CV, Chemical Engineer targeting the Oil and Gas Industry Worldwide

Available
Serial No: 24715
Skills keywords: current affairs, goal stting, primavera, supply chain management, team leader

Short Bio:

 B.Sc. in Chemical Engineering.
 Now Engineer LNG/LPG in Sui Northern Gas Pipe Line (Pak).
 Assistant Chemical Engineer in Sitara Chemical Industry (Pak).
 Familiar with HSE Standards.
 Familiar with QC Methods and Standards.
 Familiar with QMS (ISO 9001:2000) Standards
 Familiar with EMS (ISO 14001:1996) Standards
 Good analytical, problem solving, communication and interpersonal skills.
 Possess strong process handling, with maintaining quality parameters & smooth plant. Operation wit

Current location:  Ajman, United Arab Emirates - View on map
Nationality: PAKISTANI
Preferred Sector of Employment:  Oil, Gas and Energy, Manufacturing and Operations
Spoken languages: english, Urdu
Location I am interested in working: Anywhere

Education
B.Sc. Chemical Engineering (2003-2007) (1st Division)
University of Engineering and Technology (UET-Lahore)

F.Sc. Pre-Engineering (2001-2003) (1st Division)
Board of intermediate, Faisalabad

Matriculation (1998-2000) (1st Division)
LaSalle High school, Faisalabad

Experience
LNG/LPG Engineer in Sui Northern Gas Pipe Line Limited (SNGPL) Pakistan (30th April 2012 Till now)
A Government (Oil & Gas) Company Dealing in Transmission and Distribution of Natural Gas and Also Dealing in LPG-LNG Projects.
 Working on LPG, LNG, Installation of SNG synthetic natural gas project is in progress (Air-mix project) having capacity 20 MMBTU/Hr, (0.5 MMCFD).

 Having responsibility of all LNG Project for LNG (Handling, Storage, and Re-gasification of LNG).

 Working on FOB (free on board) contracts and DES (direct ex-ship) contracts for LNG Imports.

 Preparing and review of business plan for LPG project in the SNGPL franchise area.

 Prepare tender document pre-qualification/expression of interest documents required for the development of LPG-LNG project / facilities.

 Working on revamping and upgrading of two LPG bottling plant.

 Preparation and review of LPG Auto gas business model and evaluating station and layout, equipment installation and legal requirements.

Assistant Chemical Engineer (Role Shift Engineer) Working in Sitara Chemical Industry Limited (SCIL) Faisalabad, Pakistan. (10 March 2008 to August 2010)
 Brine purification settling by using Nalco for sulphates removal, filtration and decalcifying tower.

 Use of vacuum technology in various processes using steam ejectors and liquid ring vacuum pumps.

 Conveying systems using screw conveyers, bucket elevators, belt conveyers, tube conveyers etc






popup-img