Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

CV, Eqyptian QC in Oil and Gas targeting Kuwait

I am currently available for work
Serial No: 16065

List top 5 skills: welding and piping)
Short Bio:

QA/QC Sr. engineer (Tanks, Welding and Piping)
1. Certified Piping Inspector Certificate No (42016).
2. Certified Senior Welding Inspector CSWIP (3.2.2) Cert. No (61068).
3. Certified Lifting Inspector, U.K, LEEA Part1- Group 1- Certificate holder.
4. 16 Years’ Experience as QA/QC Sr. engineer (Tanks, Welding and Piping).
Best Regards,
Abdelazim Hassan Khalil
0097433107899
00201279943424

Current location: 

Egypt - View on map

Nationality: 

egyptian

Preferred Sector of Employment: 

Oil, Gas and Energy

Spoken languages: 

english

Locations I am interested in working:

kuwait



Qualifications & Training

B.Sc. metallurgical Engineering, Egypt.

2nd semester Master degree in Engineering and Environmental Technology, Egypt

Certified Senior Welding Inspector CSWIP (3.2.2) Cert. No (61068).

Certified Piping Inspector API (570) Cert. No (42016).

Certified Lifting Inspector, U.K, LEEA Part1- Group 1- Certificate holder.

Certified NDT Courses level II (M.T _ P.T _ R.T_UT_EMI_VT) acc. to ASNT-TC-1A

Certified Radiography license Cert. NO (1169). (Egyptian Atomic Energy Authori

Oil and Gas Industry Familiarization OG008 (Arab academy for science &technology)

Operations and Quantitative Analysis & Managerial Finance training (AASTMT)

Project management professional training course (American university in Cairo)

Quality assurance program IRCA (American university in Cairo)

Business Administration course (American university in Cairo)

Career Summary

Apr.13 Till Date Company: SPIE oil and gas service. Qatar 1 YEAR / 10 MONTHS
Project: Barzan Train 1&2 Onshore Project.
Client: Ras Gas Company. (Client Representative)
Tank Inspector

 Perform Inspection for New Tanks Constructed as per API 650 and RasGas Project Specifications Different Sizes, materials and Services.

 Witness NDE activities (Vacuum Box test, Oil penetrant test, PT, MT…etc.

 Witness All Dimensional check (Plumpness, Peaking, and Banding, Roundness, shell and roof Nozzles…etc. and Prepare NDE Procedure as per project spec and codes requirements.

 Witness material procurement and Perform inspection as required.

 Perform field fabrication inspection of Bottom, Shell, Roof, Nozzles.

 Witness Tanks and piping related Hydro/pneumatic test.

QA/QC Lead

 The PQE analyses results from ongoing quality surveillance assessments to better focus future PMT surveillances. In conjunction with the PQM, the PQE assesses Contractors quality performance metrics and ensures distribution and visibility across the project.

 Performs PMT construction Surveillance & monitoring of construction activities to support project safety, quality, and Schedule & cost objectives.

 Prepares weekly site report highlighting weekly accomplishments & issues that affect quality.

 Coordinates & performs daily inspection verifications as per ITPs.

 Develops & issues and follow up on deficiency reports(DRs),Corrective action requests & Non-conformance reports(NCRs)& Participates in CTR & Sub CTR Quality Audits

 Conduct final QA/QC audit/surveillance monitoring of each fabricated spools

 Quality issues resolution with contractor & subcontractor.

 Promotes safety awareness & safe performance among PMT team, including contractor personal Ensures deficiencies are identified and resolved.

 Ensures CTRs construction activities are performed per plans, procedures &specifications.

 Liaison & interface with mechanical completion to assist in quality system handover.

 Provides technical advice to PMT Engineering, Procurement & construction on quality issues.

 Interfaces without side entities such as sub CTRs & vendors, assessing products & systems.

 Provides quality feedback of vendor product /service deficiencies found at site.

 Assists in failures/root-cause evaluations & proposed resolutions to nonconformities.

 Coordinates with other discipline Engineers on any information/activities affecting facilities quality

 Ensures contractor has relevant, up-to-date codes, Standards, Specs and contract documents.

 Managing inspectors (welding, civil and E&I inspectors) for the PCI contract jobs and related Fab shop/Onshore as a lead QA/QC focal point & Test pack document review prior for testing.

 Quality auditing & site surveillance assessments for EPC contractors.

 Inspection experience in Pipe Rack Modules as per ITP, Ras gas Specifications & International standards & WQT test conducting and document review.

 Report on Performance Indicators resulting from Fabrication Yard monitoring/auditing activities

Sep. 12 – Apr.13
Company: Quality Control. (Egypt) 7 MONTHS
Project: 1000 BBL Crude Oil Tanks (30 Tanks)@Petromaint Work shop
Client: Khalda Petroleum Company.

Tank Inspector

 Perform Inspection for New Tanks Constructed as per API 650.

 Same activities mentioned above for Ras Gas Barzan project

Oct.10 – Aug.12 Company: Germanischer Lloyd, Qatar. 1 YEAR / 10 MONTHS

Project: Extension Of Linear Density Polyethylene(LDPE)

Client: Qatar Petrochemical Company (QAPCO).

Tank Inspector

QA/QC Sr. engineer  Same activities as above.

 

 Monitoring piping construction and fabrication activities.

 Witness the tests, controls and inspections, guarantee inspection status control for parts of the plant within the area of responsibility, authorizing their acceptance at quality control completion, obtain the relevant documentation and ensure the correct implementation of the approved Inspection Test Plan according to Client’s requirements.

 Review and approval of the construction execution plan for project phases, and prepare of daily and monthly construction activities.

 Supervise mechanical and piping installation work to ensure that work is completed on schedule and in conformity with drawings and spec.

 Reviewing all site work and prepare punch list for the construction.

 Checks that materials used on design meet specifications.

 Monitoring Piping Fabrication and installation method.

Apr.10- Oct.10
Company: Germanischer Lloyd, Qatar. 7 MONTHS
Project: shutdown
Client: Dolphin Energy.

Sr. Inspector

 Determine the condition of exposed pipe/fitting/support and insulation

 Produce an individual line condition reports for entry into the inspection management system (IMS) and Produce site isometric sketches

 Preparation and review of ITP and record all site modifications.

 Witness and Perform inspection and testing for PSV required as per API 527, 598 and Witness the calibration required for PSV.

Apr. 09 – Apr.10
Company: Germanischer Lloyd, Qatar. 1 YEAR
Project: EPIC Of strategic Gas Transmission Project (SGTP)
Client: Qatar Petroleum

TPI Surveyor

 In process inspection of orbital Automatic GMAW welding in 36”Pipeline.

 Monitor and verify that welding works are completed as per approved procedure and meets Project Quality Specification and procedure, Witness all Destructive Tests.

 Offer technical advice concerning welding matters.

 Evaluates new developments in welding field for possible application to current welding problems or production processes.

 Witness of all hydro-testing and PWHT activities for under and above ground piping work and Verify installation in accordance with relevant Specifications, Flow diagrams, Construction drawings and P&ID’& Reviewers of proposed welding procedures, WPQR and WPS.

 Prepare, establish, and implement Internal Quality Audit to success the QMS audit and ISO 9001 surveillance. Functions as Lead Auditor, and follows up on audit findings and corrective actions and Monitor any Post Weld Heat Treatment on site.

 Supervise mechanical and piping installation work to ensure that work is completed on schedule and in conformity with drawings and spec.

Feb. 08 -Apr.09 Company
Germanischer Lloyd, Qatar 1 YEAR
Project: Execution Of Low Linear Density Polyethylene(LLDPE) PLANT
Client: QATOFIN (Qatar Petrochemical Co. & Total Energy JV

QA/QC Sr. Engineer.

 Check and analyze drawings to determine specific work requirements.

 In charge for Punch listing of systems and facilities of the plant, prior to mechanical completion to ensure all work activities are completed.

 Writing technical reports and reviewing plans, specifications,

 Evaluates new developments in welding field for possible application to current welding problems or production processes.

 Witness of all hydro-testing and PWHT activities for under and above ground piping work and Verify installation in accordance with relevant Specifications, Flow diagrams, Construction drawings and P&ID.

 Review and approve of all project quality procedures.

 Supervise mechanical and piping installation work to ensure that work is completed on schedule and in conformity with drawings and spec.

 Reviewing all site work and prepare punch list for the construction.

 Checks that materials used on design meet specifications.

Jan. 98 – Feb. 08
Company: Petroleum Marine Services , Egypt 10 YEARS
Clients: Rashpetco, khalda, Gapco, Petrobel.

QA/QC Engineer

 Review Client Technical Specification (Drawings, Procedures, Specifications, Standard/Code) with preparation and provide of QAP, ITP, PQR and WPS that will be used to execute the Project. Interpretation and assessment of the radiographic film.

 Evaluates new developments in welding field for possible application to current welding problems or production processes& perform all internal and external audits on behalf of the company’s.

 Co-ordination with client, NDT agency and Destructive test lab including witness of the destructive testing Coordinate all QA/QC activities with the site QC manager

 Dealing with codes (API 1104, 571, 574, 577, AWS D1.1, DNV OS-F101, and ASME IX, V, 31.3, 16.5) and Supervision on the quality activities in the onshore and offshore sites.

 Establish Quality training program based on the project needs : PQP, Client Technical Specification, NCR & Cost of Quality and control the status of NCR using Statistical Technique in order to eliminate problems& Attend client quality management meetings

 Prepare, establish, and implement Internal Quality Audit to success the QMS audit and ISO 9001 surveillance. Functions as Lead Auditor, and follows up on audit findings and corrective actions and Monitor any Post Weld Heat Treatment on site.

 The preparation of the companies QA manual control and supervision of all amendments and revisions & Control and the distribution of all the companies quality documentation

 Verify contractor quality requirements are specified to vendors and contractor documentation submittals& Review quality inspection personnel qualifications and training requirements

 Attend all pre-bid meetings and coordinate all project requirements with the project bidders.

 The preparation and control of project quality system management documentation prior to project commencement& Monitor the disposition of all issued nonconformance reports.

 Monitor the progress and effectiveness of the project quality management system. Recommend and implement improvements when required& Action and close all customer complaints

 Coordinate all quality related correspondence with the customer’s representatives.

 Monitor statistical method reporting& Control all achieves documentation upon the completion