Short Bio:

4 years experience of end to end site engineering & construction management of projects in highways, reinforced earth wall, precast arch bridge & twin section vehicular underpass. Internal auditing of all zonal sites for safety, quality & overall management. Hold valid Indian passport & IELTS score.

Current location:  Bangalore, India - View on map
Nationality: Indian
Preferred Sector of Employment:  , Manufacturing and Operations
Spoken languages: Bengali, english, Hindi, Oriya
Location I am interested in working: Anywhere

Profile

 B.Tech in Civil Engineering with 3 years 11 months experience of site engineering and project management in construction of Reinforced Earth Wall, Precast concrete structures & Highways.

 Presently working as Project Engineer with Reinforced Earth India Pvt Ltd, Bangalore.

 Hold a valid Indian passport.

Key Skills

• Handle EPC & EPS projects proficiently

• Liase with clients & consultants

• Working Knowledge of AutoCAD, MS Project, MS Excel, MS Word, MS PowerPoint

• Good presentation & communication skills

• Project site audit for safety, quality, accounts

 

Job Profile

• Planning & Execution of project work

• Estimation of BOQ & reconciliation of material

• Construction Budgeting

• Monitoring of safety, time, cost, quality

• Project specific Hazard Identification & Risk assessment

• IMS, statutory compliance & documentation

Career Summary

Employer : Reinforced  Earth India Pvt Ltd
Period : January 2013, till date

Designation : Project Engineer

Responsibilities

• Establishing site operations for new project (Includes liasoning with client, local vendors & labour contractor for the needful).

• Calculation and estimation of construction budget, BOQ & placing procurement scheme and schedule for inventory.

• Hazard Identification & Risk assessment for project and ascertain corrective & preventive actions for entire project works.

• Monitoring of day to day works (Casting & erection of units like arch, walls, slabs, panels) as follows :

 Cutting, bending & binding of rebars for making of rebar cage as per specification.

 Shuttering & deshuttering of moulds with cleaning, oiling.

 Placing of rebar cage, placing of accessories and fixing of shutters in true line & level as per drawing.

 Pouring of concrete while monitoring time taken to pour, slump & compaction.

 Cube testing for attained strength and demoulding & stacking of units for curing.

 Checking and recording of post concrete dimensions & faults of units in comparison to desired specifications.

 Loading & unloading of units for shifting to erection site.

 Erection & alignment of units with matching faces and proper joints.

 Insitu stitching of units by binding rebars & pouring of concrete.

 Making daily progress report & monthly progress report.

 Maintaining test reports & data for concrete, steel & other lifting accessories.

 Monitor record of assets & consumable inventories for making monthly reconciliation report.

 Liasoning with consultant for day to day approval of works.

 Compliance of safety related activities on daily basis for contractors as well as our own employees.

 Checking and verification of sub contractor’s bills.

1) Project : Precast Arch Bridge at Brigade Orchards, Bangalore.
(From January 2013 to January 2014)

Project Features : Road over bridge by precast arch & Reinforced Earth Wall.

2) Project : Road over bridge at Allalasandra Railway gate, Bangalore
(From January 2014 to August 2014)

Project Features : Reinforced Earth Wall

3) Project : Signal free corridor for BBMP, Bangalore
(From August 2014 till date)

Project Features : Precast twin section vehicular underpass

Employer : Simplex Infrastructures Ltd
Period : July 2011 to December 2012

Designation : Assistant Engineer

Responsibilities

• Worked in highways from making of earthwork embankment, subgrade, GSB, WMM,DBM and reinforced earth walls associated with flyover approach.

• Taking measurements and quantities of earth fill using autolevel.

• Coordinate construction activities; provide technical inputs for methodologies of construction for assurance of quality of works & coordination with site management.

• Day to day supervision & execution of works at site.

• Taking out quantities from drawings for planning, material procurement & billing.

• Preparation of work scheduling for execution.

• Liaise with consultants for determining technical specifications, approvals for execution & obtaining on-time clearances.

• Carrying out insitu field dry density test on non cohesive soils.

1) Project : 6 laning of NH5 from Bhubaneswar to Chandikhole, Bhubaneswar. (From July 2011 to December 2012)

Project Features : Widening of existing 4 lane to 6 lane, including bridges, culverts, vehicular underpass, flyovers, service roads, Railway over bridge.

Degree/ Year Institution Cumulative GPA/Certificate Percentage

B.TECH(Civil) 2011 NIT Jalandhar, Punjab 6.23

Class XII AISSCE 2006 Deepika English Medium School, Odisha 74.4 %
(CBSE)

Class X AISSE 2004 Deepika English Medium School, Odisha 85 %
(CBSE)

Projects/Training

• Curriculum Project (Aug 2010) – Titled as “Influence of flyash & lime on compaction & strength properties of expansive soil.”

• Industrial training (Jun 2010) at Rourkela Steel Plant, SAIL –Underwent 6 weeks interactive training session with the engineers & workers at the plant site.

• Survey Camp (Jun 2009) –Training of 15 days in Dalhousie for practical applications of Field Surveying.

• CAD Training (Jun 2008) –Successfully completed training on AutoCAD for 45 days from Software Technology Parks Of India, Rourkela.

• Workshop training (Jun 2008) –Two weeks institutional training organized by Manufacturing Process Lab at NIT Jalandhar.

Achievements

• Based on capability, in addition to handling operations, bestowed upon with monitoring safety of all SEZ South sites at from September 2013 till date.

• Secured 7.5/10 in IELTS Academic Test in June 2014, valid for 2 years till May 2016.

 