CV, Experienced KSA Based Planning And Project Controls Engineer

Available
Serial No: 23662
Skills keywords: planning, primavera, project controls, proposal contracts, scheduling

Short Bio:

More than 8 Years of Experience in Planning & Project Controls Field,
B.E Mechanical with PMP and RMP certified from PMI USA.
Skills : Primavera, Planning, EoT Claims, Contracts Proposals, Tendering,Master Programme.
Achievement : Delivered Projects within Time and Cost,
Successful 2 EoT claim of 1 year each.

Current location:  Riyadh Province, Saudi Arabia - View on map
Nationality: Pakistani
Preferred Sector of Employment:  Oil, Gas and Energy
Spoken languages: english, Urdu
Location I am interested in working: Anywhere

Profile

An experienced Planning & Project Controls Engineer with extensive knowledge of Project Planning, Controlling & Monitoring tools & techniques and the experience of implementing PMI Standard for Project Management in Organization. Expertise in performing Project Controls Tasks, Forensic claims analysis, Corporate Reporting and Risk Analysis.

Qualifications

Bachelor of Engineering (B.E) – Mechanical Batch 2006
NED University of Engineering & Technology, Karachi

Certifications, Awards & Training

PROFESSIONAL CERTIFICATION:

• RMP (Risk Management Professional) Certification from PMI 2015

Member of PMI International – Member ID : 2389274

• PMP (Project Management Professional) Certification from PMI 2014

Member of PMI International – Member ID : 2389274

PROFESSIONAL COURSES:

• PRIMAVERA ENTERPRISE PROJECT PORTFOLIO MANAGEMENT (P6)
Level: Expert Experience: 10 Years

• MS PROJECT (2010)
Level: Expert Experience: 10 Years

• MS-OFFICE PACKAGE
Level: Expert Experience: 10 Years

PROFESSIONAL TRAININGS RECEIVED:
• Strategic Planning & Decision Making 2012

NED University of Engineering & Technology – Karachi, Pakistan
• Organization Systems 2012

NED University of Engineering & Technology – Karachi, Pakistan
• Gas Turbine Inspection & Maintenance (GE – 9E) 2010
CNPC – Daqing, China

• MCL Natural Gas Compressor Inspection & Maintenance 2010
SBW– Shenyang, China

• Vibration Analysis – Basic Level 2011
SKF – Karachi, Pakistan

• Bearings Failure Analysis 2011
SKF – Karachi, Pakistan

PROFESSIONAL TRAININGS CONDUCTED:

• Advance Project Management (PMP) 2013- Present

• Primavera P6 (Project Management Software) 2011- Present

 

Career Summary

1. HASTIE SAUDI ARABIA L.L.C – Riyadh
Mar 2012 – Present

Position: Senior Planning & Cost Controls Engineer

i. Projects: New Samba Head Quarters (42 Story) Project – KAFD, Riyadh Project Value: 375 M SAR

Client: Samba Financial Group Location: Riyadh, Kingdom of Saudi Arabia

ii. Projects: Sadara Building Projects – Jubail , KSA Project Value: 200 M SAR

Client: Saudi Aramco Location: Jubail, Kingdom of Saudi Arabia

iii. Projects: Nobu Hotel Project Project Value: 50M SAR

Client: Najmatic Location: Riyadh, Kingdom of Saudi Arabia

Tasks Performed:

PROJECT MANAGEMENT OFFICE (PMO) ROLE:

• Preparing and Reviewing Corporate Monthly Reports of Riyadh & Eastern Region within Kingdom of Saudi Arabia

• Implementing PMI Standard for Project Management on assigned Projects.

• Ensuring Project Management Best Practices on the assigned Projects.

• Projects Risk Analysis and Earned Value Management for all assigned Projects.

• Contracts Letter writing and Performing Forensic Claims (EoTs) Analysis and monitoring slippages.

• Preparing Financial Reports for all Projects.

• Monitoring and Controlling Lookahead Programs for Projects on Monthly Basis.

• Presenting Corporate Reports in Monthly Corporate Meeting to GM and Above Management.

• Performed Resource Allocation and Labour Management at Program Level Management.

• Recommending remedial actions in case of progress slippages

• Preparing initiating Project Plans for Upcoming Projects (Proposals & Programme of Works)

• Cost Controlling of the assigned Projects, Review and Analysis.

• Enterprise Resource Planning and Controlling.

• Clients Relationship in Weekly / Monthly Client Meeting.

PROJECT TASKS

• Issue Performance Reports weekly, bi-weekly & monthly for the approved MEP Packages which include Critical Issues, EoT Claims Status, Design, Procurement, Construction (S-Curves, Tables and Logs) and Commercial Section.

• Provide overall P6 oversight and analysis of Project Schedule and progress measurement.

• Prepared cost loaded integrated project schedule (P6) for MEP activities in line with Finishes works for SAMBA Tower.

• Collaborated management in developing/reviewing schedule corrective actions and recovery plans, and making sure needed actions/plans are implemented.

• Prepare Extension of Time Claims and mitigated programmes for slipped Milestones & Variations in the approved programme.

• Monitor & Control progress of Design, Procurement & Construction works.

• Assess & monitors weekly manpower requirement for remaining construction works in coordination with construction managers & team.

1. KARACHI ELECTRIC SUPPLY COMPANY LIMITED- PART OF ABRAAJ GROUP (UAE)
May 2010 – Mar 2012

Position: Project Planning Engineer Project Value: 452 M USD

Project: 560 MW Combined Cycle Power Plant – BQPS II, Karachi

Client: Karachi Electric Supply Company Limited – Part of Abraaj Group (UAE) Location: Karachi, Pakistan

Major Tasks Performed:

• Installation & Commissioning of 03 – 123 MW GE 9171E Gas Turbines & 03 – Natural Gas Compressors

• Installation of 03 – 214 Tons/Hr Heat Recovery Steam Generators & 01 – 190MW HTC Steam Turbine

• Modification of Inlet Air system and modification of Nitrogen Dry Gas Sealing system.

Other responsibilities:

• Monitor & Report Progress by using Primavera P6 while ensuring that the project is executed within schedule.

• Monitors construction activities in the field from the performance management perspective against contract requirements.

• Preparing all Weekly and Monthly look ahead reports. Also presenting monthly report to the Management.

• Preparing equipment master data to be entered into SAP.

• Assisting Manager Planning in monitoring overall project schedule.

• Studies and draws up Preventive, Predictive maintenance and Condition Monitoring schedules for reliable operation of equipment.

• Preparing 3-5 Years Spares List and Workshop Tools list for O&M.

• Works in line with HSE regulation & HSE management systems & ensures compliance of the same subordinates and contractors

• Monitoring Contractor’s quality system and supervising quality performance and documenting nonconforming conditions and assisting on the corrective action process.

• Ensure that all contractual obligations, as required by the O&M Agreement are fulfilled.

2. DESCON ENGINEERING LIMITED
Jul 2008 – Mar 2010

1. Position: QA/QC Engineer

Project: Annual Turnaround of Fauji Fertilizer Bin Qasim Limited –FFBL, Karachi

Client: Fauji Fertilizer Bin Qasim Limited (FFBL) Location: Karachi, Pakistan

2. Position: QA/QC Engineer

Project: Annual Turnaround of National Refinery Limited – Lube II, Karachi

Client: National Refinery Limited Location: Karachi, Pakistan

Job Description:

• Performed a quality inspection before the Client to ensure quality and Safety on the maintenance of Heat exchangers, Air Coolers, Pressure Vessels, Columns and Furnace.

• Carried out Pressure testing of Heat Exchangers, Air Coolers, Vessels and Columns.

• Monitored welding and fabrication jobs on Furnace Tubes, Preparation of WPS and PQR in accordance with ASME Section IX.

• Cleaning and re-tubing of Heat exchangers and Air coolers.

• Verification of all required pipe-welding inspections performed, repairs made when required and re-examined to acceptable results.

• Coordination and monitoring on non-destructive testing requirements of completed weld joints.

3. Al Prince Engineers – PVT Limited
Jul 2006 – June 2008

1. Position: QA/QC Engineer

Project: Maintenance Contract of National Refinery Limited – Lube I & II, Karachi

Client: National Refinery Limited Location: Karachi, Pakistan

Job Description:

• Performed a quality inspection before the Client to ensure quality and Safety on the maintenance of Heat exchangers, Air Coolers, Pressure Vessels , Columns and Furnace.

• Carried out Pressure testing of Heat Exchangers, Air Coolers, Vessels and Columns.

• Monitored welding and fabrication jobs on Furnace Tubes, Preparation of WPS and PQR in accordance with ASME Section IX.

 