CV, Construction Manager, Oil, Gas And Petrochemical Industries

Available
Serial No: 18006
Skills keywords: auto caad, construction management, ms.office/project, staad.pro

Short Bio:

A self-motivated and results-oriented Civil and Structural Construction Management Professional with over 13 years in-depth experience working on Oil & Gas, LNG and Petrochemical facilities for India’s leading industries. Passionate about exceeding expectations with more than just results, adding value with continual process improvement and compliance to demanding standards. Adheres to high standards with regard to health and safety, consistently aiming for an incident and injury free culture.

Current location:  Port Harcourt, Nigeria - View on map
Nationality: Indian
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: english, Hindi, Tamil
Location I am interested in working: Anywhere

Qualifications

PG Diploma – Design & Construction of Concrete Technology Annamalai University, India 2009

Bachelor – Civil Engineering Madurai Kamaraj University, India 2001

Rehabilitation & Repair of Concrete Structures
Internal Auditor – ISO 9001

Offshore Certificates including Personal Survival Techniques, Elementary First Aid, Helicopter Under Water Escape, Sea Survival, Fire Fighting & Fire Prevention

Technical Expertise

 

 Large Scale LNG Storage Tank Construction

 Slip Form Techniques and DOKA Form work

 Re-Gasification Unit Construction

 Offshore Platforms – Fabrication through Installation

 Refinery, Gas Terminal with Slugcatcher

 Euro – IV Implementation Construction  Offshore Platform Weighing and Load Out

 SAT Crane Assembly Check and Load Test

 Petrochemical Plant Construction

 Plant Steel Structural & RCC Pipe Racks

 Interface Co-ordination & Execution

 Piling Work & Heavy Equipment Foundations

 Drawings & Construction Sequences

 Blasting, Painting & Fire Proofing Works  Barge Technical Analysis and Reporting

 Substation, Central Control & Pre-Engineered Buildings

 Early Identification & Mitigation of Risks

 Jetty, Cooling Water Tower, HVAC, Drainage & UG systems

 Project Charter, Contract Documents & Micro Planning

 Residential, Commercial and Infrastructure Construction

 Construction of Storage Tanks, Stacks/Chimney, Silos, Bunkers, Road, Pavements and Cable Trench

IT: STAAD.Pro, AutoCAD, MS Office, MS Project, SAP & 3 – D Model Review

Career Summary

ENGINEERS INDIA LTD Since 08/2005
PMC / Construction Manager (06/2014 – date) – US $ 1.25 Bn
Fertiliser Plant Project – Port Harcourt, Nigeria for client Indorama Eleme Fertilizer & Chemical Ltd

 Manage construction activities for an Ammonia (2300MTPD) and Urea (4000MTPD) plant along with offsite and utilities such as cooling tower, substation, central control building, structural works for reformer/convector/pre-heater units, equipment foundations that is leading 11142 tonnes of structural steel works from fabrication through to painting

PMC / Deputy Constrution Manager (03/2013 – 05/2014) – US $ 150 Mn
Onshore Gas Terminal – Andra Pradesh, India for client GSPC

 Complete responsibility for overall construction of terminal building and associated onshore pipeline, IVS station and unit piping for the 2nd largest Gas Terminal Slug Catcher unit in India

 Inspecting and monitoring 532tonne structural steel works for 42” diameter pipe and cable tray supports as well as 368m RCC slug catcher with various slopes and tiers, constructing RCC pipe rack and cable trench, painting and inspecting materials

PMC / Deputy Constrution Manager (01/2011-02/2013) – US $ 875 Mn
Gas Production & Processing Facilities, Offshore Platform – Andra Pradesh, India for client GSPC

 Construction of 2 Green field offshore platform fabrications through installations totalling 25000t such as jacket, piling and grouting, buoyancy tank, manifold skids, fender, lifting pad eye, sea fastening, shock cell, boat landing, top side modules (deck structure), helipad, riser protection and clamp, conductor sleeves and guide, pump caisson sleeves, skirt pile sleeves, transition pieces, spreader beam, grillage works, launch truss beam, handrail, escape ladder, cage ladder, staircase, cutting chequered plate to drawings, grating arrangements, fire proofing and witnessing load out and continuous tracking of sail out pre-fabricated items

 Assisting pre-commissioning team

 Experienced in installation of floating type jacket and lifting & installing type jacket

Construction Supervisor / PMC (02/2010 – 12/2010) – US $ 40 Mn
26 Unmanned Well Head Platforms – Mumbai High, India for client ONGC

 Brown field revamping or addition project involving fabrication and erection of steel structures such as pipe and cable tray supports, strengthening of helipad, staircase, boat landing, knee bracings, chequered plates and also replacing/modification/strengthening of damaged or corroded portions of any structural items on 18 manned and 8 un-manned platforms

Senior Engineer / EPCCM (07/2009 – 01/2010) – US $ 500 Mn
EURO IV Implementation Project – Chennai, India for client Chennai Petroleum Corporation Ltd

 Construction of DHDS unit, control room, RCC, structural steel-works and substation involving pipe racks, heavy equipment foundations, WBM road, pavement, compressor pump building, cable trenches with box culvert, blasting, painting, fire proofing, repairs and maintanence works

Supervision / EPCCM (01 – 06/2009) – US $ 3 Bn
OPAL Petrochemical Complex – Gujarat, India for client ONGC

 Overseeing piling and precast (H-type) pipe racks work, performing full raft of materials tests on facilities including bentonite slurry works as well as examination of rebar arrangements

Supervision / PMC (07/2006 – 06/2009) – US $ 700 Mn
LNG Storage Tank Project – Gujarat, India for client Petronet LNG Ltd

 Construction of India’s largest above ground full containment LNG storage facility comprising 2 off 148,000m3 and 2 off 155,000 m3 tanks with wall thickness of 800mm and base slab depth of 1000mm and regasification unit works, with later added scope supporting construction of standby jetty, liaising with backup consultant Tokyo Gas Engineering in Japan

 Inspecting and closely monitoring base slab, roof beam, wall jointing stability column, pre-stressed self-compacting concrete wall which will be strengthened by post tensioning methods which comprises of special jacks, pushers, strands, tendons, special duct, special grouting and inside top suspended deck with insulation

 Experienced in LNG Tank Insulation Works like perlite block, perlite powder and resilient blanket

Engineer / EPCCM (08/2005 – 06/2006) – US $ 2.5 Bn
ESSAR Oil Refinery Expansion – Gujarat, India for client ESSAR Oil Ltd

 Overseeing construction activities including piling works, silos, cooling water tower, bunkers, chimney, acid storage tanks, pipe racks, heavy equipment foundations, cable trenches with box culvert & concrete coating of pipes along with repair and rehabilitation of structures

 Structural work for captive power plant and steam co-generation plant; 120 MW refinery residue-based multi-fuel, captive, co-generation plant, with capacity to generate 77 MW of power and 230t of steam per hour

KASS ATHIRSTAM HOME PVT LTD 04/2001 – 07/2005
Site Engineer (04/2001 – 07/2005) – US $ 4.05 Mn

Housing Complex -Tamil Nadu, India for private clients

 Infrastructure improvement including commercial complexes and more than 100 residences with varying design including road infrastructure and furniture, drainage, raft, matt and various pile foundations, pre-cast structures and pre-tensioned concrete slabs for rail works

 






popup-img