Experienced Oil and Gas Design Engineer

Available
Serial No: 4953
Skills keywords: engineering design system, mto management, pdms administration, piping, project engineering
Current location:  Muscat Governorate, Oman - View on map
Preferred Sector of Employment:  accounting and finance

PRESENT ASSIGNMENT:-

Worley Parsons Company (Oman) LLC - Oct 2011 to Till Date

Project        : - Amal steam Surface Facility.

Client          : - Petroleum Development Oman (PDO)

Role           : - Engineering Design System Cordinator (PDMS Administrator).

Software     : - PDMS Ver. 12SP3/Autodesk Navis work2010

As Team Member following was Key responsibilities handled:-

  • Coordination with project Lead Discipline Engineers as required.
  • Development, and implementation, of new procedures, guidelines and workflows, as required.
  • Regular contact with project PDO PDMSSmartplant Application Project Coordinator’s to ensure client corporate and project procedures and workflows are being adhered to.
  • Implementation and setup of PDMS Application projects
  • Automation Utilities Development to reduce Engineering design System Projects costman-hour.
  • PDMS Applications Drawing and Report Configurationcustomization.
  • Training and instruction on PDMS Application software.
PT. KBR Indonesia- Jakarta - Jan 2011 to Sep 2011

Project        : - Gorgon Project – Barrow Island

Client          : - Chevron Australia

Role           : - 3D Cad Cordinator/PDMS Administrator

Software     : - PDMS Ver. 11SP4/Autodesk Navis work2010

As Team Member following was Key responsibilities handled:-
  • Monitoring and maintaining extract database used in design.
  • Monitoring Global Deamon’s for Project with other Engineering centers
  • Supporting Deliverable Manager for Isometric extraction team.
  • Handling MDS query related modeling and support drawing extraction.
  • Coordination & expediting Cat & spec request for Piping and Inst at KBR Leatherhead & Greenford.
  • Maintaining Spec request log in controlled format to track effortlessly.
Worley Parsons Company (Oman) LLC - Nov 2009 to Dec 2010

Project        : - Amal steam Surface Facility.

Client          : - Petroleum Development Oman (PDO)

Role           : - PDMS Administrator.

Software     : - PDMS Ver. 12SP3/Autodesk Navis work2010

As Team Member following was Key responsibilities handled:-
  • PDMS Project Setup / Spec Writing( Shell Specification)
  • 3D CAD Procedure, Job Notes & Client Review.
  • User support & Team Training.
  • Customized Utilities Development using PML2.
  • DRAFT & ISODRAFT Configuration.
  • MDS Implementation Using Aveva Support Library.
Previous Assignment

Jacobs Engineering India Pvt. Ltd - Feb 2008 to Oct 2009.

Project/Client:-18 various project in work-share environment handled for Leiden Antwerp/Glass glow/Dublin Jacobs Office.

Role:-PDMS Administrator

Environment:-PDMS ver. 11.6 SP3/ Review reality/Engineering Design System.

As Team Member following was Key responsibilities handled:-
  • PDMS Work share Lead Coordinator.
  • Drawing & Isometric Setup.
  • Maintenance of Jacobs In-house applications developed in PML2.
  • PDMS server group philosophy , License utilization reports & controlling.
  • User support (78 Numbers) & Team Trainings.
  • Utilities developed – Clash report Consolidation.
Mott Mac Donald Company LLC - Oct 2007 to Jan 2008

Project: - Qarn Alam Steam Injection plant.

Client: - Petroleum Development Oman (PDO).

Role: - PDMS Administrator.

Environment: - PDMS 11.6 / Jet stream Naviswork.

As Team Member following was Key responsibilities handled:-
  • Project setup & Spec writing.
  • Drawing& Isometric Setup.
  • Pioneering PDMS in Mott-Oman & 3D cad project execution Plan.
  • Coordinator & Monitoring Vendor PDMS activities.
Toyo Engineering India Ltd - Dec 2006 to Sep2007

Project: - Shell Ethylene Cracking Complex-Singapore

Client: - ABB Lummus Global B.V

Role: - PDMS Administrator.

Environment: - PDMS 11.6/ Aveva Clash Manager/ Jet stream Naviswork.

As Team Member following was Key responsibilities handled:-
  • Team supervision & Performance – Team size 20 Modelers.
  • Clash Manager Setup & Configuration to meet Project requirement.
  • Internal & External Isometric Revision Control thought Access –SQL.
  • Coordination with Lead office for Spec & Catalogue issues.
  • Auto Colors setup based on Progress.
  • Night Batch for Review extraction.
SST India Pvt. Ltd - Feb 2005 to Dec 2006

Project /Client:- Captive Power Plant./BHEL

Role:-Piping PDMS designer.

Environment:-PDMS 11.5.

As Team Member following was Key responsibilities handled:-
  • Equipment Modeling ,Pipe Routing & Interference Check
  • Piping GAD Isometric & MTO Extraction.
Offshore Industrial Construction Pvt. Ltd - July 2004 to Jan 2005

Project /Client:-HPCL – Mumbai/ Engineers India Ltd.

Role:-Project Coordinator.

As Team Member following was Key responsibilities handled:-
  • Responsible for planning , Monitoring & Scheduling of Project.
  • Technical Bid evaluation of vendor Offer document.
  • S-curve Preparation.

Spoken languages: english
Location I am interested in working: Anywhere





popup-img