-agreement with local vendors, resource planning, coordination with other departments to execution, test-pack preparation, documentation with clients and close monitoring over sub-contractors job progress. Organizing and participating management review meetings and making presentations. Develop resource mobilization chart for material / manpower. Project monitoring on a weekly & monthly basis to ensure that no slippage occurs & when unavoidable problems occur, to find solutions such that the intermediate & final milestones are not jeopardized whilst ensuring that the overall cost of the project is not increased.

NOV 1999 to JULY 2000: Dodsal & Co. L.L.C. (SULTANATE OF OMAN).

Worked as: QC Inspector (Civil).

Client: Petroleum Development of OMAN (P.D.O.).

Contract no. C889008.

Name of Project: ATHEL Project, AL-NOOR-Phase-l (Facilities).

Functional area: Carry out inspections & verifications for all civil & structural works, inclusive material, ensure that the excavation, concrete, bbs, pour cards, erection, grouting of all civil & equipment & test plan for the civil, equipment installation, carries out the various stage inspections & tests, records findings, Liaison with the client’s inspection & construction staff intermediate & final acceptance PMC’s work, carry-out inspection of works & nominated sub-contractors /suppliers as directed by approved inspection & test plan, Carried out vendor inspection of material/equipment, when required, prior to shipment of material/equipment to site prepares material release reports, Liasioning with PMC staff to ensure that all required testing has been performed, advise PM staff of poor quality work deficiencies detected during inspections & assist/advice on remedial works required, Report deviations from requirements from contract documents. Construction of Production station crude oil, batching-plant operation, operation on round the clock basis, mass-concrete production, inspection with third party for structural concrete up to dia.36mm & M-35, grouting with insert- plates, foundation-bolts etc. Quality-assurance documentation, qualification, validation & audits. To support the site engineers in respect to monitoring the requisite quality of the job in compliance with requirements of the QTP & Guidelines of contract document, supervise the quality of production-concrete at batching-plant & plant area/battery limit area and calibrate the batching-plant as per requirements too also, maintain the throughput of production-concrete inspection of heavy reinforcement & checking pour cards upto36 mm dia. of reinforcement, preparation of stacking bends (cold), preparation of BBS, Grouting of structural foundation-bolts, insert-plates, cube-test, etc.

JUNE 1999 to OCT 1999: Dodsal Pte. Ltd., DUBAI (U.A.E.).

Worked as: Civil Engineer (QA/QC-Civil).

Client: SNAMPROGRETTI-ITALY (ADNOC), U.A.E. Contract no.304700.

Name of Project: ASAB-GAS Development & Gathering Station, ABUDHABI.

Functional area: Laying of pipeline from ASAB to RUWAIS, cased crossing under HDD, civil construction works at different valve stations, PROCTER Test over BERMING, various civil activities done by M/S GRANITE Company of UAE for Gathering Station from Excavation to Erection of equipment's, joint concrete coating done over the pipeline joints applying epoxy, also handled the receipt of shipment, cargo-handling for the materials which were being used in the project. Perform PROCTOR test on soil-surface to find-out the maximum dry density (MDD) and optimum moisture-content etc. Report for project expenditure and schedule progress on a regular basis to head office. Coordinate technical tendering evaluation activities relating to specific job with local companies also, negotiating to reduce the cost of the same, assisting in compliance of budgets and coordinates approvals with Management, cost-estimates, obtaining quotations, specific vendor liaison and securing various regulatory permissions.

JAN 1998 to MARCH 1999: Dodsal &CO.L.L.C. (Sultanate of OMAN).

Worked as: Civil Engineer.

Client: CHIYODA FOSTER WHEELER&CO. L.L.C.

Contract no. ON-PLOT PIPING.

Name of project:2x3.3 MMTPA OMAN LNG TRAINI&TRAIN2, SUR.

In a Joint Venture Company in Sultanate of Oman to fabrication, Erection of Piping , Equipment and Structural Works of comprising Piping of 497158 inch Dia,Equipment Erection of 424 no structural steel of 5787 MT.

Functional area: Receipt, Stacking and Transportation of structural steels from dump-yard to working site after doing some modifications as per schedule structural drawings. Establish the location of TOWER-CRANES at the site also did the required mass concreting for the foundations etc. Camp-construction & finishing, joinery works, plumbing and drainage works, power cables laying with looping with feeder, soak-pits, kitchen flooring, false ceiling, flooring etc. for capacity of 2000 Workers & Staff to provide amenities as per Client HSE Policy. Constructions Erection of FAB. SHOP for CS/ MS/SS/, Car-washing & maintenance facilities, To-establish RIGGING-PLAN, checking foundations, and Crane-signaling s keeping all safety precautions to conform the erection drawing.

APR 1996 to JAN 1998: Dodsal Ltd. Baroda (INDIA).

Worked as: Civil Engineer.

Client: ENGINEERS INDIA Ltd./IPCL-BARODA/DAHEJ.BOOT BASIS

Name of Project: DAHEJ-GANDHAR-BARODA, PLANT/SV Stations.

Functional area: Engineering, Coordinating for Laying of 3 pipelines namely Naphtha, Propylene & Ethylene {8", 6", 6") liquid. Condense vapor and Semi-reach pipeline project, which was based on BOOT BASIS. Perpetrating consolidated project schedules using PERT /CPM, monitoring progress status and analysis of project variances using "S" curves. Construction of Battery Limit Area, Control-roam Building-MCC.H.T. Room, UPS- room, C/R A. C. duct, Telecom-room, Master Control Station SCADA Installation TATA HONEYWELL, providing conceal-conduits, Jetty civil & piping job to hook-up at DAHEJ & concrete-coated pipes lowering on floating & buoyancy basis with DRAG-LINE, Hand—rail fabrication and erection.

AUG 1995 to MAR 1996: Dodsal Ltd., Bharatpur (INDIA).

Worked as: Pipeline construction engineer.

Client: ENGINEERS INDIA Ltd./GAS AUTHORITY of INDIA Ltd. (RAJ).

Name of Project: 36" Dia., 505 Km Gas Rehabilitation. GAIL (India) Ltd. and Expansion Project (HBJ Up gradation).

Worked as: Pipeline Construction engineer.

Functional area: Pipeline-execution from STRINGING to HYDROTEST PIG-RECIEVING, assisting in allocation of manpower requirements at different locations of R.O.W., installation PIPE RACK its platforms etc. Installation of Pipeline warning-markers, Boundary-markers, Directional markers, Logo-marking, Spray-painting etc. Supervise the job of the temporary C.P. included casting, transportation & erection of foundations at different locations along with R.O.W. Measured C.P. voltage as per std. also, measuring the voltage of (-1.5VTO -0.8V) on the extrude surface of pipeline. Evaluating the consumption-rate of ANODE PLATE on the basis of project specification.

DEC 1993 to AUG 1995: Dodsal ltd., SOJAT CITY ROAD (RAJASTHAN) INDIA.

Worked as: Pipeline Construction Engineer.

Client: SKODA INDIA Ltd. SOJAT CITY ROAD (RAJASTHAN).

Name of Project: KANDLA BATHINDA PRODUCT PIPELINES.

Functional area: 22' '/14"dia. product pipeline of KBPL. Construction of SV Stations, Surveying (setting out), stringing, ROW preparation. Levels (Bench-Mark), trenching (controlled blasting with third party), Mainline welding, TI-EN welding, Field joint coating (PEEL-TEST, thickness measurement), Rail/Road crossing, chain age marking, pressure-header fabrication, Pre Hydro-Testing & Post Hydro-Testing for major crossing,OFC Laying, Splice-test, block station construction, barbed wire fencing etc. Cable laying for CP at SV"s and cable related by using l0 sq.mm & 65q.itim armor cables permanent CP on both banks, Sacrificial CP unit installation.

Spoken languages: 

english, Hindi

Locations I am interested in working:

Anywhere